EPID:L-2018-LLR-0139
From kanterella
Revision as of 00:02, 11 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
EPID - L-2018-LLR-0139, Relief Request Number RR 5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations (Open) 20 November 2018, 24 November 2018, 26 November 2018"20 November 2018, 24 November 2018, 26 November 2018" contains more than three components required for a date interpretation. - 26 April 2019 | |
|---|---|
Request for: - Relief Request Open | |
| |
| From: | |
MONTHYEARML18330A1412018-11-20020 November 2018, 24 November 2018, 26 November 2018
[table view]Title: Relief Request Number RR 5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18330A1422018-11-26026 November 2018 Title: Relief Request Number RR 5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18337A1402018-11-29029 November 2018 Title: NRR E-mail Capture - Draft Request for Additional Information Related to Palisades Relief Request 5-7 ML18337A1382018-11-30030 November 2018 Title: NRR E-mail Capture - Request for Additional Information Related to Palisades Relief Request Number RR 5-7 PNP 2018-059, Response to Request for Additional Information for Relief Request No. RR-5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations2018-12-0303 December 2018 Title: Response to Request for Additional Information for Relief Request No. RR-5-7, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18340A0072018-12-0606 December 2018 Title: Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML19108A3632019-04-23023 April 2019 Title: Request for Withholding Information from Public Disclosure ML19112A3172019-04-26026 April 2019 Title: Approval of Alternative for Repair of Reactor Pressure Vessel Head Penetrations 2018-11-30 | |