ML060060018

From kanterella
Revision as of 08:28, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Millstone, Units 2, Tech Spec Page for Amendment 290 Regarding Changes to Technical Specification Surveillance Requirement for Trisodium Phosphate
ML060060018
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/03/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC6257
Download: ML060060018 (1)


Text

MGENCY CORE COOLING SYSTEMS TRISQpU 2SPHATEIISP LIMITNG CONDIMON FOR OPERATION 3.5.5 The TSP baskets shall contain 282 ft 3 of active TSP.AppAlIABLMD MODES 1, 2, and3 AMTON: With the quantity of TSP less than required, restore the TSP quantity within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or f be in MODE 3 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE REQURMESNTS 4.5.5.1 Verify that the TSP baskets contain 282 t 3 of TSP at least once per 18 months.4.5.52 Verify that a sample from the TSP baskets provides adequate pH adjustment of borated water at least once per 18 months.MILLSTONE

-UNIT 2 3J4 5-9 Amendment No. 245 , 290