Robinson Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2 2515/169 IP Mitigating Systems Performance Index Verification 3 DRP/BR4-PI&R Baseline Inspections 10/02/2006 10/20/2006 2 71152B IP Identification and Resolution of Problems 5 OL PREP-INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 PSB1-RP-RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2 71151 IP Performance Indicator Verification 5 OL EXAM-INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 OL RQ-REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2 7111111B IP Licensed Operator Requalification Program 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2 7111108P IP Inservice Inspection Activities - PWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2 7112102 IP A LARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2 71151 IP Performance Indicator Verification 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2 7111108P IP Inservice Inspection Activities - PWR 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 04/29/2007 05/04/2007 2 71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1 PS2-EP-EP INSP Baseline Inspections 06/25/2007 06/29/2007 2 71151 IP Performance Indicator Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2 7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2 7111121 IP Component Design Bases Inspection 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5 TFP-TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2 7111105T IP Fire Protection [Triennial]
5 TFP-TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 11/05/2007 11/09/2007 2 7111105T IP Fire Protection [Triennial]
2 PS2-EP-EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2 7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.