ML062720004

From kanterella
Revision as of 03:09, 26 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

E-mail, Miller, NRR, to O'Keefe, Fple, Seabrook License Amendment Request 05-08
ML062720004
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/28/2006
From: Miller G E
Plant Licensing Branch III-2
To: O'Keefe M
Florida Power & Light Energy Seabrook
References
LAR 05-08, TAC MC8554
Download: ML062720004 (2)


Text

From: Ed MillerTo:michael_okeefe@fpl.comDate: 09/28/2006 3:04:26 PM

Subject:

LAR 05-08Mike, Currently, FPLE procedurally limits operational primary-to-secondary leakage to 150 gallons per day (gpd) per Steam Generator (SG) compared to the Technical Specification (TS) limit of 500 gpd per SG. Upon further review, the staff determined that this procedural restriction needs to be contained in a license condition stating that FPLE will maintain the operational limitof primary-to-secondary leakage at 150 gpd per SG and if this limit is exceeded, Seabrook willtake the appropriate actions in accordance with TS 3.4.6.2, "Reactor Coolant System Leakage." An e-mail, to be docketed, confirming the acceptability of this condition will be sufficient.

G. Edward Miller Project Manager Division of Operating Reactor Licensing U.S. Nuclear Regulatory Commission (301) 415-2481 Mail Envelope Properties(451C1CBA.C19 : 9 : 35080)

Subject:

LAR 05-08Creation Date 09/28/2006 3:04:26 PMFrom: Ed MillerCreated By:GXM@nrc.govRecipientsActionDate & Timefpl.comTransferred09/28/2006 3:04:52

PM michael_okeefe (michael_okeefe@fpl.com)Post Office DeliveredRoutefpl.comFilesSizeDate & Time MESSAGE123309/28/2006 3:04:26 PM TEXT.htm1178Options Auto Delete:

No Expiration Date:None Notify Recipients:Yes Priority:Standard ReplyRequested:

No Return Notification:None Concealed

Subject:

No Security:Standard To Be Delivered:Immediate Status Tracking:Delivered & Opened