NEI 07-12, Fire Probabilistic Risk Assessment (Fpra) Peer Review Process Guidelines Draft Version F, Rev. 0.
ML073551166
Person / Time
Site: Nuclear Energy Institute
Issue date: 12/20/2007
From:
AREVA NP, BWR Owners Group, General Electric Co, PWR Owners Group, Westinghouse
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, Nuclear Energy Institute
References
NEI-07-12, Rev 0
Download: ML073551166 (72)


Text

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT NEI 07-12 Fire Probabilistic Risk Assessment (FPRA)

Peer Review Process Guidelines Draft Version F Rev. 0 Prepared for Nuclear Energy Institute (NEI)

Fire PRA Task Force (FPRATF)

Prepared by BWROG/General Electric Nuclear Energy PWROG/AREVA NP Inc. & Westinghouse Electric Co.

based on material originally published as NEI 00-02 NEI 05-04

December 2007

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007

NOTICE Neither NEI, nor any of its employees, members, supporting organizations, contractors, or consultants make any warranty, expressed or imp lied, or assume any legal responsibility for the accuracy or completeness of, or assume any liab ility for damages resulting from any use of, any information, apparatus, methods, or process as disclo sed in this report or that such may not infringe privately owned rights.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 iii Executive Summary This document provides guidance material fo r use in conducting and documenting a Fire Probabilistic Risk Assessment (FPRA) Peer Review. The Peer Review process provides the method for reviewing a Fire PRA against the ANS Fire PRA Standard, BSR/ANS 58.23.

The Peer Review Process and guidance material was developed using the guidance in NEI 00-02, Industry PRA Peer Review process Guidelines, Revision A3, and NEI 05-04, Rev. 1, Process for Performing Follow-on PRA Peer Reviews using the ASME PRA Standard.

The FPRA Peer Review is a written process th at is necessary to satisfy the peer review requirements of the Fire PRA Standard. With a process available and implementation by the FPRA owners, it is expected that the result will be to streamline regulatory review of risk-informed applications. Thus, an attempt has been made, in this program, to maintain consistency with the original Peer Review to the extent feasible.

[Executive Summary to be expanded upon document completion.]

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 iv Acknowledgments This report is a summary of work made possible by the cooperative efforts of a diverse group

of participants. Add participants list here.

Some notes to be included later:

The original peer review process was developed by the Boiling Water Reactor Owners Group (BWROG). The BWROG peer review process was adapt for use for the entire industry by the Westinghouse Owners Group (WOG), Babcock & Wilcox Owners Group (B&WOG), and the Combustion Owners Group (CEOG), now collectively known as the Pressurized Water

Reactor Owners Group (PWROG). This document is based on the industry document NEI 00-02, that was the basis for virtually all of the original Internals Events PRA peers reviews that were conducted in the late 1990s. This document is also based on the industry document NEI 05-04, Rev. 1, which describes the process for performing a Follow-on P eer Review using the ASME PRA Standard. In particular the support of the BWROG and PWROG is acknowledged with the support of Dennis Henneke (GE), Stanley Levinson (AREVA NP), David Finnicum (Westinghouse), and

Greg Krueger (Exelon). The authors appreciate the review efforts of NEI's FPRATF and the Nuclear Regulatory Commission (NRC).

[To be expanded upon completion.]

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 v Table of Contents Section Page Executive Summary..........................................................................................................iii Acknowledgments............................................................................................................iv

Table of Contents..............................................................................................................

v Acronyms.......................................................................................................................

vii 1. INTRODUCTION.........................................................................................................1-1 1.1 Overview and Purpose.....................................................................................1-1

1.2 Scope.............................................................................................................1-3 1.3 Background....................................................................................................1-3

1.4 Process

Overview............................................................................................1-5 1.5 FPRA Peer Review Capability Categories.........................................................1-10

1.6 Document

Organization.................................................................................1-10 2. PEER REVIEW PROCESS.............................................................................................2-1 2.1 FPRA Peer Review Process Description.............................................................2-1 2.2 FPRA Peer Review Team..................................................................................2-9 2.3 Host Utility Preparation and Participation Request...........................................2-11 2.4 Review Week Agenda....................................................................................2-11 3. FPRA PEER REVIEW PROCESS ELEMENTS AND GUIDANCE............................................3-1 3.1 Overview........................................................................................................3-1 3.2 Peer Review Process Criteria.............................................................................3-1

3.3 Assignment

of Capability Categories...................................................................3-5

3.3.1 Process

for Peer Reviews Against ANS Fire PRA Standard.......................................3-5

3.4 Additional

Guidance on the Technical Elements Review........................................3-7 3.5 Follow-on FPRA Peer Review.............................................................................3-8 3.6 FPRA Level of Detail.........................................................................................3-9 4. PEER REVIEW PROCESS RESULTS AND DOCUMENTATION...........................................4-1 4.1 Peer Review Report..........................................................................................4-1

4.2 Process

Summary Forms and Information...........................................................4-1

4.3 Process

Feedback............................................................................................4-2 4.4 Follow-on Peer Review.....................................................................................4-2 5. REFERENCES.............................................................................................................5-1 NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 vi Appendix A....................................................................................................................A

-1 Appendix B....................................................................................................................B

-1 Appendix C....................................................................................................................C

-1 Appendix D...................................................................................................................D-1 NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 vii Acronyms ANS American Nuclear Society ASME American Society of Mechanical Engineers B&WOG Babcock & Wilcox Owners Group BWR Boiling Water Reactor BWROG BWR Owners Group CEOG Combustion Engineering Owners Group CF Circuit Failure Analysis (technical element)

CNRM Committee on Nuclear Risk Management CS Cable Selection and Location (technical element)

DA Data Analysis DE Dependency Analysis EPRI Electric Power Research Institute ES Equipment Selection (technical element)

FHA Fire Hazards Analysis (or Assessment)

F&O Fact & Observation (form)

FPRA Fire Probabilistic Risk Assessment FQ Fire Risk Quantification (technical element)

FSS Fire Scenario Selection and Analysis (technical element)

GL Generic Letter HLR High Level Requirement HR Human Reliability HRA Human Reliability Analysis IGN Ignition Frequency (technical element)

LOCA Loss of Coolant Accident MU Maintenance and Update N/A Not Applicable NEI Nuclear Energy Institute NRC Nuclear Regulatory Commission PP Plant Partitioning (technical element)

PRA Probabilistic Risk Assessment PRM Plant Response Model (technical element)

PSA Probabilistic Safety Analysis PWR Pressurized Water Reactor PWROG PWR Owners Group QA Quality Assurance QLS Qualitative Screening (technical element)

QNS Quantitative Screening (technical element)

QU Quantification and Results Interpretation R&R Risk & Reliability (Workstation)

RISC Risk-Informed Standard Consensus (Committee)

SC Success Criteria SF Seismic Fire Interactions (technical element)

SR Supporting Requirement SSC System, Structure, and Component T-H Thermal-Hydraulic NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 viii UNC Uncertainty Analysis (technical element) WOG Westinghouse Owners Group NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-1 1. INTRODUCTION

1.1 Overview

and Purpose The objectives of the Fire Probabilistic Risk Assessment (FPRA) 1 Peer Review process are to:

provide a consistent and uniform method for establishing the technical adequacy of a FPRA for a spectrum of potential risk-informe d plant licensing applications for which the FPRA may be used; and provide a means for identifying, over time, ar eas of consistency or inconsistency in the treatment of issues important to understandi ng plant fire risk and implementing risk-informed applications.

The FPRA Peer Review employs a team of PRA, FP RA and Fire Protection engineers, each with significant expertise in PRA and FPRA developmen t, Fire Modeling, Circuit Analysis, and risk-informed applications (that may require an understan ding of fire risk). The Peer Review Team is guided by the High Level Requirements (HLR) and Supporting Requirements (SRs) in the ANS FPRA Standard [1]. The FPRA Standard provides both an objective review of the FPRA technical elements, and an assessment, based on the Peer Review Team members' FPRA experience, of

the technical adequacy of the FPRA elements to support risk-informed applications. The team uses a set of Capability Category Summary Sheets as a framework within which to evaluate the

scope, comprehensiveness, completeness, and fidelity of the FPRA being reviewed.

One of the key aspects of the review is an a ssessment of the Maintenance and Update process used to ensure that the FPRA continues to reflect the configuration of the plant over time, so that the results and conclusions of FPRA applications al so continue to be consistent with the as-built, as-operated plant. This is a necessary aspect of a FPRA so that it can be used to support risk-informed applications. Another key aspect of the FPRA peer review is the completion of a previous Internal Events PRA Peer Review and the review of the fact and observation sheets (F&Os) for relevance to the FPRA. This ensures consistency with the Internal Events PRA Peer Review, and the ability to rely on the Internal Ev ents PRA Peer Review for aspects of the FPRA that are similar to the Internal Events PRA model (i.e., system modeling, data, etc.).

A desired outcome of using the FPRA Peer Revi ew process is to show conformance with the ANS Fire PRA Standard to the extent that certai n risk-informed applications can be supported.

A byproduct of using the ANS Fire PRA Standard (a nd this FPRA Peer Review process) is that the regulatory review process for risk-informed applications may be expedited. Thus, an

attempt has been made, in this process, to mainta in consistency with the original Internal Events PRA Peer Review [Reference 1] and the Follow-on Peer Review [Reference 2] to the extent feasible 2. Consistency with the Internal Events PRA Peer Review is to ensure that conclusions reached for that process can continue to be used for the FPRA. Consistent with this industry

objective, substantial portions of the Internals Event PRA Peer Review and follow-on Peer Review 1 Note that, while the term PRA is used throughout this document, no distinction is made between PRA and PSA (probabilistic safety analysis).

These terms are used interchangeably.

2 The original peer reviews were either base d on NEI 00-02 or directly against the ASME PRA Standard. When done against NEI 00-02, a self-assessment is necessary to bridge the "gap" between NEI 00-02 and the ASME PRA Standard.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-2 and documentation have been incorporated directly into this FPRA Peer Review document. An additional desired outcome of the Peer Review is to provide a forum for the exchange of ideas

and techniques for effective use of FPRAs among pa rticipating utilities. This is accomplished by the participation of knowledgeable utility pe rsonnel on the FPRA Peer Review Teams.

The FPRA Peer Review process discussed below also includes a follow-on Peer Review. In general, a Follow-on Peer Review implies that an initial FPRA Peer Review has already been conducted, and at least the level A/B F&Os from that review have been addressed. A Follow-on Peer Review would be needed as a result of a FPRA upgrade, performed either in response to a peer review or as a result of the normal evolution of the FPRA model. A change that constitutes a PRA upgrade is defined in Section 2 of the ASME PRA Standard. In some cases, a Follow-on Peer Review may be requested fo r the entire FPRA model because of changes made to the methodology throughout the PRA model. Thus, a Follow-on Peer Review's scope can be as narrow as a single FPRA technical elem ent, or as expansive as a peer review of the entire FPRA.

The FPRA peer review requires the successful completion of an Internal Events PRA 3 peer review (using NEI 00-02 and/or NEI 05-04). The Internal Events PRA peer review encompasses both the models and methods used to develop the Internal Events PRA, on

which heavy reliance is placed during the FPRA development. As such, these models and

methods should not need to be reviewed again during the FPRA peer review. Exceptions to this conclusion include:

F&Os that were not addressed prior to the FPRA peer review, recent updates affecting the FPRA, and unique system models, event trees, and other PRA model inputs developed as a part of the FPRA.

The review of Internal Events PRA model issues is addressed in the self-assessment discussion in Section 1.4 below. A follow-on Peer Review of the Internal Events PRA is not required prior to performing a Follow-on Peer Review of the FP RA, unless the model upgrade or changes affect both the Internal Events PRA and the FPRA.

1.2 Scope

The FPRA Peer Review is a one-time 4 evaluation that examines both the current FPRA, and the FPRA Maintenance and Update process. Us ing the FPRA Peer Review process, reviewers assign Capability Categories to the various technical elements of the FPRA. By including an

examination of the Maintenance and Update process, the FPRA addresses the mechanism by 3 Internal Fire has historically been considered an external event, but is defined in RG 1.200 as an internal event. References to an Internal Even ts PRA are meant to refer to the PRA for internal events other than fire.

4 Note that "one-time" in this context means once for the existing FPRA scope and approach. It is not expected that any additional full peer review would be required unless substantial changes are made to the model. Similarly, substantial modifications to the me thodology used in the existing FPRA or PRA, such as changing from a large ev ent tree (support system modeling) approach to a large fault tree (fault tree linking) approach migh t warrant additional peer review, even if the current PRA scope were unchanged.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-3 which the FPRA will continue to adequately refl ect the as-built, as-operated plant to support risk-informed applications. The Capability Categories denote the relative capability of the

technical elements for use in FPRA applications.

Among the most important elements to ensure a usable and successful FPRA for applications are: FPRA/PRA organization, management attention, communication between the PRA group and othe r parts of the organization, such as the Fire Protection Staff, FPRA technical adequacy, and living FPRA process, including maintenance and updates.

The first three elements are plant-specific mana gement issues that should be addressed by each utility to ensure successful use of the FPRA in applications. The last two items are FPRA-specific items, which are the focus of the Peer Review.

The general scope of this implementation of the FPRA Peer Review includes review of 12 main

technical elements, using tables (to cover the HLRs and SRs) shown in Appendix B, for FPRA.

1.3 Background

In 1997, the Boiling Water Reactor Owners Group (BWROG) developed a process for performing a peer review of a plant's Level 1 at-power PRA models that would assess the capability of the PRA for various risk-informed applications and also assess whether a process was in place to provide a means for the long-term maintenance of that level of capability. The key features of the BWROG process were a highly structured schedule for

a focused review of the PRA and a set of 11 tables to be used to document the review of ten technical elements of an Internal Events PRA, plus the program in place for maintenance of the PRA models, and a four-level grading scheme for the 11 technical

areas. The Combustion Engineering Owners Group (CEOG) adopted the BWROG peer review process

with some slight modifications. In parallel, th e Nuclear Energy Institute (NEI), working with the Westinghouse Owners Group (WOG), the Babcock & Wilcox Owners Group (B&WOG) and

the CEOG, adopted the BWROG peer review proce ss and revised the checklists to incorporate pressurized water reactor (PWR) specific item s, as needed. NEI issued NEI 00-02 as the industry standard for performing PRA peer revi ews. The industry peer review presented in NEI 00-02 was intended to cover a single peer review of a utility's PRA with on-going

maintenance of the capability of the PRA cove red by reviewing the utility's PRA Maintenance and Update process to ensure that it was sufficient to maintain the PRA at the appropriate capability level.

In April 2002, the American Society of Mechanical Engineers (ASME) issued ASME RA-S-2002, the ASME PRA Standard; this was updated with Addendum A in December 2003 (Reference 3) and Addendum B in December 2005 (Reference 4). Section 5.4 of the ASME PRA Standard NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-4 requires a peer review for PRA upgrades

5. (Note: The ASME PRA Standard defines PRA upgrade as "the incorporation into a PRA mode l of a new methodology or significant changes in scope or capability. This could include items such as new human reliability analysis methodology, new data update methods, new a pproach to quantification or truncation, or new treatment of common cause failure.") NEI 05-04, "Process for Performing Follow-on Peer

Reviews using the ASME PRA Standard" was deve loped because the overall scope and set of detailed requirements in the ASME PRA Standard are somewhat different than that of NEI 00-

02. Thus, peer reviews conducted in accordan ce with NEI 00-02 do not cover the full scope of the ASME PRA Standard. In Appendix B of Regulatory Guide 1.200 (RG 1.200) (Reference

5), the Nuclear Regulatory Commission (NRC) re cognized the validity of the peer reviews conducted in accordance with NEI 00-02 as partially covering the scope of the ASME PRA

Standard and they endorsed the concept of pe rforming a self-assessment to show compliance with ASME PRA Standard requirements, includ ing those not covered by the NEI 00-02 peer reviews. Appendix B of RG 1.200 explicitly identifies which ASME PRA Standard requirements

are either not covered by the NEI peer review ch ecklists or are only partially covered and thus specifies the scope of an incremental self-a ssessment (i.e., gap analysis) to bring the NEI review to adequate equivalence with the ASME PRA Standard, given that an NEI peer review has been previously performed.

In November 2007, the American Nuclear Society (ANS) issued the Fire PRA Standard (Reference 9) that is the basis for the peer review scope and methods. The ANS Fire PRA Standard references the ASME PRA Standard in three ways. First, a review of the internal events against the ASME PRA Standard is requ ired as a starting point for meeting the ANS Fire PRA Standard. The performance of a peer review of the Internal Events PRA against the ASME PRA Standard, and a review of open Intern al Events PRA F&Os is therefore the starting point for the FPRA peer review. Second, the SRs for developing system models and

supporting analysis (data, HRA, etc.) refer to the ASME PRA Standard HLRs and SRs. These two attributes need to be considered during the peer review for a FPRA. Finally, the ANS Fire PRA Standard adopts many of the ASME PRA Standard requirements, such as Section 5.4 for

upgrades, and others.

Although the ANS Fire PRA Standard requires th e completion of internal events review, many of the issues can have no effect on the FPRA or can have a smaller effect due to minor impact

on the FPRA results. For example, thermal-hydraulic (T-H) analysis for medium or large loss of coolant accident (LOCA) may have no effect on the FPRA (no fire-induced medium or large

LOCA is postulated). However, the T-H analysis for a small LOCA can be shown to have a major impact on the Internal Events PRA, but a minor impact on the FPRA, if the fire-induced small LOCA sequences are relatively unimportant for the FPRA. Figure 1-1. FPRA Peer Review Process

1.4 Process

Overview The overall process includes two main steps, as illustrated in Figure 1-1. These are:

5 The BWROG has written a white paper to distin guish between a PRA update and upgrade, thus helping to clarify when a Follow-on Peer Review would be necessary (to satisfy the ASME PRA Standard). This white paper has been adapted as a non-mandatory Appendix of the ASME PRA Standard.

Ye s Fire PRA Peer Review Process

Familiarization Perform Pre-Peer Review Self-

Assessment, Review of Previous Internal Events PRA Peer Review

Findings, and F&O Dispositions Okay?

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-5 1. a FPRA self-assessment, review of previous Internal Events PRA Peer Review findings/observations, or other preparatory activity, conducted by the Host Utility prior to the peer review; and

2. the peer review itself.

FPRA Peer Review Preparatory Review and Self-Assessment

Prior to the performance of the Peer Review Te am preparatory review, the Host Utility should perform a self-assessment against the guidance in this document and the ANS Fire PRA Standard. This self-assessment will help identi fy any known issues with the existing FPRA, and allow the utility a chance to either correct any issues or to disposition any self-assessment F&Os. The self-assessment should also identify all FPRA documentation to support specific ANS Fire PRA Standard SRs.

An objective of the recommended preparator y self-assessment is for the Host Utility to identify areas where the baseline FPRA should be improved before being used for particular risk-informed applications. This self-assessment is largely based on the peer review guidance and, although not an independent review, provid es a basis and opportunity for a critical re-evaluation of how well the FPRA has been constructed and maintained.

Additional objectives of the preparatory review and self-assessment are:

to have an opportunity to identify and addre ss, prior to the arrival of the Peer Review Team, using guidance similar to that used by the peer reviewers, areas where the FPRA

may require: additional or alternative documentation, addition technical analysis, or process improvements; and to review documentation, and ensure that as complete a set of documentation as feasible is available for the reviewers, including a description (roadmap) of where the ANS Fire

PRA Standard SRs for each technical elemen t are documented, to streamline the peer review and allow for a more effective review; to review the Internal Events PRA P eer Review results including open and closed/dispositioned PRA F&Os, and docume nt the effect of these on the FPRA.

The self-assessment includes a review of the In ternal Events PRA F&Os, including both open and closed F&Os, and the associated dispositions. For open F&Os, the review should be to determine if the FPRA is affected by the F&Os , and the magnitude of the effect. For closed F&Os, a review of dispositioned F&Os should be performed to determine if the disposition is also applicable to the FPRA model. It is impo rtant to ensure that the disposition against the Internal Events PRA is either not applicable to the FPRA or would be the same disposition when FPRA is considered. Where the dispos ition would be different, this needs to be documented, including potential improvements to the PRA during the development of the FPRA.

Sufficient time should be allocated between the self-assessment/preparatory activity and the

FPRA Peer Review to either address such area s, or to formulate plans for how they may be addressed, prior to the peer review.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-6 FPRA Peer Review Process

The FPRA Peer Review includes the following steps, which are discussed in the sections below:

1. Collect plant and FPRA information for pre-visit review (see Sections 2.3 and A.5)
2. Identify and assemble the Peer Review Team (see Section 2.2)
3. Pre-visit review of selected material and Host Utility self-assessment
4. Pre-visit telecoms, as necessary
5. Identification of specific information required during on-site visit
6. Pre-visit visit (by Team Lead), as necessary
7. On-site visit, including:

a) interaction with the Host Utility FPRA group to obtain an overview of the FPRA (see Section A.8) b) examination of each FPRA technical element using questions and review summary sheets (see Section 3.2) c) verification of spatial dependencies by walkdown 6 d) examination of results of a FPRA sensitivit y run(s) performed during the peer review (see Section A.7) e) examination of the FPRA Maintenance and Update process

8. Develop preliminary findings and results
9. Closeout meeting
10. Follow-up team telecoms
11. Follow-up Host Utility telecoms, as necessary
12. Development of draft report
13. Review of draft report by Host Utility
14. Provide the Final Report of the FPRA Peer Review

A flowchart of the FPRA Peer Review process is sh own in Figure 1-3. This figure describes the general approach and process steps used in the application of the FPRA Peer Review process to an individual FPRA. The reviewers begin prior to their arrival on-site, by reviewing material

provided in advance by the Host Utility. This review includes:

Internal Events PRA peer review (including gap assessment) and F&Os (including the open and closed/dispositioned F&Os), plant self-assessment performed prior to the peer review, including the review of both open and closed/corrected issues, and documentation provided to the Peer Review Te am in support of meeting the ANS Fire PRA Standard requirements.

The Peer Review Team should begin its initial review of the FPRA against the ANS Fire PRA Standard prior to arrival. This will allow the Peer Review Team to focus on walkdowns and details of the FPRA during the on-site visit. Note that during the site visit, most or all of the

Peer Review Team will likely be involved in one or more walkdowns, and this should be

accounted for in the schedule.

6 Unlike the Internal Events PRA walkdown, the FPRA walkdowns may involve most of the Peer Review Team in order to review plant partitioning, ignition frequencies, scenario development, fire modeling and seismic fire requirements.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-7 The on-site FPRA Peer Review is a one-week, ti ered review in which the reviewers begin with relatively high-level element review summary sheets and criteria, and progress successively to

additional levels of detail, as necessary to en sure the robustness of the model. This is an intensive week, following a relatively rigid schedu le (see Attachment 3 of Exhibit A-1) so that all of the required elements are adequately covere

d. This schedule should consider the issues identified in the pre-review.

The FPRA elements, the quality attributes, th e capability categories of the process, and insights from FPRA experts were used to establish HLRs and SRs the ANS FPRA Standard. The HLRs and SRs, as listed in Chapter 4 of the FPRA Standard, are the criteria used for the FPRA

Peer Review. The FPRA Peer Review guidance pr ovided in this document does not provide any new technical requirements.

The FPRA Peer Review is developed as a rati onal approach to assessing FPRA technical adequacy and allowing the necessary focused f eedback for FPRA improvement. The process does not require a 10CFR50 Appendix B program for the review or for the FPRA. However, the review process includes the principal elemen ts of an effective 10CFR50 Appendix B quality assurance review of documents via: use of qualified reviewers; use of reviewers who are independent of the original FPRA study; development of a list of issues to be addressed; and documentation of the review conclusions.

More specific details of the FPRA Peer Re view process are provided in Section 2.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-8 Figure 1-3 FPRA Peer Review Process Flow Chart

Step 1: Collect Plant and FPRA Information Step 2: Identify and Assemble FPRA Peer Review Team Step 3: Pre-Visit Review of Selected Material and Self-

Assessment Step 5: Identification of Specific Information Required During

the On-site Visit Step 7a: On-site Review including a) Obtain Overview of FPRA, b) Examine each FPRA element, c) Verify Spatial

Dependencies by Walkdown, d) Examine Results of FPRA

Sensitivity Studies, e) Examine FPRA Maintenance and Update

process Step 4: Pre-visit Telecoms

as needed Step 13: Host Utility Review of Draft Report Step 8: Develop Preliminary Findings Step 6: Pre-visit by Team

Leader as needed Step 9: Closeout Meeting Step 12: Develop Draft Report Step 10: Follow-up Team

Telecoms Step 11: Follow-up Host

Utility Telecoms Step 14: Provide Final Report Offsite Offsite On-site NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 1-9 1.5 FPRA Peer Review Capability Categories The FPRA Peer Review uses Capability Categories to assess the relative technical merits and capabilities of each technical element reviewed , including ANS Fire PRA Standard HLRs and each of the SRs. The Capability Categories were developed considering attributes of a FPRA

necessary to ensure technical adequacy, elements of a FPRA that are critical to its technical adequacy, and elements needed to support PR A applications. Three Capability Category levels are used to indicate the relative technica l adequacy of each SR based on the criteria at hand. In some cases, the grading may result in a "not met" assignment when none of the requirements for an SR capability requirement ar e met. The grading is further described in Section 3.

It is important to note that neither the HLRs, PRA Technical Elements, nor the entire FPRA are assigned an overall Capability Category.

Each SR is assessed. Then, based on the SR Capability Categories, a summary of the technical adequacy to support a risk-informed

application is provided for each of the HLRs and the 12 technical elements.

The major benefits of this review process, ther efore, are not the assignment of SR Capability Categories, but rather the recommendations for improvements and the acknowledgment of the strengths of the FPRA. Additional beneficial outcomes of the review process are the

exchange of information regarding FPRA techni ques, experiences, and applications among the Host Utility and utility reviewer personnel, and an anticipated evolving level of consistency from review to review.

The review process requires that the existing FPRA meet the SR criteria, or be assigned a "not met" for the SR. Furthermore, documentatio n methods and FPRA Maintenance and Update processes must be in place to ensure the long-term quality of the FPRA.

As insights are gleaned from the peer review proc ess efforts, they will be fed back into the FPRA Peer Review guidance (this document) for revision.

1.6 Document

Organization The remainder of this document is organized as follows. Section 2 discusses the key elements of the peer review, and the functions and requirements of the Peer Review Team. Section 3

provides guidance on the peer review capability categories. Section 4 discusses the peer review reporting process and process forms. Appendix A provides guidance on preparing for the peer review, and review logistics. Appendix B contains the review summary sheets for the technical

elements. Appendix C contains the review tables for the maintenance and update of the FPRA.

Appendix D provides some guidance for the Peer Review Team, along with review documentation forms. (Review this roadmap once Appendices are complete).

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-1

2. PEER REVIEW PROCESS This section focuses on the key elements of th e FPRA Peer Review and describes the role and function of the Peer Review Team and the requirements governing the team.

2.1 FPRA Peer Review Process Description The FPRA Peer Review is a requirement of the ANS Fire PRA Standard to identify the technical adequacy of the FPRA to support risk-informed a pplications, and is complementary to the Internal Events PRA Peer Review used by the industry in NEI 00-02 and with the Follow-on Peer Review in NEI 05-04.

A flowchart of the FPRA Peer Review process was sh own in Figure 1-3. That figure describes the general approach and process steps used in the a pplication of the peer review to an individual FPRA. The FPRA Peer Review is a tiered review that begins with SR Capability Category summary sheets and summarizes this into the HLR Summary Tables.

The applicability of specific HLRs/SRs may vary from plant to plant. This variance results from the differences in the FPRA techniques and mo dels being evaluated, including the computer modeling methodology used at the plant, the use of qualitative or quantitative screening, the use of detailed fire modeling, etc. The Peer Review Team through their consensus

discussions determines the applicability of sp ecific HLRs/SRs to the plant FPRA being reviewed. For example, if the FPRA does not include quantitative screening (an optional

step), then the Peer Review Team would determine that the quantitative screening HLRs/SRs do not need to be reviewed.

To start the FPRA Peer Review, the Host Utilit y should request and schedule a peer review through the appropriate Owners Group representa tive. As the FPRA Peer Reviews begins, the Host Utility should complete the prerequisites discussed in Appendix A and Section 1 above.

Selection of the Peer Review Team Leader would occur prior to gathering the initial

information. This selection is based on disc ussion between the Owners Group representative (coordinator) and the Host Utility. The process below is developed assuming the Team

Leader responsibilities are assigned to a single individual. However, the responsibilities could be split between two individuals, based on logi stic and technical assignments. One person can be designated the Technical Lead and would have the overall technical responsible for the

Peer Review, as well as the preparation of th e Final Report. The second person can be designated the Facilitator and would be responsi ble for ensuring the schedule is maintained, moderate discussions, act as an interface to the Host Utility, etc.

Selection of a Peer Review Team can also occur prior to collecting all of the initial plant FPRA information, including the determination whether pa rticular expertise (e.g., fire modeling or circuit analysis) is needed for the Peer Review. As di scussed in Section 2.2 below, the Peer Review Team skills can vary for each review, depending on whether the FPRA includes particular fire modeling analysis or detailed electrical circuit anal ysis. The utility can request particular expertise for the Peer Review Team, when specific skills ar e needed. The Team Leader should verify the team skills needed once the FPRA plant information is reviewed.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-2 The major steps in the FPRA Peer Review process are described below, with particular emphasis on information pertinent to the Peer Review Team.

Step 1: Collect plant and FPRA information for pre-visit review

Before the on-site review meeting, the Host Ut ility FPRA project manager should distribute the pre-review material to the Peer Review Team Leader (and Team, when assigned). Guidance on

the types of information required is provided in Section 2.3 and Appendix A.5. This material includes the results from the self-assessment of th e FPRA by the Host Utility, and the results of the Internal Events PRA peer review and review of the F&Os against the FPRA.

Step 2: Identify and assemble the Peer Review Team

Based on the plant information collected in Step 1, and the guidance in Section 2.2 below, the Peer Review Team should be identified. Informat ion collected in Step 1 will be distributed to the Peer Review Team, and the schedule for the peer review, including completion of pre-site visit reviews, can be completed.

During the selection of the FPRA Peer Review Team, the Team Leader (or utility) should determine if specific review capabilities are need ed. These capabilities are discussed in Section 2.2 below. For example, if the FPRA depended heavily on three-dimensional fire modeling, then expertise in this area may be needed. Similarly, if detailed circuit analysis is important to the

FPRA results, then expertise is needed for review of this analysis. The determination of need for specific FPRA Peer Review Team member skills sh ould be performed sufficiently early to allow the scheduling on these team members on the review team.

Step 3: Pre-visit review of selected material and self-assessment

The information collected in Step 1 is provided to the Peer Review Team. The review of this information prepares the Peer Review Team to in vestigate the details of the FPRA. This can be accomplished by thoroughly reviewing the FPRA do cumentation sent out for study prior to the on-site visit. Individual team members, however, should focus on those areas to which they have been assigned for review. (This assignment will have been made in the scheduling letter sent as the first item in the timetable of Figure 2-1; an example letter is shown in Exhibit A-1.) As needed, information can be sent to a reviewer prio r to the on-site visit to supplement the initially prepared information for the Peer Review Team.

The pre-visit review also includes review of the plant's self-assessment and the review of the Internal Events PRA peer review, and open and closed/dispositioned F&Os.

Step 4: Pre-visit telecoms, as necessary

It is expected that there will be several conferen ce calls prior to the on-site visit performed.

These calls should help determine both the makeup of the team, the schedule, and any additional review information needed by the team for the pre-visit review.

As noted in Section 3.3, Inquiries on the interpre tation of specific SRs may have been forwarded to the ASME CNRM. The set of Inquiries that ha ve been resolved by CNRM should be obtained NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-3 from the ASME CNRM Secretary and reviewed prior to conducting a Peer Review and discussed in a pre-visit telecom, as necessary.

Step 5: Identification of specific information required during on-site visit

Based on the pre-visit review and review team discussion, the team should identify prior to

the on-site visit, a list of specific information that will be needed during the one-week on-site review. This may include references, such as ca lculations or drawings that were the basis for each of the steps in the FPRA, or may include fire protection or other plant information not provided for the pre-review.

Step 6: Pre-visit visit (by Team Leader), as necessary

It may be useful for the Team Leader to perform an on-site visit several weeks prior to the

Peer Review Team on-site visit. This visit can help finalize the logistics for the on-site visit, and help in the process of transmitting pre-vi sit review information needed for the on-site review.

Step 7: On-site review

The on-site review includes a number of steps, discussed below:

Step 7a: Interact with the Host Utility FP RA group to obtain overview of the FPRA

The Host Utility FPRA team is expected to prepar e detailed presentations on the key elements of the FPRA, as discussed in Appendix A.8. For the review process to be completely effective, the Host Utility should be well prepared for presenti ng information to the Peer Review Team. The scope of the detailed presentations should be limited and may not require the entire team.

Additionally, the Team Leader through discussions with the Host Utility should establish the scope and schedule for the presentations.

During this step, and also the subsequent steps, it is imperative that the members of the Peer Review Team and the Host Utility FPRA team communicate openly and candidly. A successful

review requires efficient and candid communica tion among review team members, and between the review team and site PRA team members.

Step 7b: Examine each FPRA element us ing questions and review summary sheets

The peer review begins with higher-level inve stigations and progresses to examining detailed technical issues. This involves essentially a combination of a breadth (wide) and depth (deep) examination of the FPRA elements. The revi ew summary sheets (see Appendix B) provide a structure, which in combination with their indi vidual FPRA experience provides the basis for examining the various FPRA elements. The checklis t also includes a review of the open internal events F&Os. Peer review of each applicable HLR and SR from the ANS FPRA Standard listed on the review forms in Appendix B help to ensure completeness in the review. If a reviewer

discovers a question or discrepancy, it is expect ed that a more through, detailed search will be conducted.

Thus, in reaching their conclusions regarding the technical adequacy of the various elements and the FPRA as a whole, reviewers are expected to in vestigate the FPRA at several different levels.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-4 The reviewers, working in small teams, will present their views to the entire Peer Review Team, at which time a (team) consensus process will be used to determine the final Capability Category for

each FPRA SR. In general, it is essential to fo cus the review on the specific conclusions of the FPRA to ensure that the review directly addre sses previously defined plant applications of the FPRA. For example, a plant transitioning to NFPA-805, where local manual actions are analyzed

in detail, the focus of the review would include th e fire scenarios involving local manual actions.

Optional FPRA tasks such as Qualitative or Quantitative Screening that are not performed in the FPRA should be noted on the review. Capability Categories for these tasks are considered not

applicable.

Information regarding the Capability Categories is provided in Section 3.

Step 7c: Verify spatial dependencies by walkdown

An important element of the FPRA review is th e walkdown of the areas of the plant that are important to the FPRA results. This walkdown ca n be performed by a subset of the Peer Review Team after the specific issues have been identified during the first several days of the review, but may need to be followed up with more specific fire compartment walkdowns, as needed.

The walkdown for the FPRA may need to be performed in two parts. First, the walkdown for the

base FPRA plant partitioning should be performe d during the review of this element. Plant-specific features credited in the FPRA can be incl uded in the walkdown at this time, such as the location of suppression, combustible controls, and other plant features. Second, a walkdown of specific fire scenarios may be necessary to co nfirm assumptions using in the supporting fire modeling, damage time, and other calculations.

The Host Utility should make arrangements for the pl ant walkdown in advance of the on-site visit.

These arrangements would include participants for each walkdown, and the scheduled dates.

Information needed to arrange for site access shou ld be requested from the Team Leader prior to the on-site visit. It may be necessary to perfor m a third walkdown towards the end of the on-site visit to confirm any information not initially verified in the initial two walkdowns.

Since most or all of the Peer Review Team may be involved in one or more of the walkdowns, the Team Leader should account for the time needed for walkdowns and preparations for walkdowns in the schedule. The difficultly of getting into critical areas should be accounted for in the schedule, and minimized by preplanning.

Step 7d: Examine results of a FPRA sensitivity run(s) performed during the review (see Section A.7)

It is likely that during the review certain issues or questions may arise relative to the FPRA results.

It may be useful for the Host Utility to perform, du ring the on-site review, one or more sensitivity cases with the FPRA computerized model to invest igate these sensitivities and to demonstrate the Host Utility FPRA team's approach for solving and applying the FPRA.

Step 7e: Examine the FPRA Maintenance and Update process

The process for maintaining the FPRA in a state of fidelity with the plant, plant procedures, and utility staff training is a necessary element for ensu ring that the FPRA can be effectively used for NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-5 applications. Appendix C provides a review worksh eet that can be used in the evaluation of the FPRA Maintenance and Update process. The re quirements for model maintenance are discussed in Section 5 of the ANS FPRA Standard, which adopts Section 5 of the ASME PRA Standard, with

modifications.

Step 8: Develop preliminary findings and results

This step involves the development of the prelim inary findings and peer review results, and the compilation of a draft report. This preliminary report forms the basis for the closeout meeting with the FPRA group and with Host Utility management.

Consensus sessions of the Peer Review Team are required for every technical element to ensure that the summary sheets are completed. The tw o/three reviewers assigned for a particular technical element may hold mini-consensus sessions in preparation for the full Peer Review Team

consensus session. The assignment of a Capability Category for each SR is developed based on a consensus of the entire Peer Review Team. Similarly, the assignment of A/B F&Os is also based

on Peer Review Team consensus. However, a dissenting opinion can be issued, based on one or

more Peer Review Team members review. Step 8 will occur concurrently with Step 7.

Step 9: Closeout Meeting

This is the presentation of the results of the pr eliminary findings and Review Team Report to the Host Utility FPRA group and management, held on th e last day of the on-site review. In addition, feedback should be provided to the Host Utility FP RA group at some point of each day of the on-site review. Electronic copies of all F&Os, completed forms, and draft write-ups should be

provided to the Host Utility prior to (or at) the clos eout meeting, in order to expedite correction of any errors, comment feedback, etc.

Step 10: Follow-up team telecoms

Post-meeting telecoms may be useful in finalizin g the peer review report, and closing out any open issues from the on-site review. These te lecoms may be performed in conjunction with telecoms with the Host Utility (see Step 11), as additional information is needed and open questions are answered. These telecoms can also be used for any new consensus required by

the addition or re-interpretation of the FPRA information.

Step 11: Follow-up Host Utility telecoms, as necessary Any open questions from the on-site visit can be addressed either by e-mail or by

follow-up phone calls between the Host Utility and selected review team

members. New information provided to th e team that was not available during the on-site visit can be provided with the telecoms used to answer any questions resulting from review of this new information.

Step 12: Development of draft report

A draft review should be completed shortly afte r the on-site visit is complete. Section 4.0 below provides the details and contents of this report. Several drafts may be developed, based on the timing of completion for the various documentation tasks for the report.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-6 Step 13: Review of draft report by Host Utility

The Host Utility should review the draft report (s), and provide comments to the Peer Review Team prior to final report documentation. The comment process should be performed in a timely manner as to ensure completion of the Final Report in a reasonable timeframe.

Step 14: Provide the Final Report of the FPRA Peer Review:

The designated Peer Review Team member usin g the information prepared during the on-site review compiles the Final Report and any additional summary comments provided by the review team, and signed off by each of the members of the FPRA Peer Review Team. The report will identify the Peer Review Team's Capability Ca tegory assignments for each SR, along with appropriate rationale, and may indicate where improvements are required in order for elements to be accepted at the next higher levels. Report documentation is discussed in additional detail in Section 4.0 below.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-7 Figure 2-1 FPRA PEER REVIEW PROCESS SUGGESTED TIMELINE

Review Week Task Week 0: Team Lead and Reviewers Identified Week 4: Team Lead defines Reviewer Responsibilities and Transmits Information Request to Host Utility Week 7: Host Utility Transmits Pre-Review Material to Reviewers Week 8: Review Team Conference Call Week 9: Logistics Conference Call with Review Team and Utility Week 10: Onsite Review Week 11: Team Lead assembles Draft Report and transmits for Review Team

review Week 14: Team Lead assembles Final Draft Report and transmits for Utility

Review Week 20: Team Lead issues Final Report to Utility

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-8 2.2 FPRA Peer Review Team The single most important aspect of the FPRA P eer Review process is the selection of the Peer Review Team that carries out the review process. The Peer Review Team is composed of utility, vendor, and contractor personnel knowledgeable in FPRA issues and experienced in the performance and application of FPRAs. The Peer Review Team will include peers, knowledgeable

in FPRAs for plants similar to the plant being reviewed. The Team Leader and the Host Utility determine the specific composition of the Peer Re view Team. However, due to the variability of FPRA and the analysis tools used to support the FPRA, team member capability will vary, based on the plant-specific FPRA.

The desired attributes of the Peer Review Team, as a whole, are as follows: independent of the FPRA being reviewed, expert in all phases of FPRA, and experienced in performance of FPRAs.

The Peer Review Team can include utility representatives from other Owners Groups. One of the

useful by-products of the FPRA Peer Review is the technology transfer to the utility personnel involved as the reviewers.

Experience has indicated that an optimum team si ze is five or six members. The actual number of members on any specific team will be a function of the skill sets required, as per the analytical methods used in the FPRA, but should include a minimum of four members. The following is a brief description of the attributes of the Peer Review Team:

Independence: Members of the team will not be members of the utility responsible for the FPRA. The availability of qualified technical reviewers who are familiar with the FPRA Peer Review process is a consideration in the selection of the contractor reviewers. The

ethics and integrity of the contractors is considered to be a necessary element in

the selection process. An individual contractor cannot review work that he or she has performed for the utility, although they may review other aspects of the FPRA if necessary. A statement of the "independence" of the team members will be added to the individual report.

Expert in all phases of FPRA

A broad experience base for the team is required to effectively implement the FPRA Peer Review process. Howeve r, it is somewhat difficult to translate this into requirements for individual members of th e team. Nevertheless, the following guidance is provided that must be satisfied for members of the team, such that the overall team expertise must be sufficient to cover all of the FPRA elements

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-9 Experience Requirements for Peer Review Team Members from Contractor Organizations Bachelors Degree in Engineering/Science/Mathematics 5; AND At least 10 years experience in the nuclear field; AND Special focus experience of at least five years in one of the key areas of the process: HRA with specific experience in HRA for FPRA; OR FPRA (modeling or quantification); OR Fire Protection or Fire Safe Shutdown; OR Fire modeling (see below); OR Circuit analysis (see below)

Experience Requirements for Peer Review Team Members from Utilities Bachelors Degree in Engineering/Science/Mathematics 6; AND At least five years experience in the nuclear field; AND Special focus experience of at least thr ee years in one of the key areas of the process: HRA with specific experience in HRA for FPRA; OR FPRA (modeling or quantification); OR Fire Protection or Fire Safe Shutdown; OR Fire modeling (see Below); OR Circuit analysis (see below)

Experience in performance of FPRAs:

Each member of the team should have participated in the performance of or managed at least one FPRA

7. Members of utilities:

The Peer Review Team must have ad equate outside utility participation.

The team may be augmented by contractors to provide specific areas of expertise, and to provide continuity and consistency across reviews. Based on the highly specialized nature of

FPRA, it is recommended to include no more than two utility members in the Peer Review

Team, unless a majority of the utility members also meet the requirements for contractor members of team.

Specialized expertise in fire modeling or detailed circuit analysis may be required, if the FPRA results are highly dependent on complex and specif ic analysis in these areas. Fire modeling or circuit analysis using generic methods or commo nly used fire modeling tools would not require specialized expertise (note: the team makeup still needs to include experience in generic circuit analysis and the commonly used fire modeling tools). However, use of a specific fire modeling 5 Significant experience may be substituted for an engineering degree, consistent with guidelines used by licensing bodies (varies by state).

For example, a reviewer with engineering degree coursework and at least 20 years experience in th e nuclear field would be considered to have met the requirements for degree/experience.

6 Significant experience may be substituted for an engineering degree, consistent with guidelines used by licensing bodies (varies by state).

For example, a reviewer with engineering degree coursework and at least 10 years experience in th e nuclear field would be considered to have met the requirements for degree/experience.

7 Specialists in Circuits Analysis Fire Modeling or Fire HRA may not have participated in a full FPRA.

Training on FPRA methods may be used in lie u of FPRA experience for these specialists.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 2-10 tool (e.g., computational fluid dynamics (CFD) model) would require including a team member with experience in this area. When a FPRA includes significant detailed circuit analysis, a team member experienced in this area would be required. Use of generic circuit failure probabilities with supporting NUREG/CR-6850 or similar circuit analysis would not require specific experience in detailed circuit analysis.

The process requires the reviewers to follow a very tight schedule and cannot be completed successfully if the team consists mainly of peer reviewers inexperienced in the FPRA Peer Review process (or very similar processes). A training sessi on should be held at the outset of each review to ensure that all of the reviewers share a common understanding of the process, review summary sheets, and Capability Category criteria.

This training session should be held by phone during the meeting preparation in order to optimize on-site review time.

Peer Review observers who are participating as a part of a learning process are not considered a part of the Peer Review Team. Observer skills cannot be considered in determining the skills of the Peer Review Team.

2.3 Host Utility Preparation and Participation Request The Host Utility should initiate the review process.

A request for a FPRA Peer Review should be made to the appropriate Owners Group contact. The Owners Group will send a letter to the Host

Utility management outlining the process, the goals, and the expectations for the Host Utility. An example letter is provided as Exhibit A-1 in Appendix A.

The resource needs by the Host Utility are summarized in Table A-1.

Additional guidance for the Host Utility regardin g information requirements and interactions as they relate to the Peer Review is provided in Appendix A.

2.4 Review

Week Agenda The example agenda for the initial review meeting hosted by the utility is provided in Attachment 3 to Exhibit A-1 in Appendix A.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-1

3. FPRA PEER REVIEW PROCESS ELEMENTS AND GUIDANCE

3.1 Overview

A FPRA for a nuclear power plant is an extensive and detailed engineering and statistical analysis of complex systems and uncertain physical processe

s. The intent of the review process is to ascertain the level of technical adequacy of the FPRA to support risk-informed applications by verifying its use of assumptions, degree of conservatism, realism of analysis, completeness, reasonableness of results, and documentation. Th is section provides guidance on peer review criteria and the establishment of levels, or Capability Categories, to be used during the peer

review.

3.2 Peer Review Process Criteria The review team will focus on the Host Utilit y's self-assessment of the applicable elements against the ANS Fire PRA Standard and the degree to which the FPRA meets the applicable SRs in the ANS Fire PRA Standard.

The Peer Review Team is divided into sub-teams to review the various aspects of the FPRA. The

composition of the sub-teams will vary from day-to-day to meet the review needs for each day.

As the peer review process is very intense and focused because of the amount of material to cover in a limited period of time, schedules and element assignments should be considered flexible, though the Team Leader needs to ensure that all the material is adequately reviewed.

Prior to the start of the review, the Peer Review Team members will perform a "refresher" review

of the applicable portions of the ANS Fire PRA Standard, with emphasis on section 6.0, and establish a common perspective regarding the gene ral assignment philosophy consistent with the ANS Fire PRA Standard. The applicable HLRs in Se ction 4.5 will also be briefly reviewed to ensure the team is familiar with the high level scope of the review.

At the beginning of review for each technical element, the reviewer(s) should review the HLRs for the element and preview the individual SRs. In Appendix D of RG 1.200, the NRC has provided a Regulatory Position relative to some specific SRs in the ANS Fire PRA Standard. (Note to team, the reference to 1.200 is a future addition to this guidance.)

The peer reviewer(s) should consider these NRC clarifications and qualifications, where applicable, during the review, and note the extent to which the FPRA element(s) being reviewed address these positions. However, a reviewer's assessment that the FPRA meets or does not meet a particular SR should be derived from what is in the Fire PRA Standard (and not based on the NRC's clarification and qualifications). If so desired by the Host Utility, the reviewer(s) may also provide an assessment relative to the

NRC's clarifications and qualifications.

The starting point for the review of each SR is typically the Host Utility's self-assessment. This will provide the utility's assessment of the Capability Category which they have assigned to the FPRA SRs and the basis for this assessment. More importantly, the self-assessment

should provide pointers to the associated PRA documentation. The reviewers look at the NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-2 basis and review the associated documentation to a sufficient level of detail to make their own assessment. However, the reviewers are not limited to the referenced documents; they may request review of any pertinent documentation they believe is needed to make their assessment. Assessment of the SRs can be recorded in tables such as provided in Appendix B of this document.

As the SRs are purposefully open to some interpretation, there may need to be some discussion to determine the appropriate assignment of a Capability Category, or even determine if a SR is considered to be "met." The reviewers must consider the "whole" of the PRA and not be overly focused on a specific discre pancy. To declare that an an SR is not "met," a preponderance of evidence must be observed. Determination of the status of an SR should be guided by the following approach from RG 1.200 [5]:

... [If] there are a few examples in which a specific requirement has not been met, it is not necessarily indicative that this requirement has not been met. If, the requirement has been met for the majority of the systems or parameter estimates, and the few examples can be put down to mistakes or oversights, the requirement would be considered to be met. If, however, there is a systematic failure to address the requirement (e.g., component boundaries have not been defined anywhere), then the requirement has not been complied with.

During the review of an SR, if the reviewers identify any issues/problems that impact the capability of the PRA, they will document these problems using an F&O form equivalent to that presented in Appendix E of this report. The F&Os specify the PRA element and SR of concern, and describe the PRA level of compliance with the criteria. The issue documented may be a weakness (finding), a strength (best practice), or a simple observation (suggestion). The F&O includes an assessment of the importance of the observation on the level of

capability of the SR, and, for weaknesses, a proposed resolution for the weakness. The importance of each observation is classified as a:

Finding - an observation (an issue or discrepancy) that is necessary to address to ensure: the technical adequacy of the PRA (relative to a Capability Category), the capability/robustness of the PRA update process, or the process for evaluating the necessary capability of the PRA technical elements (to support applications)

Suggestion - an observation considered desirable to maintain maximum flexibility for PRA applications and consistency with industry practices. Failing to resolve a suggestion should have no significant impact on the PRA results or the integrity of the PRA. Some examples of a suggestion include: editorial and minor technical items recommendations for consistency with indu stry practices (e.g., replacing a given consensus model with a more widely used model)

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-3 recommendations to enhance the PRA's technical capability as time and resource permit This approach of classifying F&Os replaces th e A/B/C/D approached used in the original NEI 00-02 Peer Reviews, and the modification (with combined A/B) recommended in the original version of NEI 05-04. The finding/suggestion approach should be simpler and less time consuming (for the reviewers) to implement, as making the distinction between a "finding" and a "suggestion" should be more evident (with less controversy). This approach will also prevent any "findings" from being relegated to a "C" category, which may have occurred with some previous Peer Review F&Os. The disposition of F&Os will be the same as previous Peer Reviews, with the Host Utility responsible for reconciling the "findings" e.g., placing them in their corrective action program (or the equivalent). In general, a "finding" would

correspond to an "A/B" F&O, while a "suggestion" would correspond to C and D F&O, for utilities that may have established a procedure to deal with PRA F&Os.

Originally, the "S" classification was used indi cate a PRA strength. This classification should be reserved for items that would represent "best industry practice," to the extent that utilities (with findings) would want to emulate.

Accordingly, and to avoid confusion with "suggestion," this classification will be designated "best practice," and identified with a "BP."

Each technical element has an HLR and a number of associated SRs with respect to

documentation. In general, the documentation HL Rs require that the documentation be sufficient to facilitate peer reviews by describing the pr ocesses used, providing the assumptions used and their bases, and providing the associated SRs specific details for each technical element.

Assessing the Capability Category for the documentation SRs does not require a separate review

for each SR. At the start of the review for a given technical element, the Peer Review Team

should review the documentation HLR and SR s for that element to identify any unique documentation aspects for that technical element.

At the completion of the review of the technical element, the reviewers for that el ement may assess the PRA compliance with the documentation SRs based on availability, scope an d completeness of the documentation that they used to review the technical SRs for the technical element.

At the end of the review for each technical element, the team members will conduct

consensus discussions to assign Capability Categori es to the SRs. The Lead Reviewer will lead the consensus session for a particular technical element.

As stated in Section 6.1 of the ASME PRA Standa rd, "The peer review need not assess all aspects of the PRA against all Section 4 requirements; however, enough aspects of the PRA shall be

reviewed for the reviewers to achieve consensu s on the adequacy of methodologies and their implementation for each PRA element." The ANS Fire PRA Standard adopts the ASME PRA Standard requirement for section 6.1, thus requir ing the peer review to achieve consensus. The set of key review areas identified in Section 6.3 of the ANS Fire PRA Standard for the technical

element(s) being peer reviewed must be addressed.

During the review of a given technical element, the Lead Reviewer may elect to skip selected SRs

if the other reviewers determine that they can achieve consensus on the adequacy of the PRA with respect to the HLR without the identified (skippe d) SRs. Before electing to skip any SRs, the Lead Reviewer should consult the appropriate portion of Section 6.3 (of the Fire PRA Standard) to NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-4 ensure that the review will be consistent with th e appropriate requirements in Section 6.3. The review sub-team must document their basis for not reviewing the given SR. Optional FPRA tasks, such as qualitative and quantitative screenings are good examples of this, but additional areas where the SR does not impact the overall risk can be excluded with justification.

The reviewers should specifically address key a ssumptions and key sources of uncertainty in the elements being reviewed. Such assumptions an d uncertainties, their potential impact on the baseline PRA results and PRA applications, and the manner in which the Host Utility's quantification process addresses them, should be reviewed. The reviewers' opinions and suggestions regarding these key assumptions an d uncertainty sources should be documented.

Section 5 of the ASME PRA Standard provides th e requirements for a PRA configuration control program. The ANS Fire PRA Standard adopts Section 5 of the ASME standard, with some clarification. The FPRA Peer Review Team sh ould provide a summary assessment of how well the PRA maintenance program satisfies ASME PRA Standard Section 5 requirements relative to the

technical element(s) being reviewed for the FPRA. The requirements defined by the Maintenance and Update (MU) checklist in NEI 00-02 may be used as guidance for this summary assessment

for the specific technical element(s). The Maintenance and Update (MU) checklist from the NEI

00-02 process is provided in Appendix C.

EPRI's DocAssist tool (Reference 7), for example, ca n be used to review the results of the original NEI 00-02 peer review, status of F&Os, and result s of the Host Utility's self-assessment. EPRI's tool can also be used by the FPRA Peer Review Team, at the direction and discretion of the Host Utility, to record their findings, e.g., new F&Os as a result of the peer review. The tables in Appendix B can also be used to record peer review results. Regardless of the tool used, all

Capability Category assignments, comments, ob servations, and recommendations should be made available in an electronic form to the Te am Leader (to prepare the final report) and the Host Utility (for review). Methods for this need to be determined prior to the on-site visit and

must be acceptable to the Peer Review Team and the Host Utility.

During the FPRA Peer Review process, assignment of Capability Categories for the individual SRs is established by a consensus process that requires that all reviewers agree with the final

assignment. If a condition arises where there is not a complete consensus, then, at the request of any peer reviewer, differences or dissenting views among peer reviewers should be

documented with any recommended alternatives fo r resolution of these differences. Note that, from the perspective of the Host Utility, this is a highly undesirable situation. Therefore, the Peer Review Team should strive to achieve a consensus position on all review elements.

It is recommended that (except for a one-day visit) there is a daily debrief with the host utility.

There purpose of a debrief would be to (a) inform the host utility of any expected concerns with the PRA, (b) clearly delineate any "owed" informat ion from the host utility, (c) identify any new requested information, (d) as appropriate, seek cl arification or confirmation on prepared F&O, and (e) exchange any other relevant information. Th e timing and duration of such meetings should be mutually agreed to by the peer review team lead and the host utility.

In the course of performing the PRA peer review, insights will be developed related to the process (as described in this guidance document) or PRA practices (e.g., identification of a "best practice"). Such insights (i.e., lessons learned) should be documented and transmitted to NEI for subsequent updates. Appendix D provides an example Lessons Learned form that can (optionally) be used.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-5

3.3 Assignment

of Capability Categories The Capability Categories assigned during the Peer Review are based on the ANS Fire PRA Standard Capability Categories. Each SR is re viewed and assigned a Capability Category using the process described below. The assigned Capa bility Category indicates the relative capability level for each SR. A summary of the SR review is then provided for each HLR. It is important to note that each HLR and the entire FPRA are not assigned an overall Capability Category.

The major benefits of the review process, however, are not the SR assignments , but rather the recommendations for improvements and th e acknowledgments of the strengths of the PRA. Additional beneficial outcomes of the review process are the exchange of information

regarding PRA techniques, experiences, and ap plications among the Host Utility and utility reviewer personnel, and an anticipated evolving le vel of consistency from review to review.

3.3.1 Process

for Peer Reviews Against ANS Fire PRA Standard

Section 4 of the ANS Fire PRA Standard presen ts the risk assessment technical SRs. These requirements are specified in terms of Capabilit y Category requirements with increasing scope and level of detail, increasing plant-specificity, and increasing realism as SRs satisfy Capability Category I through Capability Category III. See Table 1.3-1 of the ASME PRA Standard (Reference 2).

For a peer review against the ANS Fire PRA Standa rd, the applicable portions of a Host Utility's FPRA will be reviewed against the applicable SRs in Sections 4 and 5 of the ANS Fire PRA Standard, following the guidance of Section 6 of the ANS Fire PRA Standard. For each SR

reviewed, the Host Utility's FPRA will be assessed against the Capability Category requirements.

For each Capability Category, the SRs define the minimum requirements necessary to meet that Capability Category. Some of the SR action statements apply to only one Capability Category, while others extend across two or three Capability Categories. When an action statement spans multiple categories, it applie s equally to each Capability Category. When necessary, the differentiation between Capability Ca tegories is made in other associated SRs. The interpretation of a SR whose action statemen t spans multiple categories is stated in Table

1. It is intended that, by meeting all the SR s under a given High Level Requirement (HLR), a PRA will comply with that HLR.

Table 1 -- Interpretation of Supporting Requirements Action Statement Spans Peer Review Finding Interpretation of the Supporting Requirement Meets SR Capable of supporting applications in all Capability Categories All Three Capability Categories (I/II/III) Does not meet SR Does not meet minimum standard Single Capability Category (I or II or III) Meets Individual SR Capable of supporting applications requiring that Capability Category or

lower NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-6 Does not meet any SR Does not meet minimum standard Meets SR for CC I/II Capable of supporting applications requiring Capability Category I or II Meets SR for CC III Capable of supporting applications in all Capability Categories

Lower Two Capability Categories (I/II) Does not meet SR Does not meet minimum standard Meets SR for CC II/III Capable of supporting applications in all Capability Categories Meets SR for CC I Capable of supporting applications requiring Capability Category I

Upper Two Capability Categories (II/III) Does not meet SR Does not meet minimum standard If there are instances where it appears that this approach leads the reviewer(s) to question the adequacy of the requirement for the higher capa bility categories, the reviewer(s) will document the interpretation of the SR that has been applie d, and the Host Utility or any member of the Peer Review Team may submit an Inquiry to the ASME Committee on Nuclear Risk Management (CNRM) requesting a clarification.

8 No Capability Category will be assigned to HLRs, but a qualitative assessment of the HLRs will be

made based on the associated SR assignments.

The applicable portions of the PRA and associ ated documentation will also be reviewed for conformance to the expert judgment requirements of Section 6.4 of the ANS Fire PRA Standard

as part of the overall review.

3.4 Additional

Guidance on the Technical Elements Review The following general information applies to the use and interpretation of the summary sheets in Appendix B. These are provided as additional in put in understanding the nature of the criteria.

The "independent review" identified for evaluati on as part of the checklist for each element under "Documentation" is a review sponsored by the Host Utility to make an assessment of the specified FPRA element. This "independent review" may have been performed as part of the IPEEE process. The Peer Review Team will re view the results of that independent review process. The review sheets are not prescriptive with resp ect to the assignment of specific probabilities or frequencies. A reviewer commenting on either the strength or the inadequacy of an

element in the FPRA should make an effort to provide a generally accepted reference to support the comment, where appropriate.

For each SR, assumptions and uncertainties associated with the SR are to be factored into the criteria of that element.

8 This assumptions the Fire PRA Standard is published as part of the ASME Level 1 PRA Combined/Integrated Standard.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-7 Section 6 of the ANS Fire PRA Standard includes some high level considerations to be assessed in the peer review for each HLR and SR.

Maintenance and updates: FPRA maintenance encompasses the identification and evaluation of new information, and the incorporation of th is information into the FPRA on an as-needed basis. FPRA maintenance typically refers to minor model modifications and effort. More extensive maintenance may be performed if a specific application requires refinement of

certain parts of the model. A FPRA update is a comprehensive revision to the FPRA models and associated documentation.

A certain level of subjectivity is expected when determining if an SR is in compliance with the Fire PRA Standard. For example, when there are many instances of compliance, and there are a few instances where compliance is lacking, th is does not necessarily mean that the SR is considered not met. Any non-compliance should be documented with an F&O. However, there should be a preponderance of evidence to conclude that an SR is not met.

3.5 Follow-on FPRA Peer Review The Follow-on Peer Review will cover the set of HLRs and SRs for the applicable FPRA technical elements in Section 4 of the ANS Fi re PRA Standard. Further, the scope may be limited within a FPRA technical element to only the SRs that are germane to a specific FPRA upgrade (e.g., re-evaluation of circuit failure probabilities). The Follow-on Peer Review may be limited to a single FPRA technical element, or may include multiple (or all) technical

elements.

FPRA updates are scheduled to be performed pe riodically. In addition, they may also be performed on an as-needed basis as determined by the FPRA group leader. FPRA maintenance should serve to keep the FPRA reasonably current between FPRA updates.

Additionally, it should be noted that the performance of an update do es not generally require the performance of a Follow-on Peer Review, as discussed in Section 5.4 of the ASME PRA Standard. Performance of a FPRA upgrade will, however, require performance of a Follow-on Peer Review. (Note: The

ASME PRA Standard defines PRA upgrade as "t he incorporation into a PRA model of a new methodology or significant changes in scope or capability. This could include items such as new human reliability analysis methodology, ne w data update methods, new approach to quantification or truncation, or new treatment of common cause failure.") In terms of FPRA, an upgrade may include the use of new methods for fire modeling, inclusion of additional fire-

induced accident sequences, etc.

The Host Utility shall initially determine the scope of the intended Follow-on Peer Review. This

should be sent early enough to the Peer Review Team Leader to permit feedback to resolve any issues prior to performing the review. (Scope may have been discussed during the

planning stages, but the actual reviewers should be very clear on the scope details.)

The performance of the Follow-on Peer Review would then be relatively similar to the initial peer review, with a modified scope, schedule, etc., based on the intended scope of the Follow-on Peer Review. Similarly, the Peer Review Team may be smaller, since some review skills may not

be needed for the Follow-on Peer Review. For example, if fire modeling is not part of the

Follow-on Peer Review, the required team skill for fire modeling is not needed.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 3-8 3.6 FPRA Level of Detail Section 1.6 and Table 1-1 of the ANS Fire PRA Standard discusses the variable and iterative nature of a FPRA. Since the FPRA includes analysis of fire risk for many areas in the plant, with each area possibly resulting in several possible init iating events, the level of detail for each area and each initiating event (scenario) is variable. A significant contributor to the FPRA results may need to be analyzed in great detail, while a lowe r risk scenario or area could be analyzed with less detail.

When reviewing individual SRs against this principle, it will be necessary to take into account this principle and the relative importance of the fire area, compartment, or scenario. For example, when applying fire-modeling tools, a range of tools is expected. For areas that are not significant contributors (see the Fire PRA Standard for discussion on this), bounding assumptions on fire damage could be used (Capability Category I). For significant contributors, detailed fire modeling for a group of ignition sources can be used (Capability Category II), or for each

ignition source (Capability Category III) would likely be used. If properly applied, the SR would

receive an assessed Capability Category of II or III (depending on which was applied to significant contributors) even with a majority of fire areas using bounding analysis. However, if a significant contributor was analyzed using bounding assumptions of fire damage, then Capability Category I would likely be assessed even if all other significant contributors were

analyzed with detailed fire modeling. Another possibility would be the assignment of fire

damage using "non-conservative" (not bounding) assumptions, which could result in either an F&O or a "not met" assessment for the capability category, depending on the potential impact.

Many of the SRs will have to be reviewed with a similar consideration. This Peer Review

guidance does not try to develop guidance for all of the SRs and possible levels of detail

supporting each. However, the general principle discussed in Section 1.6 of the ANS Fire PRA Standard should be considered in the Peer Review assessment for a Capability Category. In general, the assigned Capability Category will be based on the assessed level for the significant

contributors, while ensuring the non-signific ant contributors still meet a lower Capability Category.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 4-1

4. PEER REVIEW PROCESS RESULTS AND DOCUMENTATION 4.1 Peer Review Report The output of the peer review is a written repo rt documenting both the details and the summary findings of the review. The checklists, F&Os, an d other forms prepared during the on-site review constitute the largest portion of the report. The principal results, conclusions, and recommendations of the Peer Review Team are communicated to the Host Utility at the

completion of the on-site review, and included in the report. Also included are the resumes of the Peer Review Team members.

The peer review report will clearly state the following:

the Capability Category achieved for each FPRA SR and the basis of the assignment; the findings of the Peer Review Team; and any recommendations to achieve the next higher Capability Category (if applicable). For example, if a majority of the SRs for a FPRA are assessed as Capability Category II, then

where recommendations can be made for SRs assessed as Capability Category I, these should

be provided in the report. This may not be possible in all cases.

The peer review report should be made part of the Host Utility's FPRA documentation file for future internal and external reference.

4.2 Process

Summary Forms and Information There are a number of tables and forms that have been developed for use as part of the process

in order to help make effective use of the limited time available, and to document the results of the FPRA Peer Review. These forms are included and further described in Appendix B.

It is not the intent of this process to assign an overall Capability Category to the FPRA. The strength of the process is in the derivation an d assignment of Capability Category for each SR, which serves to focus future FPRA update activities or for use in strengthening specific

applications with additional deterministic assessments.

This FPRA Peer Review is focused principally on formal documented models, results, and their inputs. Notes or partial update results can be co nsidered as an indication of the intent of the process, however, the review must be tied to the formal documentation that is available to describe the model and its results, and any do cumented and interpreted sensitivities.

An overall evaluation of the FPRA by the Peer Re view Team is included in the report, using the form shown in Appendix B. This overall evaluation indicates the per-element basis for the

evaluation, to allow focusing resources on those items that can be modified to achieve the next highest capability category for each element. An additional perspective on the capability category assignments is provided in the summary provided using Table B-2 that shows a more in-depth breakdown of the Capability Categories assigned to the FPRA SRs.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 4-2

4.3 Process

Feedback It is anticipated that, as reviews are performed us ing this process, the participants will identify additional insights and suggestions for improvin g the quality and the efficiency of the Peer Review. Appendix D provides an example of a proc ess feedback form that can be used to report such improvements to the Owners Group peer review program coordinator. This will allow the

process to be maintained as a "living" proce ss, such that if incremental improvements are identified in subsequent peer reviews, the guidelines can be updated to reflect these

enhancements.

4.4 Follow-on Peer Review The Follow-on Peer Review, as discussed in Sect ion 3.5 above, will be documented in a similar manner to the original Peer Review, but with changes to account for the focused scope of this

review. The final report should include a discussi on on the reason for the Follow-on Peer Review, and the impact of the changes on the FPRA. Beca use of the limited scope of the review, not all Tables in Appendix B would need to be completed.

However, an overall evaluation of the FPRA would be based on a combination of the Follow-on Peer Review and the previous Peer Review (for sections not reviewed during the Follow-on Peer Review).

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 5-1

5. REFERENCES
1. "Probabilistic Risk Assessment (PRA) Peer Review Process Guidance," NEI 00-02, Revision A3, Nuclear Energy Institute, October 2000.
2. "Process for Performing Follow-on PRA Peer Reviews Using the ASME PRA Standard,"

Rev. 1, NEI-05-04, November 2007.

3. "Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, Addendum a," ASME RA-Sa-2003, American Society of Mechanical Engineers, December 2003.
4. "Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications, Addendum b," ASME RA-Sb-2003, American Society of Mechanical Engineers, December 2005.
5. Regulatory Guide 1.200, "An Approach For Determining the Technical Adequacy of Probabilistic Risk Assessment Results For Risk-Informed Activities," U.S. Nuclear

Regulatory Commission, Office of Nuclear Re gulatory Research, Revision 1, January, 2007. 6. ePSA PRA Documentation Module, Beta Version 2, The Electric Power Research Institute, May 2003.

7. "Process for Performing PRA Peer Review Follow-on Reviews and for Performing PRA Peer Reviews Using the ASME PRA Standard," WCAP-16091, Westinghouse Electric

Company, LLC, June 2003.

8. "Process for Performing Follow-on PRA Peer Reviews of Individual PRA Technical Elements Using the ASME PRA Standard," WCAP-16181-NP, Rev. 0 (Draft, Not

Issued), Westinghouse Electric Company, LLC, November 2003.

9. "Fire PRA Methodology, an American National Standard," ANSI/ANS-58-23-2007, American Nuclear Society, November 20, 2007.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-1 Appendix A

PREPARATION MATERIAL FOR THE PEER TEAM REVIEW

This Appendix provides the following information referenced in the Guidelines:

An estimate of the anticipated Host Utility re sources for the FPRA Peer Review process. An example letter to be sent to the Host Utility for initiating the FPRA Peer Review process. A list of the material to be sent by the Host Utility to the Peer Review Team. A list of the material to be available during the on-site visit. The agenda for the on-site visit.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-2 A.1 Estimated Host Utility Resources The FPRA Peer Review includes a detailed review of the FPRA. This detailed review is not only of the FPRA results, but also of the basi s for decisions made in the development of the FPRA. Of particular interest are assumptions regarding the development of fire initiating events, human error probabilities, plant model (i ncluding event trees, quantification, recovery and sequences/cutsets), success criteria, independ ent review, fire modeling, circuit selection and analysis, and uncertainty. Given the depth an d breadth of the review, it is important that all documentation of the FPRA development process be available and in a reviewer-friendly

format. As a result, the Peer Review Team will require access to any and all FPRA

documentation and supporting plant informatio n, and also access to members of the Host Utility FPRA group. This, in turn, requires a significant amount of preparation effort and support from the Host Utility.

An estimate of Host Utility required resources appears in Table A-1.

A.2 Example Letter

An example letter from the Owners Group to the Host Utility is included as Exhibit A-1. This letter explains what is required of the Host Utility in preparing for the review, including the following:

review material to be sent to the Peer Review Team, material to be available during the on-site review period, the proposed agenda for the week, information on the use of detailed circuit analysis and fire modeling in the FPRA (as needed), self-assessment report for the FPRA, and assessment of the Internal Events PRA open and closed F&Os for impact on the FPRA.

Additional explanation of what is required of the Host Utility is provided in the following sections.

A.3 Host Utility Preparation and Participation Guidance

A significant amount of Host Utility involvement is critical to ensure that the process can be accomplished successfully. The Host Utility should plan to spend a minimum of two person-weeks preparing documentation for the FPRA Peer Review Team, in addition to time required for the duplication or transmittal of requested information or for the preparation of the backup or support documents. Documentation should be provided el ectronically, if possible. Additional effort is required if documentation is not readily retrievabl

e. In the current process, this documentation preparation will likely occur as part of the se lf-assessment, but the general requirements and considerations are the same.

Host Utility Information Requirements

There are several types of information that the Ho st Utility is required to provide for a successful review: information to be available during the on-site review (Section A.4) information for reviewers prior to the on-site review (Section A.5)

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-3 interpretation of information and models during the review, and responses to reviewer questions (Section A.6) preparation of sensitivity studies to demonstr ate the robustness of the FPRA (Section A.7) presentations to explain details of the model th at would otherwise require extended study by the reviewers for full understanding (Section A.8)

A.4 Information Availability and Preparation Via the Self-Assessment

A list of information that should typically be av ailable or readily accessible during the on-site review is provided in Attachment 1 of Exhibit A-

1. However, having the required documentation available requires more than simply having the in formation available in a file drawer. The Host Utility should, as part of the self-assessment or pr eparatory activities, review any and all pertinent backup information and documentation in its files to ensure that the information is current and pertinent. The self-assessment should also prov ide a description of what information supports each of the ANS Fire PRA Standard SR. Extran eous information and documents, such as draft copies, editorial comments and outdated informatio n or information no longer pertinent, should not be presented to the Peer Review Team. Such information should be removed and placed in an archive file. In this way, the FPRA Peer Review Team can concentrate on the pertinent documentation. It is important to note that, although the FPRA Peer Review following this process is not a certification of the documentation, inadequate documentation is a factor in FPRA quality, and inadequate or inscrutable docume ntation affects the ability of the reviewers to determine FPRA quality and can affect the assigned Capability Categories.

In instances where limited backup information is available, the Host Utility should document, in outline form, what they believe was assumed in the analysis. Using this approach allows the reviewers to comment on the technical rationale and provides a forum for discussion of what

other utilities have done regarding the same or similar issues. In this way, the Host Utility receives the maximum benefit from the FPRA Peer Review.

In addition, as part of the preparatory review

/self-assessment process, the Host Utility may be requested to fill out the checklists of the FPRA Peer Review process elements and sub-elements.

When performing a self-assessment, the Host Utility should be asking the question "What information or basis is available to support the assignment for the sub-element Capability Category?" The Host Utility should prepare a list or a collection of documents that were used in the development of the element and, where appropri ate, the sub-element. This activity greatly enhances the likelihood that adequate documentat ion will be made available to the Peer Review Team and puts the Host Utility in a better position to appropriately respond to preliminary findings of the reviewers.

A.5 Information for Reviewers Prior to the Review A specific list of information to be sent by the Host Utility to the review team in preparation for the on-site review is provided in Attachment 1 of Exhibit A-1. This information is primarily a subset of the information required to be available during the on-site review. The listed information should be provided to each reviewer at least two weeks before the review, to allow sufficient preparation time. There are some items that should be provided to each reviewer, while other items may only need to be provided to those specific reviewers who will be responsible for their review. Examples of the more limited distribution documents might NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-4 include HRA example calculations, Ignition Frequency Analysis and methodology, fire modeling, and selected sensitivity cases. The distribution requirements should be discussed with the Owners Group review coordinator.

Specific pre-review of detailed circuit analysis and fire modeling may be required. An initial review by the Peer Review Team Lead would be perfor med to ensure that team members are selected that can adequately review the supporting FPRA in formation. For example, if a particular fire model is used in the FPRA and is key to the result s, then a reviewer with familiarity with the fire model would be needed for the Peer Review. Selected team members with expertise in

electric/circuit analysis and fire modeling woul d also need to review some of the detailed supporting analysis prior to coming on site in order to focus the site review on key areas of the

analysis.

It is assumed that a review of the open Inte rnal Events PRA Peer Review F&Os has been performed prior to the FPRA Peer Review. This review should document the potential impact of the F&Os on the FPRA. The disposition of these F&Os is to be provided to the review team, prior

to the review. Additionally, the results of the review of opened, closed and dispositioned F&Os from the Internal Events PRA Peer Review should be provided to the review team.

A.6 Information Transfer and Interpretation during the Review

The optimum benefits to the Host Utility are derive d from the presence of the "owner(s)" of the FPRA (i.e., the staff member(s) most aware of the details of the development and current

implementation of the FPRA) during the on-site vi sit. Otherwise, a set of other knowledgeable personnel needs to be present to provide support for the review team. These individuals and their areas of expertise need to be identified to the Peer Review Team members at the outset of the visit and available to respond promptly to questions during the review.

A.7 Preparation of Sensitivity Calculations

As part of the preparation process, it is requeste d that the results of several FPRA runs also be performed by the Host Utility and made available to the Peer Review Team prior to the on-site

visit. The selected sensitivity cases are meant to demonstrate that: The fire cutsets or fire sequences that appear to not address dependencies that have not been properly accounted for in the model and quantification process; The fire cutsets or fire sequences that appear as a result of the sensitivity can be explained relative to their low frequency in the baseline fire model. Sequences or cut sets are not omitted as a result of assumed fire damage or time to damage; and A method is provided to exercise the model and provide interpretation of results.

Note that the actual CDF numerical results of th e sensitivity cases are not the objective of these analyses, and are not necessarily meaningful for the peer review.

The sensitivity studies may be chosen from the fo llowing list and should include a printout of the top 200 cutsets or sequences plus importance reports for: sensitivity of results to fire size and damage zone, sensitivity of results to non-suppression probabilities, sensitivity of results to the assumed equipment damaged by the fire, NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-5 sensitivity of the results to the circuit fa ilure likelihood or circuit coordination, and sensitivity of the results to changes in oper ator failure rates, including control room abandonment and performance of local manual actions.

Additional or alternative sensitivities that may be more appropriate to the specific FPRA can be identified by the Host Utility.

A.8 Presentations

Several presentations by the Host Utility to the P eer Review Team are required during the on-site review. These informal presentations are considered crucial to success of the peer review and to

generate valuable feedback to the Host Utility, an d include: an initial presentation to the Peer Review Team to provide an overview of the im portant plant design features; and subsequent presentations on specific aspects of the FPRA.

Initial Presentation

The initial presentation is intended to provide the reviewers with an overview of the important plant features that influence the FPRA results, and also to help focus the Peer Review Team resources by highlighting specific areas of the FPRA for which the Host Utility desires review emphasis. This presentation may be made prior to the on-site visit via conference call. Similarly, it is valuable for the Peer Review Team to be made aware of any technical review elements and

criteria that may not be applicable to a given pl ant (and the reason why), at the outset of the review so that the reviewers have a basis for not considering these items.

The overview presentation by the Host Ut ility should include the following detailed information: a brief summary of the scope, methods, and key results (including dominant sequences and fire areas/zones) of the FPRA, a brief summary of any unique design features of the plant, a brief summary of the FPRA Maintenance and Update process, including examples of current uses of the FPRA, a brief overview of where the PRA group fits into the utility organization, and an indication of utility/plant management views on use and maintenance of the FPRA, a summary of the types of risk-informed applications for which the FPRA has been used or is planning to be used, the location of the FPRA documents, and of info rmation in the documents, covered briefly in a manner that allows the Peer Review Team to be able to find the necessary information quickly throughout the week, and a description of any elements of the FPRA that would benefit from other FPRA practitioners' insights.

Subsequent Presentations

The Host Utility is also expected to provide focuse d presentations on technical topics pertinent to the FPRA. These may vary from review to review, but will typically include one-hour discussions

of the fire modeling, cable routing and circuit analysis, quantification method, and Fire Safe Shutdown procedures.

A.9 Administrative Details

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-6 Prior to the inception of the review at the plant site, there is a need for extensive planning and scheduling off-site to ensure that the review ca n be performed efficiently and effectively. The most important administrative details include the meeting location and report reproduction support.

Choosing a good meeting location is necessary to efficiently perform the review. Distractions

must be minimized. Since long hours will likely be required, comfortable meeting rooms should be provided. At least two separate meeting rooms (one large enough for meetings with all of

the team members plus several members of the Host Utility staff), and individual work areas (if possible) should be available for use by the Peer Review Team during the entire week. It is

also useful to have quiet areas where team members can collect thoughts, and prepare or summarize findings. The Peer Review Team may request arrangements for box lunches to save

time, or if there is no convenient cafeteria servic

e. The Host Utility should supply to the reviewers a map and hotel list for the team to make logistical arrangements. Additionally, information on

the accessibility of computers, printers, Internet, etc., should be provided.

A.10 Host Utility Preparation Summary

In summary, the Host Utility desiring a peer review needs to accomplish the following tasks: perform a self assessment or other preparatory ac tivities sufficiently in advance of the peer review so that there is time to address missing or inaccurate information; provide information to the Peer Review lead on the importance and use of detailed fire modeling and circuit analysis in the FPRA in time to support the Peer Review Team selection; ensure that all necessary information for the re view is available on-site in reviewer-friendly format; provide initial information to be reviewed prior to the Peer Review Team visit, including sensitivity studies (at least 1 week in advance of the visit); and prepare for and host the Peer Review Team during the 1 week visit: provide facilities for the use of the review team while on-site, provide an overview presentation and presenta tions on selected topics, and responses to reviewer questions, provide a proof test run of the model and sensitivity runs as needed, provide access to the management chain to discuss the FPRA process, provide selected focused walkdown(s) of th e plant to augment the spatial interaction assessments, and provide necessary capability for the Team's computers.

Table A-1 Host Utility Involvement and Resource Estimates ItemResource Estimate Support an pre-review visit by a member of the Peer Review Team to identify the level of documentation that should be made available to the

reviewers, and to help in coordinating the on-site review logistics 0.2 person-week Supply initial information, which includes: FPRA summary document 1 person-week NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-7 Table A-1 Host Utility Involvement and Resource Estimates ItemResource Estimate Other material at the discretion of the Host Utility Sensitivity cases, if any have been requested by the Peer Review Team Lead prior to the review Internal Events PRA Peer Review F&Os (open and closed/dispositioned), and their effect on the Fire PRA (may need

to add time in the schedule for this) Conduct FPRA Self-Assessment/FPRA Preparatory Activities 3-4 person-weeks Host the Peer Review Team during the one-week visit (Including focused plant walkdowns) 1-2 person-weeks Prepare initial presentation information Initial expectations regarding peer review assessment of Capability Categories, and basis for the expectations Summary of plant and principal design features Summary of the FPRA Maintenance and Update process Application examples PRA Group Management Role in Use of FPRA 0.5 person-week Assemble all supporting documentation for the on-site visit1 person-week Provide responses to questions during the on-site visit 1 person-week Provide presentations on selected topics 0.4 person-week Provide a proof test run of the model during on-site visit0.1 person-week Provide access to the management chain to discuss the FPRA process0.1 person-week Resolution of F&Os/comments This effort can vary significantly; no estimate

is given here. Closeout Meeting ~ 0.3 person-week Total Host Utility Resource Requirement for Peer Review~ 11 to 15 person-weeks (6)

( 9) This estimate is associated with a FPRA with good documentation and technical bases. With excellent documentation and Technical Bases, this estimate could be reduced, and with reduced levels of documentation, the estimate could be higher.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-8 Exhibit A-1 Example Peer Review Planning Letter From Owners Group to Host Utility

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-9 Peer Review Planning Letter

Manager PRA

Host Utility

SUBJECT:

FPRA Peer Review

Dear Manager:

Thank you for your participation in the Fire Pr obabilistic Risk Assessment (FPRA) Peer Review program. In addition to the direct benefits of this peer review to your organization's applications of the FPRA, this program will provide benefits to the ______ (Fill in) Owners Group and its individual member utilities. The FPRA Peer Review should provide valuable insights for your use in gauging the overall technical adequacy of your FPRA for future use in risk-informed applications and in planning for FPRA update and maintenance activities.

This letter outlines the following: expectations for the review process, proposed agenda for the peer review, information about the reviewers, key dates, and commitment to support peer reviews of other sites.

A significant amount of FPRA information is be ing requested for the review team. Attachment 1 provides a list of information that is needed before the on-site review and information that would be desirable to have during the visit.

The members of the FPRA Peer Review Team for Plant X are: Reviewer Affiliation

1. ______________________ ______________________
2. ______________________ ______________________
3. ______________________ ______________________
4. ______________________ ______________________
5. ______________________ ______________________
6. ______________________ ______________________

{For this review, we would also like to include participation by several observers who will not be official reviewers or have official peer revi ew responsibilities, but who either represents one of other Owners Groups or an organization with which we are cooperating in conducting this program.}

The addresses and other information for these people are enclosed as Attachment 2.

provides the proposed agenda for the Peer Review meeting the week of

________. If you need to make any modifications to this agenda, please notify me as soon as possible. Please arrange to have at least two separate meeting rooms (one large enough

for meetings with all of the Peer Review Team members plus several members of your staff),

and individual work areas (if possible) available for use by the team members during the

entire week. Also, the Peer Review Team will need computer and printer access, as well as

assistance for lunch. Finally, please note th at the Peer Review Team will require extended hours on-site during the review.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-10 The pre-visit information for the review should be sent so that the reviewers receive it two weeks prior to the on-site review, i.e., by

______________. This is important so that the Peer Review Team has adequate preparation time. Also note that the Peer Review team would like to discuss with you the anticipated ty pes of planned risk-informed applications and any expectations for the FPRA.

The Peer Review Team includes members from other utilities, as coordinated through the X Owner's Group process. In order to ensure su ccess of this program, the Host Utility should identify review team members that will be available for reciprocal support of other peer

reviews, and the general time frame each team member will be available.

In summary, the key dates for the review are as follows: ________: Receipt of Information from Host Utility by the Reviewers ________: Initial day of the Peer Review meeting at Host Utility offices ________: Final Report on the FPRA Peer Review

Your input on all phases of the process both before-hand and as a post-review critique are encouraged. Evaluation of the process provides a valuable feedback mechanism for

improving the quality of the review and the process.

If you have any questions, please call at any time.

Sincerely,

Coordinator, Owners Group FPRA Peer Review Program cc: ______________________ (Rev iew Team Member)

______________________ (Revie w Team Member)

______________________ (Revie w Team Member)

______________________ (Revie w Team Member)

______________________ (Revie w Team Member)

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-11 Attachment 1 to Peer Review Planning Letter Information to be Available for Review by the Peer Review Team

Information to be sent for review in preparat ion for the on-site visit includes the following: FPRA summary document The Self Assessment of the Fire PRA. Example detailed FPRA documentation, such as: Example analysis guidance documents Add more here--circuit analysis, fire modeling, cable routing, Safe Shutdown Analysis, etc. HRA methodology and example calculations data analysis methodology and common cause methodology FPRA quantification notebook (or methodology), with summary of dominant core damage frequency (CDF) and large early release frequency (LERF) contributors, and the dominant fire areas or

compartments. Containment performance notebook and LERF methodology Sensitivity and uncertainty methodology and results Results of previous peer reviews including open Internal Events F&Os, and the utility disposition of F&OS and their effect on the FPRA. Other material at the discretion of the Host Utility Sensitivity cases, if any have been requested by the Peer Review Team leader prior to the review

In general, the material supplied to the peer review team is the host utility's decision.

However, the more information that can be prov ided in advance, the more the on-site visit will be facilitated. Providing documentation and/

or the FPRA computer model prior to the visit may permit the reviewer(s) to become more familiar with the FPRA model and conduct a

more effective on-site review.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-12 Information to be available on-site in (or in cl ose proximity to) the Meeting Room(s) for the Peer Review Team (All Tier 1, 2, and 3 documents related to the following):

GENERAL PLANT INFORMATION

  • System Descriptions
  • Pre-fire plans
  • Abnormal Operating Procedures for Fire
  • Emergency Operating Procedures
  • Fire Safe Shutdown Analysis and supporti ng analysis such as circuit analysis
  • Technical Specifications
  • P&IDs and General Arrangement Drawings
  • Electrical Schematics GENERAL PRA INFORMATION
  • FPRA
  • Internal Events PRA
  • Guidance Documents
  • Staff Evaluation Report for the IPEEEE, if applicable
  • Responses to the IPEEE Request for Additional Information (If applicable)
  • Previous Internal Events PRA Peer Review results and status of F&Os.
  • Documentation of Independent Review
  • Documentation of Plant Walkdowns for th e Fire PRA (signoff/check off sheets or comment forms)

PLANT PARTITIONING

  • Plant Partitioning Guidance
  • Plant Layout Drawings
  • Fire Protection Boundary Drawings EQUIPMENT SELECTION
  • Equipment Selection Development Guidance
  • Expert Panel Report for Spurious Operation, if performed
  • Appendix R SSD Equipment List
  • PRA Basic Event Mapping to Plant Components
  • Analysis performed in support of Equipment Selection

CABLE SELECTION AND LOCATION

  • Cable Selection Guidance
  • Cable Routing Database (electronic), with supporting software, it needed.
  • Safe Shutdown Analysis Cable Routing results, if different from above.
  • QUALITATIVE SCREENING
  • Qualitative Screening Guidance (if applicable)
  • Results of Qualitative Screening (if applicable)

FPRA PLANT RESPONSE MODEL

  • System Notebooks for new systems modeled (if applicable)
  • Fault Trees NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-13
  • Basic Event Descriptions and Values
  • System Success Criteria Basis for new FPRA event Trees (if applicable)
  • System Descriptions
  • P&IDs and Layout Drawings
  • Electrical Schematics
  • FPRA models and supporting database, such as FRANC models or similar FIRE SCENARIO SELECTION AND ANALYSIS
  • Fire Scenario Selection Guidance
  • Fire Modeling Guidance
  • Scoping Fire Modeling Results and Analysis
  • Detailed Fire Modeling Results and Analysis
  • Control Room Smoke Modeling Analysis
  • Fire Suppression Calculations
  • Multi-Compartment Analysis
  • Scenario Selection Calculations
  • Cable Damage Criteria
  • Fire Wrap Location Information
  • FPRA Walkdowns

IGNITION FREQUENCY

  • Ignition Frequency Guidance
  • Plant Fire History
  • Ignition Source Data Sheets
  • Assessment of Maintenance, Occupancy and Storage of Combustibles
  • Ignition Frequency Walkdowns

QUANTITATIVE SCREENING

  • Quantitative Screening Guidance (If Applicable)
  • Analysis of Contribution for Screen Fire Areas/Compartments (If Applicable)

CIRCUIT FAILURES

  • Circuit Failure Development Guidance
  • Electrical Drawings for key components
  • Circuit Likelihood Analysis

HUMAN RELIABILITY ANALYSIS

  • HRA Guidance Documents
  • Description of HRA Methodology and Human Actions Evaluated
  • Evaluation of fire conditions on local actions
  • Final HRA Values Used

SEISMIC FIRE

  • Seismic Fire Guidance Documents
  • Walkdowns MAINTENANCE AND UPDATE PROCESS
  • FPRA Update Guideline or Procedure
  • Other Procedures or Guidelines which reference FPRA
  • Other Documentation of Involvement in Plant Processes

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-14 Attachment 2 to Peer Review Planning Letter Reviewer Addresses and Contact Information NAME: COMPANY:

Reviewer #1 ADDRESS:

Telephone:

Fax: Email: SSN (if needed for site access):

NAME:

COMPANY:

Reviewer #2 ADDRESS: Telephone:

Fax: Email: SSN (if needed for site access):

NAME:

COMPANY:

Reviewer #3 ADDRESS: Telephone:

Fax: Email: SSN (if needed for site access):

NAME:

COMPANY:

Reviewer #4 ADDRESS: Telephone:

Fax: Email: SSN (if needed for site access):

NAME:

COMPANY:

Reviewer #5 ADDRESS: Telephone:

Fax: Email: SSN (if needed for site access):

NAME:

COMPANY:

Reviewer #6ADDRESS:

Telephone:

Fax: Email: SSN (if needed for site access):

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-15 Attachment 3 to Peer Review Planning Letter Review Schedule And Agenda (not sure we can have an accurate (rough) schedule until after the pilot applications.

However, the general steps of the FPRA can be listed, with slightly more time given to the latter steps (other than uncertainty).

AGENDA ITEM REVIEWER TIME SUNDAY Recommended Pre-Review Meeting of Peer Reviewers to Review the Process/Schedule, and for Calibration (All) (Evening)

MONDAY Overview Meeting of Team

Initial Observations and Changes in Focus (All) 8 - 9 a.m. Overview Presentation by Host Utility Unique Plant Capabilities Location of Reference Material (use Information Request as checklist) Overview of Dominant Fire Scenarios Model Treatment - Solution Method

- Ignition Frequency Data - Quantification

- Spurious Operations

(All) 9 - 10 a.m.

General Review of Documents (All) 10 a.m. - 12 p.m. Demonstration of Model: General Approach Philosophy/Assumptions Nomenclature, etc.

Reviewers 1, 2, 4, 5 & 6 10 a.m. - 12 p.m. LUNCH NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-16 Attachment 3 to Peer Review Planning Letter Review Schedule And Agenda (not sure we can have an accurate (rough) schedule until after the pilot applications.

However, the general steps of the FPRA can be listed, with slightly more time given to the latter steps (other than uncertainty).

AGENDA ITEM REVIEWER TIME Walkdowns: Plant Partitioning Fire Ignition Frequencies Initial Review of Critical Areas Reviewers 1, 4, 5, & 6 1 p.m. - 4 p.m.

nda y-Friday: Detailed review of All Technical Elements All See high level Schedule in NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-17 Attachment 3 to Peer Review Planning Letter Review Schedule And Agenda

AGENDA ITEM REVIEWER TIME FRIDAY Focused Study of Open Items

(All) 8 - 11 a.m.

Considerations of Utility on Feedback Findings (All) 11 a.m. -

Noon LUNCH Exit Meeting (All) 1 - 4 p.m.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 A-18 ATTACHMENT 4 GRAPHICAL OVERVIEW OF REVIEW SCHEDULE (1) Monday Tuesday Wednesday Thursday Friday Element Lead PP Reviewer 1 ES Reviewer 2 CS Reviewer 3 QLS Reviewer 4 PRM Reviewer 2 FSS Reviewer 4 IGN Reviewer 5 QNS Reviewer 4 CF Reviewer 3 HRA Reviewer 1 SF Reviewer 6 FQ Reviewer 6 UNC Reviewer 6 MU Reviewer 5 Notes: (1) Bars indicate days that include scheduled review hours for the Technical Element in question.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-1 Appendix B PEER REVIEW SAMPLE

SUMMARY

SHEETS

Note: The tables in this appendix do not necessarily reflect the latest SRs in the ANS FPRA Standard.

Users should confirm that the structure of the tables below conforms to the version of the ANS standard being applied, and make any changes as necessary.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-2 Dennis- Make sure description above talks about text description for last column.

Table B-1A Sample Summary Table for Plant Partitioning (PP)

High Level Requirement Number Summary of High Level Requirement Summary of Assessment Capability for FPRA HLR-PP-A Define the global boundaries of the FPRA.

HLR-PP-B Perform a Plant Partitioning analysis to identify and define

the fire areas and/or fire

compartments.

HLR-PP-C Documentation Table B-1B Sample Summary Table for Equipment Selection and Location (ES)

High Level Requirement Number Summary of High Level Requirement Summary of Assessment Capability for FPRA HLR-ES-A Identify and locate equipment whose fire-induced failure or

mal-operation will cause an

initiating event.

HLR-ES-B Identify and locate equipment whose failure or mal-operation

would adversely affect credited

functions.

HLR-ES-C Identify and locate instrumentation whose failure or

mal-operation would adversely

affect operator actions.

HLR-ES-D Documentation Create Similar Tables B-1C-xxx for all HLRs. Will likely combine in to a single Table B-1.These are not completed at this point since the standard is being re-written at this point, so the SRs will likely change.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-3

Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations PP-A1 I/II III PP-A2 Meets/Not Meets PP-A3 I/II PP-B1 Meets/Not Meets PP-B2 I II/III PP-B3 I II/III PP-B4 I II/III PP-B5 Meets/Not Meets PP-B6 Meets/Not Meets PP-B7 Meets/Not Meets PP-B8 Meets/Not Meets PP-C1 Meets/Not Meets PP-C2 Meets/Not Meets PP-C3 Meets/Not Meets ES-A1 Meets/Not Meets ES-A2 I II III ES-A3 Meets/Not Meets ES-B1 I II III ES-B2 I II III ES-B3 I/II III ES-B4 Meets/Not Meets ES-B5 Meets/Not Meets ES-C1 I II III ES-C2 I II III ES-C3 Meets/Not Meets ES-D1 Meets/Not Meets CS-A1 Meets/Not Meets NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-4 Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations CS-A2 Meets/Not Meets CS-A3 I II III CS-A4 I II III CS-A5 Meets/Not Meets CS-A6 Meets/Not Meets CS-B1 I II/III CS-C1 Meets/Not Meets CS-C2 Meets/Not Meets QLS-A1 Meets/Not Meets QLS-A2 Meets/Not Meets QLS-A3 Meets/Not Meets QLS-A4 Meets/Not Meets QLS-B1 Meets/Not Meets QLS-B2 Meets/Not Meets ASM-A1 Meets/Not Meets ASM-B1 Meets/Not Meets ASM-B2 Meets/Not Meets ASM-B3 Meets/Not Meets ASM-B4 Meets/Not Meets ASM-B5 Meets/Not Meets ASM-B6 Meets/Not Meets ASM-B7 Meets/Not Meets ASM-C1 Meets/Not Meets FSS-A1 I II/III FSS-A2 I II/III FSS-A3 I II III FSS-A4 Meets/Not Meets FSS-A5 I II III FSS-A6 I II/III FSS-A7 Meets/Not Meets NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-5 Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations FSS-A8 I/II III FSS-B1 I II III FSS-B2 I II/III FSS-B3 I II III FSS-B3-2 nd I/II III FSS-B4 I/II III FSS-B5 Meets/Not Meets FSS-B6 Meets/Not Meets FSS-C1 Meets/Not Meets FSS-C2 I II III FSS-C3 Meets/Not Meets FSS-C4 Meets/Not Meets FSS-C5 Meets/Not Meets FSS-C6 Meets/Not Meets FSS-C7 I/II III FSS-C8 Meets/Not Meets FSS-C9 NO FSS-C9 FSS-C10 I/II III FSS-C11 I II III FSS-C12 - II/III FSS-C13 Meets/Not Meets FSS-D1 I/II III FSS-D2 I II/III FSS-E1 Meets/Not Meets FSS-E2 Meets/Not Meets FSS-E3 Meets/Not Meets FSS-E4 I II III FSS-E5 I II/III FSS-E6 I II/III FSS-F1 Meets/Not Meets NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-6 Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations FSS-F2 I II/III FSS-F3 Meets/Not Meets FSS-F4 I II/III FSS-F5 I II III FSS-F6 I II/III FSS-F7 Meets/Not Meets FSS-F8 Meets/Not Meets IF-A1 Meets/Not Meets IF-A2 I II III IF-A3 I II III IF-A4 Meets/Not Meets IF-A5 Meets/Not Meets IF-A6 I II III IF-B1 Meets/Not Meets IF-B2 Meets/Not Meets IF-B3 Meets/Not Meets QNS-A1 Meets/Not Meets QNS-B1 Meets/Not Meets QNS-B2 Meets/Not Meets QNS-B3 I II III QNS-C1 Meets/Not Meets QNS-C2 Meets/Not Meets CF-A1 Meets/Not Meets CF-A2 Meets/Not Meets CF-A3 Meets/Not Meets CF-A4 Meets/Not Meets CF-A5 Meets/Not Meets CF-A6 Meets/Not Meets CF-B1 I II III CF-C1 Meets/Not Meets NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-7 Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations HRA-A1 Meets/Not Meets HRA-A2 Meets/Not Meets HRA-A3 Meets/Not Meets HRA-A4 Meets/Not Meets HRA-B1 Meets/Not Meets HRA-B2 Meets/Not Meets HRA-B3 Meets/Not Meets HRA-C1 Meets/Not Meets SF-A1 Meets/Not Meets SF-A2 Meets/Not Meets SF-A3 Meets/Not Meets SF-A4 I II/III SF-A5 I II/III SF-B1 Meets/Not Meets FQ-A1 Meets/Not Meets FQ-A2 Meets/Not Meets FQ-A3 Meets/Not Meets F-B1 Meets/Not Meets FQ-C1 Meets/Not Meets UNC-A1 I/II III UNC-B1 I II III UNC-B2 I II III UNC-B3 I II III UNC-C1 Meets/Not Meets UNC-C2 Meets/Not Meets UNC-C3 I II III NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 B-8 Table B-1 FPRA Review Sheets FPRA Capability Categories SR I II III Assign-ment of CC Basis Associated Facts and Observations NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 C-1 Appendix C MAINTENANCE AND UPDATE PROCESS REVIEW CHECKLIST

Note: The Checklist Criteria presented in this appe ndix were extracted from Table MU in Appendix B of NEI 00-02. Thus, the terms "PRA maintenance" and "PRA update" as used in the table and its

footnotes have slightly different meanings than those given and implied in Section 2 of the ASME PRA Standard.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 C-2 Table MU PRA Configuration Control Process (1) DESIGNATO R CRITERIA COMPLIANCE GUIDANCE MU-1 Describes the process used MU-2 Consistent with industry practices MU-3 Sufficient detail provided to update the evaluation INPUT - MONITORING AND COLLECTING NEW INFORMATION (2) MU-4 Each of the following information sources is part of the PSA update process for monitoring new information associated with the following:

- Operational Experience - Plant Design - New Maintenance Policies - Operator Training Program - Technical Specification - Revised Engineering Calculations - Emergency and Abnormal Operating Procedures - Operating Procedures - Emergency Plan - Accident Management Programs - Industry Studies MU-5 Plant specific data is included for quantitative reevaluation.

MODEL CONTROL MU-6 The computer models of the PRA are stored in a controlled manner. This also applies to sensitivity cases that may be performed to support a specific application.

SOFTWARE CONTROL MU-7 Computer code controls are formalized to ensure that the effect on the PRA of changes to these codes are understood and

addressed if appropriate UPDATE/MAINTENANCE MU-8 A process is in place to maintain the PRA. The PRA update model process consists of the elements identified and the steps

in the process. The model update process consists of the

following:

- Identification of Affected Model Elements - Modification of PRA Models - Requantification of PRA Models - Evaluation of Results - Re-Evaluation of Past PRA Applications MU-9 The plant has defined a fixed update schedule and criteria upon which to base the need for an update.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 C-3 Table MU PRA Configuration Control Process (1) DESIGNATO R CRITERIA COMPLIANCE MU-10 The PRA results are evaluated by knowledgeable personnel before the results are used. (3) RE-EVALUATION OF PAST PSA APPLICATIONS MU-11 Past PRA Applications are evaluated qualitatively to assure that the conclusions remain valid. (4) MU-12 Past PRA Applications that may be affected by the latest information and update are re-performed.

DOCUMENTATION MU-13 Documentation reflects the process used MU-14 Includes an independent review for the documented results MU-15 Provides the basis of the update process and the results are traceable to specific changes in design, procedures, training, or operating experience.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 C-4 Notes to Table MU

1) PRA maintenance encompasses the identification and evaluation of new information, and the incorporation of this information into the PRA on an as-needed basis. PRA maintenance typically refers to minor model modifications and effort.

More extensive maintenance may be performed if a specific application requires refinement of certain parts of the model. The on-going maintenance of the PRA can be performed on a resource-available basis when not driven by specific application

needs. PRA maintenance should serve to keep the PRA reasonably current between PRA updates.

A PRA update is a comprehensive revision to the PRA models and associated documentation. PRA updates are scheduled to be performed periodically.

In addition, they may also be performed on an as needed basis as determined by the PRA Grou p leader. It is recommended that the update frequency should be no greater than once per year and no less than once per every three years (or every other fuel cycle).

The need for an update prior to a specific applic ation is dependent upon the needs of the specific application (e.g., greater detail in specified areas) and the effect of new information on the

assessment of the fidelity of the model to the current plant and procedures.

2) The purpose of the monitoring and data collection process is to identify information that could impact the PRA models. Monitoring implies a vigilant attitude towards industry and plant

experiences, information, and data with the purpose of identifying inputs pertinent to the PRA.

Collection refers to the process of logging the in formation and collecting explanatory information to evaluate its importance to the PRA.

3) An evaluation of the results of the PRA update need to be performed to ensure that the plant design and procedural changes have been accurately refl ected and that biases have not been introduced into the accident sequence quantification.
4) The update of the PRA may result in a dramatically changed risk profile. Changes to the risk profile can in turn affect the results of past PRA applicat ions. Possible examples are the safety significance determination in the Maintenance Rule, the in-service test interval for IST evaluations, or the on-line safety matrix to support on-line maintenance safety evaluations. PRA Application re-evaluations can be performed in a rigid fashion that involves a complete re-analysis. However, in general, a qualitative review of the applications would appe ar to be sufficient for many applications. A complete reanalysis may be needed only on a selected basis.

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 D-1 Appendix D

EXAMPLE PRA PEER REVIEW LESSONS LEARNED FORM

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 D-2 PRA Peer Review Team LESSONS LEARNED INPUT FORM Process Lessons Learned:

PRA Lessons Learned:

Review Team Member (optional):

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 E-1 Appendix E SAMPLE FACT AND OBSERVATION FORM

NEI 07-12 Fire PRA Peer Review Process Guidelines (Rev. 0) DRAFT -- DRAFT December 2007 E-2 FACT/OBSERVATION REGARDING PRA TECHNICAL ELEMENTS OBSERVATION (ID:

)

10 / Technical Element _ / Supporting Requirement

____

LEVEL OF SIGNIFICANCE:

BASIS FOR SIGNIFICANCE POSSIBLE RESOLUTION

PLANT RESPONSE OR RESOLUTION

LEVELS OF SIGNIFICANCE FOR FACTS AND OBSERVATIONS Finding An observation (an issue or discrepancy) that is necessary to address to ensure the technical adequacy of the PRA, the capability of the PRA, or the robustness of the PRA update process. Suggestion An observation considered desirable to maintain maximum flexibility in PRA applications and consistency with Industry practices, or simply to enhance the PRA's technical capability as time and resources permit, at the discretion of the host utility. Also incl udes editorial or minor technical item left to the discretion of the host utility. BP Represents "best industry practice," to the extent that other PRA owners would want to emulate.

10 A suggested format for F&O ID number is ee-sr-##, where ee is the 2 letter code for the Technical Element (e.g., HR for Human Reliability Analysis), sr is the identifier for the specific supporting requirement (e.g., A3), and

    1. is a sequential number for F&Os for the given SR. For example, HR-A3-02 would be the second F&O referring to supporting requirement HR-A3.