The holder of an operating license under this part shall submit a Licensee Event Report (LER) for any event of the type described in this paragraph within 60 days after the discovery of the event. (v) Any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to: (C) Control the release of radioactive material. Contrary to the above from June 2, 2014, until October 5, 2015, Exelon failed to submit an LER notification to the NRC within 60 days after discovery of a condition which could have prevented the safety function of a
SSC needed to control the release of radioactivity on April 2, 2014 at 11:20 a.m. Specifically,
secondary containment being declared
inoperable due to both airlock doors being open at the same time in Mode 5 with an
OPDRV in progress. The inspectors reviewed the violation using
IMC 0612, Appendix B and the
NRC Enforcement Policy. This violation impacted the regulatory process so traditional enforcement applies. Comparing this violation to the examples in the
NRC Enforcement Policy Chapter 6, the violation matches
Severity Level IV Example 6.9.d.9, a licensee fails to make a report required by
10 CFR 50.72 or
10 CFR 50.73. The NRC did not rely upon the information to make any regulatory decisions, and the error did not result in increased scope or effort of NRC inspections. Compliance was restored when Exelon submitted
LER 05000410/2014-007-01 to correct the public record and inform the NRC. Exelon staff entered the issue into its
CAP.