ML18003B143

From kanterella
Revision as of 06:50, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppls 850115 Response to Violations Noted in Insp Rept 50-400/84-31.Verification Check of Removal of Scotch 33 Tape from Containment & Main Steam Tunnel Completed.Item Considered Resolved
ML18003B143
Person / Time
Site: Harris 
Issue date: 02/08/1985
From: PARSONS R M
CAROLINA POWER & LIGHT CO.
To: GRACE J N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-321 NUDOCS 8507170570
Download: ML18003B143 (2)


See also: IR 05000400/1984031

Text

Carolina Power&Light Company'tL~ll nI P.O.Box 101, New Hill, NC 27562 February 8, 1985 Dr.J.Nelson Grace United States Nuclear Regulatory

Commission

Region II 101 Marietta Street, Northwest (Suite 2900)A tlanta, Georgia 30323 NRC-321 Dear Dr.Grace: In our October 31, 1980 response to RII: GFM/RLP 50-000/80-31-01, we informed you of the actions taken and planned to resolve the referenced

violation concerning

the use of Scotch 33 tape in safety-related

applications

without adequate engineering

review for environmental

qualification.

At the time of our response, it was projected that corrective

actions would be completed by January 15, 1985.In our January 15, 1985 letter, we informed you that via Field Change Request (FCR-E-2712

Rev.0)the Harris Plant Engineering

Section had identified

the Containment

and Main Steam Tunnel for which Scotch 33 tape, previously

used in safety-related

cable applications, must be removed and that efforts to remove the tape from these applications

had been completed.

We also stated that we were in the verification

process to check completeness

of the work.This letter is to inform you that we have completed our verification

check.On this basis, we consider the item to be resolved.Thank you for your consideration

in this matter.Yours very truly, R.M.Parsons Project General Manager Completion

Assurance Shearon Harris Nuclear Power Plant RMP/dah cc: Messrs.G.Maxwell/R.

Prevatte (NRC-SHNPP)

Mr.B.C.Buckley (NRC)8507170570

850208 PDR ADOCK 05000400 9:PDR

4 I c I~I.~IE Itft(ttff (I E~f f E I j I E tl'I~E It f~II ht Ef~[~tt'gt II EE