ML080700308
| ML080700308 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/29/2008 |
| From: | Garchow S M Operations Branch IV |
| To: | Entergy Operations |
| References | |
| 50-313/08-301, 50-368/08-301, ES-301-2 50-313/08-301, 50-368/08-301 | |
| Download: ML080700308 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 Reactivity
- b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
D/L/S (ESF) 5 Containment c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 Plant Service Systems e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 RCS Heat Removal f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 RCS Inventory
- g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 Reactor Pressure Control h. ANO-2-JPM-NRC-ELEC001 062 A2.11 RO 3.7 SRO 4.1 Back feed a non-vital bus from a vital bus D/S 6 Electrical In-Plant Systems
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
- j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1 ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 Reactivity
- b. c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. e. f. g. h. In-Plant Systems
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
- j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1 ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code*
Safety Function a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1 Reactivity
- b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)
D/L/S (ESF) 5 Containment c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO- 2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentationd. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8 Plant Service Systems e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4 RCS Heat Removal f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2 RCS Inventory
- g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3 Reactor Pressure Control h. NA In-Plant Systems
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6 Electrical
- j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8 Plant Service Systems k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4 RCS Heat Removal @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3
< 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 < 3 / < 2 (randomly selected) > 1 / > 1 / > 1 ES-301, Page 23 of 27