ML080700308

From kanterella
Jump to navigation Jump to search
2008-02-Final Operating Exam Outline
ML080700308
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-301-2 50-313/08-301, 50-368/08-301
Download: ML080700308 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)

D/L/S (ESF) 5 Containment

c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d. ANO-2-JPM-NRC-IA02 078 A3.01 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8

Plant Service Systems

e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4

RCS Heat Removal

f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2

RCS Inventory

g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3

Reactor Pressure Control

h. ANO-2-JPM-NRC-ELEC001 062 A2.11 RO 3.7 SRO 4.1 Back feed a non-vital bus from a vital bus D/S 6

Electrical In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b.
c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d.
e.
f.
g.
h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One -2 Date of Examination: 2/25/2008 Exam Level: RO SRO-I SRO-U Operating Test Number: 1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. ANO-2-JPM-NRC-CVCS2 004 A4.07 RO 3.9/SRO 3.7 Perform Emergency Boration A/D/L/S 1

Reactivity

b. ANO-2-JPM-NRC-EOP01 026 A2.03 RO 3.2 SRO 3.7 Secure Containment Spray System (inadvertent)

D/L/S (ESF) 5 Containment

c. ANO-2-JPM-NRC-CREV01 073 A3.01 RO-2.9 SRO-3.1 Manually actuate control room ventilation A/N/S (ESF) 7 Instrumentation
d. ANO-2-JPM-NRC-IA02 078 AA2.06 RO 3.1 SRO 3.2 Perform actions required by low Instrument Air Header Pressure M/S 8

Plant Service Systems

e. ANO-2-JPM-NRC-MTG05 045 K3.01 RO 2.9 SRO 3.2 Synchronize MTG to grid with failure of speed./load control results in excess steam demand A/D/L/S 4

RCS Heat Removal

f. ANO-2-JPM-NRC-SIT01 006 A2.03 RO-3.3 SRO-3.7 High pressure fill of Safety Injection Tank A/D/S 2

RCS Inventory

g. ANO-2-JPM-NRC-LTOP 010 K4.03 RO 3.8 SRO 4.1 Respond to Annunciator 2K10 C-4, Loop 1Low temperature over pressure relief valve alignment incorrect D/L/S/P 3

Reactor Pressure Control

h. NA In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. ANO-2-JPM-NRC-AACGLS 064 A3.06 RO 3.3 SRO 3.4 Local start of AAC diesel generator manually and locally A/D/E/P 6

Electrical

j. ANO-2-JPM-NRC-FPEM1 033 A2.03 RO 3.1 SRO 3.5 Add Water from Loop I SW to SFP D/R 8

Plant Service Systems

k. ANO-2-JPM-NRC-LOF01 CE E06 EA1.1 RO 4.0 SRO 3.9 Align Condensate pump for start during a loss of all Feed water event D/L/E 4

RCS Heat Removal All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

< 9 / < 8 / < 4

> 1 / > 1 / > 1

> 1 / > 1 / > 1

> 2 / > 2 / > 1

< 3

< 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301, Page 23 of 27