Point Beach, Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) 05000266/2008009 (Drs); 05000301/2008009 (DRS)
ML080910312
Person / Time
Site: Point Beach  
Issue date: 03/28/2008
From: Stone A M
NRC/RGN-III/DRS/EB2
To: McCarthy J
Florida Power & Light Energy Point Beach
References
IR-08-009
Download: ML080910312 (9)


See also: IR 05000266/2008009

Text

March 28, 2008

Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC

6610 Nuclear Road Two Rivers, WI 54241

SUBJECT: POINT BEACH NUCLEAR PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000266/2008009(DRS); 05000301/2008009(DRS) Dear Mr. McCarthy: On June 23, 2008, the NRC will begin a triennial baseline Component Design Bases Inspection (CDBI) at the Point Beach Nuclear Plant. A team of six inspectors will perform this

3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21. The CDBI inspection focuses on components that have high risk and low design margins. The components to be reviewed during this baseline inspection will be identified during an in-office preparation week prior to the first week of the on-site inspection. In addition, a number of risk

significant operator actions and operating experience issues, associated with the component samples, will also be selected for review. The inspection will include three weeks on-site, including the information gathering during the first on-site week. The inspection team will consist of six NRC inspectors, of which five will focus on engineering and one on operations. The current inspection schedule is as follows:

  • On-site weeks: June 23, 2008, through June 27, 2008; July 7, 2008, through July 11, 2008; and July 21, 2008, through July 25, 2008. The team will be preparing for the inspection, mainly during the week of June 16, 2008, as discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the inspection team during the week of June 23, 2008, to review probabilistic risk assessment data, and assist in identifying risk significant components, which will be reviewed during the

inspection. Experience with previous baseline design inspections of similar depth and length has shown that these types of inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for

the inspection.

J. McCarthy -2- It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than May 12, 2008. By May 30, 2008, the lead inspector will communicate the initial selected set of approximately 30 high risk components.
  • The second group of documents requested are those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the

initial selected components, should be provided to the lead inspector at the Regional Office no later than June 9, 2008. During the in-office preparation activities, the team may identify additional information needed to support the inspection.

  • The third and last group includes the additional information above, as well as plant specific reference material. This information should be available to the team onsite on

June 23, 2008. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our licensing contact for this inspection is Ms. Fritzie Flentje of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9717 or via e-mail at zelig.falevits@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Enclosure: Component Design Bases Inspection (CDBI) Document Request

See Attached Distribution

Letter to Mr. James McCarthy from Ms. A. M. Stone dated March 28, 2008.

SUBJECT: POINT BEACH NUCLEAR PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000266/2008009(DRS); 05000301/2008009(DRS)

cc w/encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and

Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division

Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

J. McCarthy -2-

It is important that all of these documents are up to date and complete in order to minimize the number of

additional documents requested during the preparation and/or the on-site portions of the inspection.

Insofar as possible, this information should be provided electronically to the lead inspector. The

information request has been divided into three groups: * The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than May 12, 2008. By May 30, 2008, the lead

inspector will communicate the initial selected set of approximately 30 high risk components. * The second group of documents requested are those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector at the Regional Office no later than June 9, 2008. During the in-office preparation activities, the team may identify additional information

needed to support the inspection. * The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on June 23, 2008. It is also requested that

corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. The lead inspector for this inspection is Mr. Zelig Falevits. We understand that our licensing contact for this inspection is Ms. Fritzie Flentje of your organization. If there are any questions about the inspection

or the material requested in the enclosure, please contact the lead inspector at (630) 829-9717 or via e-

mail at zelig.falevits@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and

Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Enclosure: Component Design Bases Inspection (CDBI) Document Request

DISTRIBUTION

See next page G:\DRS\Work in Progress\Ltr. 03__08 Point Beach CDBI RFI CEA.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE: RIII RIII RIII RIII NAME: AMStone for CAcosta: ls AMStone DATE: 03/28/08 03/28/08

OFFICIAL RECORD COPY

Letter to Mr. James McCarthy from Ms. A M. Stone dated March 28, 2008.

SUBJECT: POINT BEACH NUCLEAR PLANT REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) 05000266/2008009(DRS); 05000301/2008009(DRS)

cc w/encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and

Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks

Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

DISTRIBUTION:

TEB CFL

EMH1 LXR1 RidsNrrDirsIrib

MAS KGO

JKH3 CAA1 RGK DRPIII DRSIII

PLB1 TXN ROPreports@nrc.gov

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESING BASES INSPECTION (CDBI)

Enclosure

1Inspection Report: 05000266/2008009; 05000301/2008009 (DRS) Inspection Dates: June 23, 2008, through June 27, 2008; July 7, 2008, through July 11, 2008; and July 21, 2008, through July 25, 2008 Inspection Procedure: IP 71111.21 "Component Design Bases Inspection" Lead Inspector: Zelig Falevits, Lead Inspector (630) 829-9717 zelig,falevits@nrc.gov

I. Information Requested Prior to the On-site Information Gathering/Inspection Week

The following information is requested by May 12, 2008, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on CDROM. The CDROM

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of boiling water reactor technology). 1. Risk ranking of top 150 components from your site specific probabilistic safety analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV) (as applicable). 2. Provide a list of the top 200 cut-sets from your PSA. 3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide copies of your human reliability worksheets for these items. 4. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire. Provide narrative description of each coded event (including fire, flood zone description). 5. Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated design heat removal etc.).

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

26. List of available design (setup) margins for valves in the motor-operated valve (MOV) and air-operated valve (AOV) programs.

7. List of high risk Maintenance Rule Systems/components based on engineering or expert panel judgment.

8. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category.

9. Site top ten issues list (if applicable).

10. A list of operating experience evaluations for the last 3 years.

11. Information of any common cause failure of components experienced in the last 5 years at your facility.

12. List of Root Cause Evaluations associated with component failures or design issues initiated/completed in the last 5 years.

13. List of open operability evaluations.

14. Current management and engineering organizational chart.

15. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 16. One line electrical drawings (ac and dc) and key diagrams (paper copies). II. Information requested (for the approximate 30 selected components) to be available by June 9, 2008, (will be reviewed by the team in the Regional Office during the week of June 16, 2008). This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc). 1. List of condition reports (corrective action documents) associated with each of the selected components for the last 4 years. 2. The corrective maintenance history associated with each of the selected components for the last 4 years. 3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files. Please review the calculations and also provide copies of referenced material (such as drawings, engineering requests,

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

3and vendor letters). 4. System Health Reports, System Descriptions, and/or Design Basis Documents that are associated with each of the selected components. 5. A list of modifications associated with each of the selected components.

This list should include a descriptive paragraph on the purpose of the modification. Please ensure this list only includes design completed (not canceled) modifications. 6. Copies of operability evaluations (open/closed for last 3 years) associated with each of the selected components and plans for restoring operability, if applicable. 7. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable. 8. Copies of any open temporary modifications associated with each of the selected components, if applicable. 9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). 10. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection. 11. A copy of engineering/operations related audits completed in the last 2 years.

12. Provide list of PRA assumptions regarding operator actions and the associated procedures. 13. Provide copies of any simulator scenarios, lesson plans, or job performance measures for the selected operator actions. 14. Provide copies of the results of any time-dependent simulator scenarios or job performance measures for operator crews/individuals for the selected operator actions. 15. Provide copies of the emergency operating procedures, normal and abnormal operating procedures and any alarm response procedures for the selected operator actions. Also provide copies of the conduct for operations and operability

determination procedures.

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

4III. Additional Information to be provided on June 23, 2008 on-site (for final 15 - 20 selected components)

During the in-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of April 28, 2008. IV. Information Requested to be provided throughout the inspection

1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). 3. One complete set of P&IDs (paper copies).

4. Reference materials. (make available if needed during all on-site weeks): a. IPE/PRA Report; b. Procurement documents for components selected (verify retrievable);

c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and d. Vendor manuals. If you have questions regarding the information requested, please contact the lead inspector.