Search results
Jump to navigation
Jump to search
- ML22278A231 (category Updated Final Safety Analysis Report (UFSAR))101-D11 Safeguard switchgear feeder breaker 152-11509/CSR X X 101-D21 Safeguard switchgear feeder breaker 152-11609/CSR X X 101-D12 Safeguard switchgear298 KB (44,577 words) - 06:05, 2 September 2023
- must be considered as AOOs. Analysis of the>c incidents indicates that the f. ingle CEA withdrawal incident is the most limiting of these events. An analysis39 KB (6,074 words) - 17:23, 4 December 2021
- ML20046C129 (category LICENSEE EVENT REPORT (SEE ALSO AO)Licensee Event Report (LER).269/93-07, concerning the technical inoperability of. the alternate Reactor Coolant Makeup System. This report is being submitted25 KB (2,778 words) - 09:01, 11 March 2020
- COPIES RECEIVED:LTR g ENCL ~ SIZE'D TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc. NOTES: RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME28 KB (3,252 words) - 01:51, 4 February 2020
- IR 05000324/1997014 (category INSPECTION REPORT)threshold for initiating a Condition Report and, upon identifying such a condition, personnel must initiate a Condition Report. Contrary to this procedural requirement14 KB (1,955 words) - 18:13, 20 November 2020
- ML20198N656 (category INSPECTION REPORT)threshold for initiating a Condition Report and, upon identifying such a condition, personnel must initiate a Condition Report. Contrary to this procedural requirement25 KB (1,974 words) - 19:14, 20 December 2021
- IR 05000445/1999010 (category INSPECTION REPORT)team reviewed in detail Plant incident Report 98-000150, " Diesel Fire Pump X-05 Engine Failure," which addressed an incident involving the failure of Diesel-Driven220 KB (34,458 words) - 07:06, 3 December 2021
- NOSA-BYR-23- Security Programs Audit Report 01/17/2023 (AR 4546557) through 03/03/2023 71130.08 Corrective Action Assignment Report 01/01/2020 Documents through15 KB (1,751 words) - 07:49, 17 April 2023
- accepted the Utility's Safeteam's attempt to discredit my my concerns (this ' report and my reply would be on file with the NRC). ' 'In addition, I was subjected13 KB (1,508 words) - 13:11, 22 February 2021
- ML19317E045 (category REPORTABLE OCCURRENCE REPORT (SEE ALSO AO)U 4 DUKE POWER COMPANY OCONET UNIT 1 'f' Report No.: 'RO-269/77-31 ." , Report Date: January 26,'1978 . g. j- * ..'. ~ i . 7 occurrence Date: Dheember4 KB (487 words) - 08:24, 1 February 2020
- NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems (category Updated Final Safety Analysis Report (UFSAR))- run in any channel as convenient. 6. Safeguard control cables - run in two channels as required. 7. Safeguard power cables - separated into sufficient90 KB (15,323 words) - 16:07, 12 July 2018
- ML22340A174 (category Updated Final Safety Analysis Report (UFSAR))Evaluation Report UFSAR Revision 31.0 INDIANA MICHIGAN POWER Revised: 31.0 D. C. COOK NUCLEAR PLANT Chapter: 8 UPDATED FINAL SAFETY ANALYSIS REPORT Page: 31139 KB (21,599 words) - 16:15, 8 February 2023
- properly describe the sequence of events following the severe corrosion incident at the Davis-Besse nuclear power plant - a case where the licensee, FirstEnergy6 KB (867 words) - 19:18, 12 November 2019
- ML19316A381 (category REPORTABLE OCCURRENCE REPORT (SEE ALSO AO). DUKE POWER COMPANY OCONEE UNIT 1 Report Number: R0-269/78-8 ort Date April 11, 1978 cccurrence Date March 15, 1978 Facility: Oconee Unit 1, Seneca, South2 KB (260 words) - 08:57, 1 February 2020
- ML20010D237 (category LICENSEE EVENT REPORT (SEE ALSO AO)8 enc POAM 354 U. S. NUCLEAA AgGULATORY comenstS5aC8e mm LICENSEE EVENT REPORT EXHIB1T A CCNTMCL SLOCX: l (PLEASE PalNT SA TYPT ALL REQU R CD INFCRMATIONI8 KB (547 words) - 10:54, 17 February 2020
- L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 (category Report)Triconex Topical Report, Document No. 7286-545-1-A Revision 4, May 15, 2012. 21. Triconex Topical Report; Part 4 of Approved Triconex Topical Report, Document272 KB (41,010 words) - 01:05, 16 September 2022
- facts associated with the incident, and also provide you the opportunity to discuss any ritigatirg circumstances for the incident and your plans for short-tcrm12 KB (676 words) - 18:45, 12 February 2021
- IR 05000336/1989016 (category INSPECTION REPORT)The following reports were reviewed: -- Monthly Operating Report, May 1989 -- Monthly Operating Report, June 1989 -- Startup Test Report for Cycle 10,40 KB (6,069 words) - 03:24, 13 February 2021
- ML20151U387 (category TECHNICAL SPECIFICATIONS & TEST REPORTS)must be considered as AOOs. Analysis of these incidents indicates that the single CEA withdrawal incident is the most limiting of these events. An analysis39 KB (5,956 words) - 18:41, 24 October 2020
- ML20052A646 (category LICENSEE EVENT REPORT (SEE ALSO AO)T Update Report - Previous Report Date December 21, 1981 Nac Ponae ses u.s.NuctEAn REGULATORY COneaussaces 17 771 LICENSEE EVENT REPORT EXHIBIT A CONTROL10 KB (998 words) - 23:09, 9 March 2020