Pages that link to "Power-Operated Valves"
Jump to navigation
Jump to search
The following pages link to Power-Operated Valves:
Displayed 50 items.
- ML16053A501 (← links)
- ML16022A135 (← links)
- ML16041A308 (← links)
- ML16014A174 (← links)
- ML16054A419 (← links)
- ML16011A073 (← links)
- Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con (← links)
- Information Notice 2010-25, Inadequate Electrical Connections (← links)
- Information Notice 2010-27, Ventilation System Preventive Maintenance and Design Issues (← links)
- Information Notice 2010-23, IN: Malfunctions of Emergency Diesel Generator Speed Switch Circuits (← links)
- Information Notice 2010-21, Crack-Like Indication in the U-bend Region of a Thermally Treated Alloy 600 Steam Generator Tube (← links)
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations due to Misalignment (← links)
- Information Notice 2010-18, Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants. (← links)
- Information Notice 2010-20, Repetitive Failures of Turbine Driven Auxiliary Feedwater Pumps Due To Ineffective Corrective Actions (← links)
- Information Notice 2010-14, Containment Concrete Surface Condition Examination Frequency And Acceptance Criteria (← links)
- Information Notice 2010-17, Common Cause Failure of Boiling-Water Reactor Recirculation Pumps With Variable Speed Drives (← links)
- Information Notice 2010-13, Failure to Verify that Post-Fire-Shutdown Procedures Can Be Performed (← links)
- Information Notice 2010-09, Importance of Understanding Circuit Breaker Control Power Indications (← links)
- Information Notice 2010-11, Potential for Steam Voiding Causing Residual Heat Removal System Inoperability (← links)
- Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.59 (← links)
- Information Notice 2010-07, Welding Defects in Replacement Steam Generators (← links)
- Information Notice 2010-05, Management of Steam Generator Loose Parts and Automated Eddy Current Data Analysis (← links)
- Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due To Latent Manufacturing Defect (← links)
- Information Notice 2010-03, Failures of Motor-Operated Valves Due to Degraded Stem Lubricant (← links)
- Information Notice 2009-31, Non-Power Reactor Licensee Notifications to NRC during an Incident (← links)
- Information Notice 2010-06, Inadvertent Control Rod Withdrawal Event While Shutdown (← links)
- Information Notice 2010-01, Pipe Support Anchors Installed Improperly (← links)
- Information Notice 2010-02, Construction-Related Experience with Cables, Connectors, and Junction Boxes (← links)
- Information Notice 1995-02, Problems With General Electric CR2940 Contact Blocks In Medium-Voltage Circuit Breakers (← links)
- Information Notice 1995-04, Excessive Cooldown and Depressurization of the Reactor Coolant System Following Loss of Offsite Power (← links)
- Information Notice 1995-20, Failures in Rosemount Pressure Transmitters Due to Hydrogen Permeation Into Sensor Cell (← links)
- Information Notice 1995-49, Seismic Adequacy of Thermo-Lag Panels (← links)
- Information Notice 2010-23, In: Malfunctions of Emergency Diesel Generator Speed Switch Circuits (← links)
- Information Notice 2010-22, Fuel Assemblies Damaged During Refueling Operations Due to Misalignment (← links)
- Information Notice 2010-13, Failure to Verify That Post-Fire-Shutdown Procedures Can Be Performed (← links)
- RIS 2000-08, Voluntary Submission of Performance Indicator Data (← links)
- Information Notice 1995-02, Problems With General Electric Cr2940 Contact Blocks In Medium-Voltage Circuit Breakers (← links)
- Information Notice 1995-01, DOT Safety Advisory: High Pressure Aluminum Seamless and Aluminum Composite Hoop-Wrapped Cylinders (← links)
- Information Notice 1995-03, Loss of Reactor Coolant Inventory and Potential Loss of Emergency Mitigation Functions While in a Shutdown Condition (← links)
- Information Notice 1995-05, Undervoltage Protection Relay Settings Out of Tolerance Due to Test Equipment Harmonics (← links)
- Information Notice 1995-06, Potential Blockage of Safety-Related Strainers by Material Brought Inside Containment (← links)
- Information Notice 1995-07, Radiopharmaceutical Vial Breakage During Preparation (← links)
- Information Notice 1995-08, Inaccurate Data Obtained With Clamp-On Ultrasonic Flow Measurement Instruments (← links)
- Information Notice 1995-09, Use of Inappropriate Guidelines and Criteria for Nuclear Piping and Pipe Support Evaluation and Design (← links)
- Information Notice 1995-10, Potential for Loss of Automatic Engineered Safety Features Actuation (← links)
- Information Notice 1995-11, Failure of Condensate Piping Because of Erosion/Corrosion at Flow-Straightening Device (← links)
- Information Notice 1995-13, Potential for Data Collection Equipment to Affect Protection System Performance (← links)
- Information Notice 1995-31, Motor-Operated Valve Failure Caused by Stem Protector Pipe Interference (← links)
- Information Notice 1995-14, Susceptibility of Containment Sump Recirculation Gate Valves to Pressure Locking (← links)
- Information Notice 1995-15, Inadequate Logic Testing of Safety-Related Circuits (← links)