Pages that link to "BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3"
Jump to navigation
Jump to search
The following pages link to BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3:
Displayed 50 items.
- BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test (← links)
- BVY 09-021, Submittal of Revision of Technical Specification Bases Pages (← links)
- BVY 09-014, Submittal of Revised Technical Specification Bases Pages (← links)
- BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements (← links)
- BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations (← links)
- BVY 08-081, Submittal of Revision of Technical Specification Bases Page 29 (← links)
- BVY 08-076, Revision of Technical Specification Bases Pages (← links)
- BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements (← links)
- BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications (← links)
- BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems (← links)
- BVY 08-066, Submittal of Corrected Technical Specification Page (← links)
- BVY 08-060, Submittal of Revision of Technical Specification Bases Page 220 (← links)
- BVY 08-046, Revision of Technical Specification Bases Page 97 (← links)
- BVY 08-031, Revision of Technical Specification Bases Page (← links)
- BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications (← links)
- BVY 07-052, Revision of Technical Specification Bases Pages (← links)
- BVY 07-043, Revision of Technical Specification Bases Pages (← links)
- BVY 07-015, Technical Specifications Proposed Change No. 272 - Transmittal of Final Retyped Technical Specifications Pages (← links)
- BVY 06-028, Technical Specifications Proposed Change No. 272, Relocation of LCO 3.6.I and SR 4.6.I and Addition of LCO 3.0.8 Regarding Snubbers (← links)
- BVY 06-001, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 44 Extended Power Uprate - Revised License and Technical Specifications (← links)
- ML053530180 (← links)
- BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis (← links)
- BVY 05-099, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 39 Extended Power Uprate - Risk Analysis of Containment Overpressure (← links)
- BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information (← links)
- BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information (← links)
- ML052440213 (← links)
- BVY 05-074, Transmittal of Vermont Yankee Technical Specification Proposed Change No. 263 - Supplement No. 31 Extended Power Uprate - Response for Additional Information (← links)
- BVY 05-072, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 30 Extended Power Uprate - Response to Request for Additional Information (← links)
- ML051190293 (← links)
- BVY 05-038, Attachment 2, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 27 Extended Power Uprate - Dryer Acoustic Load Methodology Benchmark, VY-RPT-05-00006 VYNPS Acoustic Model Benchmark- Dryer Acoustic Load. (← links)
- ML050960052 (← links)
- ML050840253 (← links)
- BVY 05-024, Attachment 4, Vermont Yankee - Proposed Technical Specification Change No. 263 - Supplement No. 24 Extended Power Uprate Response to RAI SRXB-A-6 (← links)
- ML050540149 (← links)
- BVY 05-002, Corrected Technical Specification Bases Page and Administrative Changes to Facility Operating License Page (← links)
- BVY 04-127, Technical Specification Proposed Change No. 271 Removal of Inservice Testing Details (← links)
- BVY 04-113, Vermont Yankee Nuclear Power Station - Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides (← links)
- BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information (← links)
- BVY 04-086, Attachment 2, Vermont Yankee - Proposed Technical Specification Change No. 263 - Supplement No. 12 Extended Power Uprate - Revised Grid Impact Study Revised System Impact Study (← links)
- BVY 04-081, Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information (← links)
- BVY 04-074, Vermont Yankee - Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, (← links)
- ML040860266 (← links)
- ML040430354 (← links)
- BVY 04-005, Technical Specification Proposed Change No. 257 Implementation of Arts/Mellla at Vermont Yankee Correction of Peak Cladding Temperature for GE13 Fuel (← links)
- BVY 03-107, Technical Specification Proposed Change No. 262 - Additional Information Alternative Source Term - Copyright Release (← links)
- ML032930143 (← links)
- ML032810447 (← links)
- ML032190646 (← links)
- ML031490373 (← links)
- ML031200664 (← links)