Search results

Jump to navigation Jump to search
Results 41 – 60 of 69,385
Advanced search

Search in namespaces:

  • ML22278A231 (category Updated Final Safety Analysis Report (UFSAR))
    101-D11 Safeguard switchgear feeder breaker 152-11509/CSR X X 101-D21 Safeguard switchgear feeder breaker 152-11609/CSR X X 101-D12 Safeguard switchgear
    298 KB (44,577 words) - 06:05, 2 September 2023
  • must be considered as AOOs. Analysis of the>c incidents indicates that the f. ingle CEA withdrawal incident is the most limiting of these events. An analysis
    39 KB (6,074 words) - 17:23, 4 December 2021
  • ML20046C129 (category LICENSEE EVENT REPORT (SEE ALSO AO)
    Licensee Event Report (LER).269/93-07, concerning the technical inoperability of. the alternate Reactor Coolant Makeup System. This report is being submitted
    25 KB (2,778 words) - 09:01, 11 March 2020
  • COPIES RECEIVED:LTR g ENCL ~ SIZE'D TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc. NOTES: RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME
    28 KB (3,252 words) - 01:51, 4 February 2020
  • IR 05000324/1997014 (category INSPECTION REPORT)
    threshold for initiating a Condition Report and, upon identifying such a condition, personnel must initiate a Condition Report. Contrary to this procedural requirement
    14 KB (1,955 words) - 18:13, 20 November 2020
  • ML20198N656 (category INSPECTION REPORT)
    threshold for initiating a Condition Report and, upon identifying such a condition, personnel must initiate a Condition Report. Contrary to this procedural requirement
    25 KB (1,974 words) - 19:14, 20 December 2021
  • IR 05000445/1999010 (category INSPECTION REPORT)
    team reviewed in detail Plant incident Report 98-000150, " Diesel Fire Pump X-05 Engine Failure," which addressed an incident involving the failure of Diesel-Driven
    220 KB (34,458 words) - 07:06, 3 December 2021
  • IR 05000454/2023401 (category Inspection Report) (section Inspection Report)
    NOSA-BYR-23- Security Programs Audit Report 01/17/2023 (AR 4546557) through 03/03/2023 71130.08 Corrective Action Assignment Report 01/01/2020 Documents through
    15 KB (1,751 words) - 07:49, 17 April 2023
  • accepted the Utility's Safeteam's attempt to discredit my my concerns (this ' report and my reply would be on file with the NRC). ' 'In addition, I was subjected
    13 KB (1,508 words) - 13:11, 22 February 2021
  • ML19317E045 (category REPORTABLE OCCURRENCE REPORT (SEE ALSO AO)
    U 4 DUKE POWER COMPANY OCONET UNIT 1 'f' Report No.: 'RO-269/77-31 ." , Report Date: January 26,'1978 . g. j- * ..'. ~ i . 7 occurrence Date: Dheember
    4 KB (487 words) - 08:24, 1 February 2020
  • - run in any channel as convenient. 6. Safeguard control cables - run in two channels as required. 7. Safeguard power cables - separated into sufficient
    90 KB (15,323 words) - 16:07, 12 July 2018
  • ML22340A174 (category Updated Final Safety Analysis Report (UFSAR))
    Evaluation Report UFSAR Revision 31.0 INDIANA MICHIGAN POWER Revised: 31.0 D. C. COOK NUCLEAR PLANT Chapter: 8 UPDATED FINAL SAFETY ANALYSIS REPORT Page: 31
    139 KB (21,599 words) - 16:15, 8 February 2023
  • properly describe the sequence of events following the severe corrosion incident at the Davis-Besse nuclear power plant - a case where the licensee, FirstEnergy
    6 KB (867 words) - 19:18, 12 November 2019
  • ML19316A381 (category REPORTABLE OCCURRENCE REPORT (SEE ALSO AO)
    . DUKE POWER COMPANY OCONEE UNIT 1 Report Number: R0-269/78-8 ort Date April 11, 1978 cccurrence Date March 15, 1978 Facility: Oconee Unit 1, Seneca, South
    2 KB (260 words) - 08:57, 1 February 2020
  • ML20010D237 (category LICENSEE EVENT REPORT (SEE ALSO AO)
    8 enc POAM 354 U. S. NUCLEAA AgGULATORY comenstS5aC8e mm LICENSEE EVENT REPORT EXHIB1T A CCNTMCL SLOCX: l (PLEASE PalNT SA TYPT ALL REQU R CD INFCRMATIONI
    8 KB (547 words) - 10:54, 17 February 2020
  • Triconex Topical Report, Document No. 7286-545-1-A Revision 4, May 15, 2012. 21. Triconex Topical Report; Part 4 of Approved Triconex Topical Report, Document
    272 KB (41,010 words) - 01:05, 16 September 2022
  • facts associated with the incident, and also provide you the opportunity to discuss any ritigatirg circumstances for the incident and your plans for short-tcrm
    12 KB (676 words) - 18:45, 12 February 2021
  • IR 05000336/1989016 (category INSPECTION REPORT)
    The following reports were reviewed: -- Monthly Operating Report, May 1989 -- Monthly Operating Report, June 1989 -- Startup Test Report for Cycle 10,
    40 KB (6,069 words) - 03:24, 13 February 2021
  • ML20151U387 (category TECHNICAL SPECIFICATIONS & TEST REPORTS)
    must be considered as AOOs. Analysis of these incidents indicates that the single CEA withdrawal incident is the most limiting of these events. An analysis
    39 KB (5,956 words) - 18:41, 24 October 2020
  • ML20052A646 (category LICENSEE EVENT REPORT (SEE ALSO AO)
    T Update Report - Previous Report Date December 21, 1981 Nac Ponae ses u.s.NuctEAn REGULATORY COneaussaces 17 771 LICENSEE EVENT REPORT EXHIBIT A CONTROL
    10 KB (998 words) - 23:09, 9 March 2020
View ( | ) (20 | 50 | 100 | 250 | 500)