Issue date | Title | Topic | |
---|---|---|---|
ML071720197 | 31 October 2006 | Enclosure 3 Technical Evaluation Report on the High Winds, Floods, Transportation and Other (Hfo) External Events Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External Events | Safe Shutdown High winds Tornado Generated Missile |
ML072130375 | 31 July 2007 | CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz | Finite Element Analysis Liquid penetrant Power Uprate |
ML072130382 | 31 July 2007 | CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 Hz | Finite Element Analysis Liquid penetrant Power Uprate |
ML072130386 | 31 July 2007 | CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution | Power Uprate |
ML072130401 | 31 July 2007 | CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz | |
ML072130415 | 31 July 2007 | CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components | Power Uprate |
ML072130429 | 31 July 2007 | C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings | Power Uprate |
ML072360262 | 31 August 2007 | 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0 | Finite Element Analysis |
ML072360263 | 31 August 2007 | 07-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0 | Finite Element Analysis Power Uprate Affidavit |
ML072750045 | 24 September 2007 | ANP-2631, Revision 0, Browns Ferry Unit 3 Cycle 14 Reload Analysis Report. | Shutdown Margin Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Feedwater Heater Feedwater Controller Failure MELLLA Commercial Grade Fuel cladding Power Uprate |
ML072850122 | 10 October 2007 | BWRVIP-145NP, BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Core Shroud Material Samples Using RAMA Fluence Methodology | |
ML081010453 | 30 April 2008 | CDI Report No. 08-07NP, Rev. 1, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer. | Finite Element Analysis Liquid penetrant Power Uprate |
ML081010454 | 31 March 2008 | CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed. | Finite Element Analysis Power Uprate Affidavit |
ML081700294 | 12 June 2008 | Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to ACRS Conclusions and Recommendations Regarding Containment Overpressure Credit | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Operator Manual Action Significance Determination Process Earthquake Fire Protection Program Power Uprate |
ML081750081 | 16 June 2008 | Encl. 6, Calculation Package 0006982.301, Extended Power Uprate Main Steam Line Strain Gage Vibration Monitoring, and Encl. 7, Response to Round 15 Group 4 and Round 17 Request for Additional Information | Time of Discovery Stress corrosion cracking Power Uprate |
ML081750083 | 30 June 2008 | Enclosure 8, CDI Report No. 08-15NP, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer and Tie-Bar Modifications, Revision 1 | Finite Element Analysis Liquid penetrant Power Uprate |
ML081750084 | 30 June 2008 | Enclosure 9, CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 1 | Power Uprate |
ML081760256 | 30 June 2008 | CDI Report No. 08-16NP, Stress Assessments of Brown Ferry Nuclear Unit 2 Steam Dryer with Tie Bar and Hood Modifications, Revision 0 | Finite Element Analysis Liquid penetrant Power Uprate |
ML081760260 | 30 June 2008 | CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed, Revision 2 | Power Uprate Affidavit |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Feedwater Heater Power change Downpower Power Uprate Overspeed trip |
ML083250083 | 14 November 2008 | (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Steam Dryer Reports | Power Uprate Affidavit |
ML083250084 | 31 October 2008 | CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Revision 3. | Power Uprate |
ML083250085 | 31 October 2008 | CDI Report No. 08-14NP, Flow-Induced Vibration in the Main Steam Lines at Browns Ferry Nuclear Units 1 and 2, with and Without Acoustic Side Branches, and Resulting Steam Dryer Loads Revision 0. | Finite Element Analysis Flow Induced Vibration Power Uprate |
ML083250086 | 31 October 2008 | CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Cover Page - Page 37 | Finite Element Analysis Liquid penetrant Power Uprate |
ML083250090 | 31 October 2008 | CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Page 38 - End | Power Uprate |
ML083250115 | 30 November 2008 | CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Cover Page - Page 38 | Finite Element Analysis Liquid penetrant Power Uprate |
ML083250116 | 30 November 2008 | CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Page 39 - End | Power Uprate Affidavit |
ML083260034 | 31 October 2008 | CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 2. | Power Uprate |
ML090550636 | 31 December 2008 | BWRVIP-199NP, BWR Vessel and Internals Project, Testing and Evaluation of the Monticello 300 Degree Capsule, 1016567NP Final Report | Power Uprate |
ML090760631 | 28 February 2009 | CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 3 (Non-proprietary Version) | Power Uprate |
ML090760632 | 31 March 2009 | CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 2 (Non-proprietary Version) | Finite Element Analysis |
ML091000292 | 31 March 2009 | CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 3 | Finite Element Analysis Power Uprate |
ML091000293 | 31 March 2009 | CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 4 | Power Uprate Affidavit |
ML091070227 | 31 January 2008 | Guidance for Post Fire Safe Shutdown Circuit Analysis | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Multiple Spurious Operation Emergency Lighting Thermoset Exemption Request Power-Operated Valves Fire Protection Program |
ML091070228 | 31 December 2008 | Guidance for Post Fire Safe Shutdown Circuit Analysis | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Probabilistic Risk Assessment Coatings Operator Manual Action Multiple Spurious Operation Emergency Lighting Significance Determination Process Thermoset Large early release frequency Exemption Request Earthquake Chernobyl Fuel cladding Biofouling Fire Protection Program |
ML092020223 | 30 April 2009 | CDI Report No. 08-05NP, Rev. 4, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Enclosure 5 | Power Uprate |
ML092020224 | 31 May 2009 | CDI Technical Note No. 08-13NP, Rev. 1, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2, Enclosure 6 | Finite Element Analysis Power Uprate Affidavit |
ML092020229 | 30 June 2009 | CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Introduction Through Page 62, Enclosure 4 | Finite Element Analysis Liquid penetrant Power Uprate |
ML092020231 | 30 June 2009 | CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Page 63 Through 128, Enclosure 4 | Power Uprate |
ML092440373 | 31 August 2009 | CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Cover Through Chapter 4 (Non-proprietary Version) | Finite Element Analysis Liquid penetrant Power Uprate |
ML092440374 | 31 August 2009 | CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Chapter 5 Through End (Non-proprietary Version) | Power Uprate |
ML092440375 | 31 August 2009 | C.D.I. Report No. 09-22NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 110% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz (Non-proprietary Version) | Finite Element Analysis |
ML092460495 | 31 August 2009 | CDI Report No. 09-23NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 120% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Enclosure 6 | Power Uprate |
ML092460496 | 31 August 2009 | CDI Technical Note No. 09-12NP, Rev. 0, Limit Curve Analysis with ACM Rev. 4 for Power Ascension to 120% OLTP at Browns Ferry Nuclear Unit 1, Enclosure 7 | Finite Element Analysis Power Uprate Affidavit |
ML093080159 | 30 September 2009 | Attachment 7, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2833NP, Revision 0, Mechanical Design Report, Reload BFE1-9 ATRIUM-10 Fuel Assemblies | Anticipated operational occurrence Power change Power Uprate |
ML093080160 | 30 June 2009 | Attachment 9, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2807(NP), Revision 0, Thermal Hydraulic Design Report for ATRIUM-10 Fuel Assemblies | Anticipated operational occurrence Water rod |
ML093080161 | 31 August 2009 | Attachment 11, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2850(NP), Revision 0, Fuel Cycle Design Report | Shutdown Margin Water rod |
ML093100119 | 30 September 2009 | Attachment 16, Browns Ferry Unit 1 -Technical Specification Change 467, 51-9121503-001, Revision 001, Engineering Information Record, Responses to NRC Comments Regarding Proposed Fuel Transition Amendment | MELLLA Power Uprate Stretch Power Uprate |
ML093100121 | 31 October 2009 | Attachment 19, Browns Ferry Unit 1 -Technical Specification Change 467, ANP-2638NP, Revision 2, Applicability of Areva Np BWR Methods to Extend Power Uprate Conditions | Shutdown Margin Minimum Critical Power Ratio Power Uprate Water rod |
ML093100123 | 3 September 2009 | Attachment 23, Browns Ferry Unit 1 - Technical Specification Change 467, 51-9121246-000, Revision 0, MCPR Safety Limit Analysis | Anticipated operational occurrence Minimum Critical Power Ratio |