Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML08289091318 March 1985Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18095A43324 July 1990Advises That NRC Initiated Formal Section 7 Consultation W/ Dept of Commerce on 900618 Re Util Preparation of Biological Assessment of Plants
ML18100A45825 June 1993Discusses 930624 Meeting W/Westinghouse & WOG Rrg Re Development of Generic Action to Assist All Westinghouse Licensees in Responding to NRC GL 93-04
ML18101A78513 June 1995Advises That Util Current Drawer I Will Be Changed to Drawer 0509,effective 950612.Ltr from Hancocks Bridge Post Ofc Encl
ML19309E08815 April 1980Notifies That Meeting of Environ Technical Advisory Committee Will Be Held 800509 in White River Junction,Vt. Forwards Annual,Ecological Studies of CT River,Vernon/Vt, Rept IX,1979.
ML20045H0892 July 1993Provides Generic Assessment of plant-specific Compensatory Actions Implemented by Plant Prior to Startup of Either Unit
ML20054E92310 June 1982Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055B26913 July 1982Releases Public Version of Revised Radiological Emergency Response Plan Implementing Procedure
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20055G43328 June 1990Forwards D Kwiatkowski of FEMA Transmitting FEMA Region I Rept for 881129-1201 Full Participation Exercise at Plants.Evaluation of 881202 Medical Drill Also Included in Rept.Encls Should Be Transmitted to Licensee
ML20056C32913 May 1993Notification of 930521 Meeting W/Util in Brattleboro,Vt to Discuss Periodic Administrative Review of Status of Licensing Issues Re Vynp
ML20056E4456 August 1993Notifies of 930812 Meeting W/Util in Rockville,Md for Presentation on Plant Decommissioned TS
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20056E53316 August 1993Notification of 930901 Mtg W/Util & State of or in Rainier, or to Discuss Proposed Studies of Plant Sys at Plant
ML20057A66527 August 1993Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing
ML20057B60716 September 1993Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Status of Decommission Activities & Physical Security
ML20057C1148 September 1993Notification of 930920 Significant Licensee Meeting 93-117 in King of Prussia,Pa to Discuss Mgt Initiatives
ML20057C11715 September 1993Notification of 930921 Significant Licensee Meeting 93-122 in Vernon,Vt to Discuss AIT Findings from Fuel Handling Events
ML20057F40212 October 1993Forwards Notice of Receipt of Petition.W/O Notice
ML20057G11913 October 1993Notification of Significant Licensee Meeting 93-130 W/Util on 931020 in King of Prussia,Pa to Discuss Svc Water Insp Plans
ML20058B3786 July 1982Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA