Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000282/LER-1995-003, Forwards LER 95-003 Re Discovery That Containment Hydrogen Monitors Not Being Correctly Calibr.Procedures Will Be Revised to Provide for Proper Handling of Temp Compensation Coefficients13 April 1995Forwards LER 95-003 Re Discovery That Containment Hydrogen Monitors Not Being Correctly Calibr.Procedures Will Be Revised to Provide for Proper Handling of Temp Compensation Coefficients
05000282/LER-1995-011, Forwards LER 95-011 & Lists Four Commitments Re Violation Concerning Surveillance of Cooling Water Sys8 September 1995Forwards LER 95-011 & Lists Four Commitments Re Violation Concerning Surveillance of Cooling Water SysHydrostatic
05000282/LER-1996-006, Forwards LER 96-006-00 Re Cooling Water Surveillance Tests Missed as Results of Rescheduling Error.Licensee Made New NRC Commitment18 March 1996Forwards LER 96-006-00 Re Cooling Water Surveillance Tests Missed as Results of Rescheduling Error.Licensee Made New NRC Commitment
05000282/LER-1997-005, Forwards LER 97-005-00 Which Contained One New Commitment in Italicized Statement in Corrective Action Section8 May 1997Forwards LER 97-005-00 Which Contained One New Commitment in Italicized Statement in Corrective Action Section
05000282/LER-1997-011, Forwards LER 97-011-00 Re Failure to Test Low Pressure auto- Start Function of 121 Motor Driven Cooling Water Pump & Inadequate Separation Between Trains a & B Low Pressure auto-start Switches.Two New Commitments Made31 October 1997Forwards LER 97-011-00 Re Failure to Test Low Pressure auto- Start Function of 121 Motor Driven Cooling Water Pump & Inadequate Separation Between Trains a & B Low Pressure auto-start Switches.Two New Commitments Made
05000282/LER-1997-013, Forwards LER 97-013-00 Re Inoperability of AFW & Entry Into Tech Spec 3.0.C.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statements in Bold Italics. Event Reported Via Emergency Notification Sys on 917 November 1997Forwards LER 97-013-00 Re Inoperability of AFW & Entry Into Tech Spec 3.0.C.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statements in Bold Italics. Event Reported Via Emergency Notification Sys on 971018
05000282/LER-1997-016, Forwards LER 97-016-00 Re Rc Pump Lube Oil Lift Pump Oil Leak Collection Sys Design That Was Not in Compliance w/10CFR50,App R Section Iii.O.One New NRC Commitment Was Indicated in CAs Section Statement of LER19 December 1997Forwards LER 97-016-00 Re Rc Pump Lube Oil Lift Pump Oil Leak Collection Sys Design That Was Not in Compliance w/10CFR50,App R Section Iii.O.One New NRC Commitment Was Indicated in CAs Section Statement of LER
05000282/LER-1997-017, Forwards LER 97-017-00 Re Separation of Pressurizer Level Indication Channels Not in Compliance w/10CFR50,App R, Section III.G.2.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statement in Bold Italics2 January 1998Forwards LER 97-017-00 Re Separation of Pressurizer Level Indication Channels Not in Compliance w/10CFR50,App R, Section III.G.2.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statement in Bold Italics
05000282/LER-1998-001, Forwards LER 98-001-01 Re Leakage Through Redundant CR Steam Exclusion Dampers Found to Exceed Value Assumed in HELB Analysis.Licensee Has Modified Three NRC Commitments Made in Original Ler,As Noted by Corrective Actions in It24 July 1998Forwards LER 98-001-01 Re Leakage Through Redundant CR Steam Exclusion Dampers Found to Exceed Value Assumed in HELB Analysis.Licensee Has Modified Three NRC Commitments Made in Original Ler,As Noted by Corrective Actions in Italics
05000282/LER-1998-002, Forwards Proprietary Rept, Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2, in Response to RAI Dtd 980218. Suppl Rept for LER 98-02 Will Also Be Delayed.Rept W6 April 1998Forwards Proprietary Rept, Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2, in Response to RAI Dtd 980218. Suppl Rept for LER 98-02 Will Also Be Delayed.Rept Withheld
05000282/LER-1998-003, Forwards LER 98-003-00 Re Routing of Containment Dome Fan Coil Unit Exhaust Damper Control Circuit Wiring Contrary to Configuration Described in Usar.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 920 February 1998Forwards LER 98-003-00 Re Routing of Containment Dome Fan Coil Unit Exhaust Damper Control Circuit Wiring Contrary to Configuration Described in Usar.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980122
05000282/LER-1998-004, Forwards LER 98-004-00,re ESF Equipment in Alternate Train Inoperable During DG Monthly Surveillance Run30 March 1998Forwards LER 98-004-00,re ESF Equipment in Alternate Train Inoperable During DG Monthly Surveillance Run
05000282/LER-1998-005, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl22 May 1998Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl
05000282/LER-1998-007, Forwards LER 98-007-01,re Diesel Generator Logic Testing. Commitment Made within Ltr Noted in Corrective Actions Section30 June 1998Forwards LER 98-007-01,re Diesel Generator Logic Testing. Commitment Made within Ltr Noted in Corrective Actions Section
05000282/LER-1998-009, Forwards LER 98-009-00 Re Rc Vent Sys Testing.New Commitments Made by Util Are Indicated in Corrective Actions Section Statement in Bold Italics27 August 1998Forwards LER 98-009-00 Re Rc Vent Sys Testing.New Commitments Made by Util Are Indicated in Corrective Actions Section Statement in Bold Italics
05000282/LER-1998-010, Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER8 April 1999Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LERHot Short
05000282/LER-1998-011, Forwards LER 98-011-00 Re Improper Acceptance Criteria in Surveillance Procedure.Util Has Made One New NRC Commitment as Indicated in Corrective Action Section Statement in Bold Italics14 September 1998Forwards LER 98-011-00 Re Improper Acceptance Criteria in Surveillance Procedure.Util Has Made One New NRC Commitment as Indicated in Corrective Action Section Statement in Bold Italics
05000282/LER-1998-012, Forwards LER 98-012-02,re Fire Areas 58/73 App R Safe Shutdown Analysis Issues.Rept Has Been Changed to Delete Inappropriate Characterization of Aspect of Event as Violation of 10CFR50,App R9 November 1998Forwards LER 98-012-02,re Fire Areas 58/73 App R Safe Shutdown Analysis Issues.Rept Has Been Changed to Delete Inappropriate Characterization of Aspect of Event as Violation of 10CFR50,App RSafe Shutdown
05000282/LER-1998-013, Forwards LER 98-013-00 Re Discovery of Scaffold Installation Interfering with Operability of Steam Exclusion Check Damper.Util Has Made Two New Commitments as Indicated in Bold Italics in Corrective Actions Section10 November 1998Forwards LER 98-013-00 Re Discovery of Scaffold Installation Interfering with Operability of Steam Exclusion Check Damper.Util Has Made Two New Commitments as Indicated in Bold Italics in Corrective Actions Section
05000282/LER-1998-014, Forwards LER 98-014-01,re Fire Area 32 App R Safe Shutdown Analysis Issues.Detailed Safety Significance Evaluation for Event Included in Attachment 2.Event Reported Via ENS IAW 10CFR50.72 on 98082726 October 1998Forwards LER 98-014-01,re Fire Area 32 App R Safe Shutdown Analysis Issues.Detailed Safety Significance Evaluation for Event Included in Attachment 2.Event Reported Via ENS IAW 10CFR50.72 on 980827Safe Shutdown
05000282/LER-1998-015, Forwards LER 98-015-01,re Containment to RHR MOVs App R Safe Shutdown Analysis Issues.Attachment 2 Contains Detailed Safety Significance Evaluation for NRC Info.Event Reported Via ENS IAW 10CFR50.72 on 98082726 October 1998Forwards LER 98-015-01,re Containment to RHR MOVs App R Safe Shutdown Analysis Issues.Attachment 2 Contains Detailed Safety Significance Evaluation for NRC Info.Event Reported Via ENS IAW 10CFR50.72 on 980827Safe Shutdown
05000282/LER-1998-017, Forwards LER 98-017-00,re Failure to Test SR Hi Flux Trip Functions During non-refuelings Outages.Commitments Made by Util Are Indicated in Corrective Actions Section of LER3 December 1998Forwards LER 98-017-00,re Failure to Test SR Hi Flux Trip Functions During non-refuelings Outages.Commitments Made by Util Are Indicated in Corrective Actions Section of LER
05000282/LER-1998-018, Forwards LER 98-018-00,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid17 December 1998Forwards LER 98-018-00,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric AcidBoric Acid
05000282/LER-1998-019, Forwards LER 98-019-00 Re Discovery That Containment Penetration Piping Segment Could Be Pressurized Beyond Design Basis.Util Made One New NRC Commitment,Indicated as Corrective Action Statement in Italics8 January 1999Forwards LER 98-019-00 Re Discovery That Containment Penetration Piping Segment Could Be Pressurized Beyond Design Basis.Util Made One New NRC Commitment,Indicated as Corrective Action Statement in Italics
05000282/LER-1999-004, Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics3 May 1999Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics
05000282/LER-1999-005, Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved7 June 1999Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved
05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics18 June 1999Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics
05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics23 July 1999Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics
05000306/LER-1978-017, Forwards LER 78-017/03L-012 September 1978Forwards LER 78-017/03L-0
05000306/LER-1978-019, Forwards LER 78-019/03L-012 October 1978Forwards LER 78-019/03L-0
05000306/LER-1978-024, Forwards LER 78-024/03L-025 January 1979Forwards LER 78-024/03L-0
05000306/LER-1982-009, Forwards LER 82-009/03L-04 June 1982Forwards LER 82-009/03L-0
05000306/LER-1982-010, Forwards LER 82-010/01T-02 July 1982Forwards LER 82-010/01T-0
05000306/LER-1982-012, Forwards LER 82-012/03L-030 July 1982Forwards LER 82-012/03L-0
05000306/LER-1982-013, Forwards LER 82-013/03L-018 August 1982Forwards LER 82-013/03L-0
05000306/LER-1982-014, Forwards LER 82-014/03L-024 August 1982Forwards LER 82-014/03L-0
05000306/LER-1982-017, Forwards LER 82-017/03L-08 October 1982Forwards LER 82-017/03L-0
05000306/LER-1982-027, Forwards LER 82-027/03L-05 January 1983Forwards LER 82-027/03L-0
05000306/LER-1983-002, Forwards LER 83-002/03L-018 March 1983Forwards LER 83-002/03L-0
05000306/LER-1983-004, Forwards LER 83-004/03L-024 March 1983Forwards LER 83-004/03L-0
05000306/LER-1995-002, Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error19 July 1995Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error
05000306/LER-1995-003, Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe26 July 1995Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe
05000306/LER-1997-001, Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 97020717 March 1997Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207Safe Shutdown
05000306/LER-1997-004, Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed27 October 1997Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed
05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 97111717 December 1997Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117
05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 98012120 February 1998Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121
05000306/LER-1998-002, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl22 May 1998Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl
05000306/LER-1998-003, Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics25 June 1998Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in ItalicsFire Barrier
05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements18 January 1999Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements
A120282, Forwards List of Objectives & Guidelines for Emergency Plan Exercise7 December 1982Forwards List of Objectives & Guidelines for Emergency Plan Exercise