05000282/LER-1995-003, Forwards LER 95-003 Re Discovery That Containment Hydrogen Monitors Not Being Correctly Calibr.Procedures Will Be Revised to Provide for Proper Handling of Temp Compensation Coefficients | 13 April 1995 | Forwards LER 95-003 Re Discovery That Containment Hydrogen Monitors Not Being Correctly Calibr.Procedures Will Be Revised to Provide for Proper Handling of Temp Compensation Coefficients | |
05000282/LER-1995-011, Forwards LER 95-011 & Lists Four Commitments Re Violation Concerning Surveillance of Cooling Water Sys | 8 September 1995 | Forwards LER 95-011 & Lists Four Commitments Re Violation Concerning Surveillance of Cooling Water Sys | Hydrostatic |
05000282/LER-1996-006, Forwards LER 96-006-00 Re Cooling Water Surveillance Tests Missed as Results of Rescheduling Error.Licensee Made New NRC Commitment | 18 March 1996 | Forwards LER 96-006-00 Re Cooling Water Surveillance Tests Missed as Results of Rescheduling Error.Licensee Made New NRC Commitment | |
05000282/LER-1997-005, Forwards LER 97-005-00 Which Contained One New Commitment in Italicized Statement in Corrective Action Section | 8 May 1997 | Forwards LER 97-005-00 Which Contained One New Commitment in Italicized Statement in Corrective Action Section | |
05000282/LER-1997-011, Forwards LER 97-011-00 Re Failure to Test Low Pressure auto- Start Function of 121 Motor Driven Cooling Water Pump & Inadequate Separation Between Trains a & B Low Pressure auto-start Switches.Two New Commitments Made | 31 October 1997 | Forwards LER 97-011-00 Re Failure to Test Low Pressure auto- Start Function of 121 Motor Driven Cooling Water Pump & Inadequate Separation Between Trains a & B Low Pressure auto-start Switches.Two New Commitments Made | |
05000282/LER-1997-013, Forwards LER 97-013-00 Re Inoperability of AFW & Entry Into Tech Spec 3.0.C.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statements in Bold Italics. Event Reported Via Emergency Notification Sys on 9 | 17 November 1997 | Forwards LER 97-013-00 Re Inoperability of AFW & Entry Into Tech Spec 3.0.C.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statements in Bold Italics. Event Reported Via Emergency Notification Sys on 971018 | |
05000282/LER-1997-016, Forwards LER 97-016-00 Re Rc Pump Lube Oil Lift Pump Oil Leak Collection Sys Design That Was Not in Compliance w/10CFR50,App R Section Iii.O.One New NRC Commitment Was Indicated in CAs Section Statement of LER | 19 December 1997 | Forwards LER 97-016-00 Re Rc Pump Lube Oil Lift Pump Oil Leak Collection Sys Design That Was Not in Compliance w/10CFR50,App R Section Iii.O.One New NRC Commitment Was Indicated in CAs Section Statement of LER | |
05000282/LER-1997-017, Forwards LER 97-017-00 Re Separation of Pressurizer Level Indication Channels Not in Compliance w/10CFR50,App R, Section III.G.2.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statement in Bold Italics | 2 January 1998 | Forwards LER 97-017-00 Re Separation of Pressurizer Level Indication Channels Not in Compliance w/10CFR50,App R, Section III.G.2.Util Made One New NRC Commitment Indicated as Corrective Actions Section Statement in Bold Italics | |
05000282/LER-1998-001, Forwards LER 98-001-01 Re Leakage Through Redundant CR Steam Exclusion Dampers Found to Exceed Value Assumed in HELB Analysis.Licensee Has Modified Three NRC Commitments Made in Original Ler,As Noted by Corrective Actions in It | 24 July 1998 | Forwards LER 98-001-01 Re Leakage Through Redundant CR Steam Exclusion Dampers Found to Exceed Value Assumed in HELB Analysis.Licensee Has Modified Three NRC Commitments Made in Original Ler,As Noted by Corrective Actions in Italics | |
05000282/LER-1998-002, Forwards Proprietary Rept, Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2, in Response to RAI Dtd 980218. Suppl Rept for LER 98-02 Will Also Be Delayed.Rept W | 6 April 1998 | Forwards Proprietary Rept, Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2, in Response to RAI Dtd 980218. Suppl Rept for LER 98-02 Will Also Be Delayed.Rept Withheld | |
05000282/LER-1998-003, Forwards LER 98-003-00 Re Routing of Containment Dome Fan Coil Unit Exhaust Damper Control Circuit Wiring Contrary to Configuration Described in Usar.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 9 | 20 February 1998 | Forwards LER 98-003-00 Re Routing of Containment Dome Fan Coil Unit Exhaust Damper Control Circuit Wiring Contrary to Configuration Described in Usar.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980122 | |
05000282/LER-1998-004, Forwards LER 98-004-00,re ESF Equipment in Alternate Train Inoperable During DG Monthly Surveillance Run | 30 March 1998 | Forwards LER 98-004-00,re ESF Equipment in Alternate Train Inoperable During DG Monthly Surveillance Run | |
05000282/LER-1998-005, Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl | 22 May 1998 | Forwards LER 98-005-01,re Inoperability of Actuation Logic for MSIV in Certain Flooding Conditions from Feedwater Line Break.Commitments Made within Ltr,Encl | |
05000282/LER-1998-007, Forwards LER 98-007-01,re Diesel Generator Logic Testing. Commitment Made within Ltr Noted in Corrective Actions Section | 30 June 1998 | Forwards LER 98-007-01,re Diesel Generator Logic Testing. Commitment Made within Ltr Noted in Corrective Actions Section | |
05000282/LER-1998-009, Forwards LER 98-009-00 Re Rc Vent Sys Testing.New Commitments Made by Util Are Indicated in Corrective Actions Section Statement in Bold Italics | 27 August 1998 | Forwards LER 98-009-00 Re Rc Vent Sys Testing.New Commitments Made by Util Are Indicated in Corrective Actions Section Statement in Bold Italics | |
05000282/LER-1998-010, Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER | 8 April 1999 | Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER | Hot Short |
05000282/LER-1998-011, Forwards LER 98-011-00 Re Improper Acceptance Criteria in Surveillance Procedure.Util Has Made One New NRC Commitment as Indicated in Corrective Action Section Statement in Bold Italics | 14 September 1998 | Forwards LER 98-011-00 Re Improper Acceptance Criteria in Surveillance Procedure.Util Has Made One New NRC Commitment as Indicated in Corrective Action Section Statement in Bold Italics | |
05000282/LER-1998-012, Forwards LER 98-012-02,re Fire Areas 58/73 App R Safe Shutdown Analysis Issues.Rept Has Been Changed to Delete Inappropriate Characterization of Aspect of Event as Violation of 10CFR50,App R | 9 November 1998 | Forwards LER 98-012-02,re Fire Areas 58/73 App R Safe Shutdown Analysis Issues.Rept Has Been Changed to Delete Inappropriate Characterization of Aspect of Event as Violation of 10CFR50,App R | Safe Shutdown |
05000282/LER-1998-013, Forwards LER 98-013-00 Re Discovery of Scaffold Installation Interfering with Operability of Steam Exclusion Check Damper.Util Has Made Two New Commitments as Indicated in Bold Italics in Corrective Actions Section | 10 November 1998 | Forwards LER 98-013-00 Re Discovery of Scaffold Installation Interfering with Operability of Steam Exclusion Check Damper.Util Has Made Two New Commitments as Indicated in Bold Italics in Corrective Actions Section | |
05000282/LER-1998-014, Forwards LER 98-014-01,re Fire Area 32 App R Safe Shutdown Analysis Issues.Detailed Safety Significance Evaluation for Event Included in Attachment 2.Event Reported Via ENS IAW 10CFR50.72 on 980827 | 26 October 1998 | Forwards LER 98-014-01,re Fire Area 32 App R Safe Shutdown Analysis Issues.Detailed Safety Significance Evaluation for Event Included in Attachment 2.Event Reported Via ENS IAW 10CFR50.72 on 980827 | Safe Shutdown |
05000282/LER-1998-015, Forwards LER 98-015-01,re Containment to RHR MOVs App R Safe Shutdown Analysis Issues.Attachment 2 Contains Detailed Safety Significance Evaluation for NRC Info.Event Reported Via ENS IAW 10CFR50.72 on 980827 | 26 October 1998 | Forwards LER 98-015-01,re Containment to RHR MOVs App R Safe Shutdown Analysis Issues.Attachment 2 Contains Detailed Safety Significance Evaluation for NRC Info.Event Reported Via ENS IAW 10CFR50.72 on 980827 | Safe Shutdown |
05000282/LER-1998-017, Forwards LER 98-017-00,re Failure to Test SR Hi Flux Trip Functions During non-refuelings Outages.Commitments Made by Util Are Indicated in Corrective Actions Section of LER | 3 December 1998 | Forwards LER 98-017-00,re Failure to Test SR Hi Flux Trip Functions During non-refuelings Outages.Commitments Made by Util Are Indicated in Corrective Actions Section of LER | |
05000282/LER-1998-018, Forwards LER 98-018-00,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid | 17 December 1998 | Forwards LER 98-018-00,discovered That Surveillance Testing of Boric Acid Storage Tank Level Instrumentation Places Plant in Condition Where Single Failure Could Cause Inability to Inject Concentrated Boric Acid | Boric Acid |
05000282/LER-1998-019, Forwards LER 98-019-00 Re Discovery That Containment Penetration Piping Segment Could Be Pressurized Beyond Design Basis.Util Made One New NRC Commitment,Indicated as Corrective Action Statement in Italics | 8 January 1999 | Forwards LER 98-019-00 Re Discovery That Containment Penetration Piping Segment Could Be Pressurized Beyond Design Basis.Util Made One New NRC Commitment,Indicated as Corrective Action Statement in Italics | |
05000282/LER-1999-004, Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics | 3 May 1999 | Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics | |
05000282/LER-1999-005, Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved | 7 June 1999 | Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved | |
05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics | 18 June 1999 | Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics | |
05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics | 23 July 1999 | Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics | |
05000306/LER-1978-017, Forwards LER 78-017/03L-0 | 12 September 1978 | Forwards LER 78-017/03L-0 | |
05000306/LER-1978-019, Forwards LER 78-019/03L-0 | 12 October 1978 | Forwards LER 78-019/03L-0 | |
05000306/LER-1978-024, Forwards LER 78-024/03L-0 | 25 January 1979 | Forwards LER 78-024/03L-0 | |
05000306/LER-1982-009, Forwards LER 82-009/03L-0 | 4 June 1982 | Forwards LER 82-009/03L-0 | |
05000306/LER-1982-010, Forwards LER 82-010/01T-0 | 2 July 1982 | Forwards LER 82-010/01T-0 | |
05000306/LER-1982-012, Forwards LER 82-012/03L-0 | 30 July 1982 | Forwards LER 82-012/03L-0 | |
05000306/LER-1982-013, Forwards LER 82-013/03L-0 | 18 August 1982 | Forwards LER 82-013/03L-0 | |
05000306/LER-1982-014, Forwards LER 82-014/03L-0 | 24 August 1982 | Forwards LER 82-014/03L-0 | |
05000306/LER-1982-017, Forwards LER 82-017/03L-0 | 8 October 1982 | Forwards LER 82-017/03L-0 | |
05000306/LER-1982-027, Forwards LER 82-027/03L-0 | 5 January 1983 | Forwards LER 82-027/03L-0 | |
05000306/LER-1983-002, Forwards LER 83-002/03L-0 | 18 March 1983 | Forwards LER 83-002/03L-0 | |
05000306/LER-1983-004, Forwards LER 83-004/03L-0 | 24 March 1983 | Forwards LER 83-004/03L-0 | |
05000306/LER-1995-002, Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error | 19 July 1995 | Forwards LER 95-002 Re Rt While Subcritical Caused by Personnel Error | |
05000306/LER-1995-003, Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe | 26 July 1995 | Forwards LER 95-003 Re Unplanned auto-start of AFW Pump Due to Faulty Adjustment of Circuit Breaker Cell Switch.Maint Procedure Will Be Revised to Include Taking Off Switch Cover & Performing Visual Insp of Contact Wipe | |
05000306/LER-1997-001, Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207 | 17 March 1997 | Forwards LER 97-001-00 Re Transport of Heavy Load Over Irradiated Fuel or Safe SD Equipment W/O Establishing Required Conditions.Event Reported Via Emergency Emergency Notification Sys IAW 10CFR50.72 on 970207 | Safe Shutdown |
05000306/LER-1997-004, Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed | 27 October 1997 | Forwards LER 97-004-00 Re Plant Shutdown Due to Greater than Allowable Leakage from Maint Airlock Per Ts.Commitment Made by Util Listed | |
05000306/LER-1997-005, Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 | 17 December 1997 | Forwards LER 97-005-00 Re Sudden Pressure Lockout of Number 10 Transformer Which Resulted in Auto Load Rejection/ Restoration on SR Bus on 971117 | |
05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 | 20 February 1998 | Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 | |
05000306/LER-1998-002, Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl | 22 May 1998 | Forwards LER 98-002-01,re Defect in Primary Sys Pressure Boundary Observed on Motor Tube Base of Part Length CRDM Housing.Commitments Made within Ltr,Encl | |
05000306/LER-1998-003, Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics | 25 June 1998 | Forwards LER 98-003-00 Re Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Licensee Made Four New Commitments,Indicated as Corrective Action Statements in Italics | Fire Barrier |
05000306/LER-1998-006, Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements | 18 January 1999 | Forwards LER 98-006-00 Re Unplanned Actuation of ESF Equipment During Performance of Sp Due to Personnel Error. Event Was Reported Via ENS IAW 10CFR50.72 on 981219.Two New Commitments Are Indicated as C/A Statements | |
A120282, Forwards List of Objectives & Guidelines for Emergency Plan Exercise | 7 December 1982 | Forwards List of Objectives & Guidelines for Emergency Plan Exercise | |