Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML06060008122 February 2006Comment (53) of Michael Marantz, Opposing the Vermont Yankee Uprate Without an Independent Safety Assessment
ML06060008322 February 2006Comment (54) of Jesse Peters Opposing the Vermont Yankee Uprate and the Risk Assessments in Draft Safety Evaluation Based Released by NRC Based on the Fallacious Assumption That the Reactor Is Brand New
ML06060010023 February 2006Comment (55) of Peter Dramondstone on the Vermont Yankee Uprate and an Independent Safety Inspection
ML0606001087 February 2006Comment (56) of Leslie Read on Whether Vermont Yankee Nuclear Power Plant Has Been Properly Evaluated for Safe Operations with the Applied for 20% Power Uprate
ML0606001137 February 2006Comment (57) of Linda A. Bailey Opposing the NRC Staff'S Conclusion That a Power Uprate at Vermont Yankee in Vernon, VT Would Not Create a Significant Reduction in the Operational Safety Margin of the Plant
ML0606001158 February 2006Comment (58) of Quinn Kepes Opposing the Vermont Yankee Uprate Without an Independent Safety AssessmentChernobyl
ML0606001178 February 2006Comment (59) of Imre Kepes on the Vermont Yankee Power Uprate and a Need for an Independent Safety AnalysisChernobyl
ML06060012024 February 2006Comment (60) of Michael Nix, on P1774 Federal Registry Vol. 71, No. 7, Insist Upon Independent Safety Assessment Before a 20 Percent Uprate Is Allowed at Vernon, VT Nuclear Power Facility
ML06111035320 March 2006Comment (61) of Eli Kwartler Expressing Extreme Concern Regarding Decision by NRC to Approve Uprate at Vermont Yankee Reactor Without Requirement of Prior Independent Safety Assessment
ML06173039914 June 2006Comment (3) of Becca King on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06173041520 June 2006Comment (4) of Mike Hebert on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06173042019 June 2006Comment (5) of Tina Emery-Howe on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06173042714 June 2006Comment (6) of Jonathan Von Ranson Opposing the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06173043114 June 2006Comment (7) of Pam Walker on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06174003522 June 2006Comment (2) of Thomas Matsuda on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06174028914 June 2006Comment (62) of Thomas A. Wilson Opposing Expanding of High Level Radioactive Waste Storage
ML06174057223 June 2006Comment (9) of Jon Block, on Behalf of Citizens Awareness Network, on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal ApplicationHigh Radiation Area
Probabilistic Risk Assessment
Earthquake
ML06177005223 June 2006Comment (10) of William Sherman on Behalf of Vermont Department of Public Service on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06177005623 June 2006Comment (11) of Sally Shaw on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal ApplicationEarthquake
ML06177007123 June 2006Comment (12) of Sunny Miller on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application
ML06178008815 June 2006Comment (1) of Matthew Brock on Behalf of Massachusetts Attorney General Thomas F. Reilly, on the Proposed Scope of the Supplemental Generic Environmental Impact Statement (Supplemental GEIS) for the Renewal of the Vermont Yankee Nuclear PlTornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
Large early release frequency
License Renewal
Exemption Request
Earthquake
Chernobyl
Fuel cladding
Stolen
Backfit
Fatality
Affidavit
Depleted uranium
ML06184061223 June 2006Comment (16) of William Sherman on Behalf of the State of VT, Dept. of Public Service Regarding the Environmental Report for Vermont Yankee, License Renewal
ML06184061318 June 2006Comment (15) of Edward and Emma Stamas Regarding Vermont Yankee License Renewal
ML06184061418 June 2006Comment (14) of Cora Brooks Regarding Vermont Yankee License Renewal
ML0619204747 June 2006Comment (17) of E. Stamas on Environmental Scoping Process for Vermont Yankee Nuclear Power Station, License Renewal
ML06192047623 June 20062006/06/23-Comment (18) of Catherine Gjessing on Behalf of State of VT, Agency of Natural Resources on Vermont Yankee Nuclear Power Station License RenewalSafe Shutdown
Met Tower
ML0625500955 September 2006Comment (29) of Sylvia Field on Nrc'S Low-Level Radioactive Waste Program
ML07066004826 February 2006Comment (2) of Marcia Bourne Opposing the NRC Generic Environmental Impact Statement Regarding Vermont Yankee
ML0706600494 February 2007Comment (3) of Marion Leonard Opposed Vermont Yankee Nuclear Power Plant Staying Open
ML07066008112 February 2007Comment (1) of Emma Stamas Supporting Decommissioning of Vermont Yankee Nuclear Station
ML0706700941 February 2007Comment (8) of Jesse Anderson Re Vermont Yankee Environmental Survey
ML0706700962 February 2007Comment (9) of Jim Herrick Regarding Draft Report: Supplemental Environmental Impact Statement and GEIS, Presented in Brattleboro, VT on January 31, 2007
ML07067009816 February 2007Comment (10) of Pam Clark Opposing Environmental Impact Statement for Vermont Yankee Nuclear Power Station
ML07067009931 January 2007Comment (11) of George Iselin on Environmental Impact of Vermont Yankee License Extension to Year 2022
ML07067010118 January 2007Comment (12) of John Linville Opposing the Re-Licensing of Vermont Yankee
ML0706701052 February 2007Comment (13) of Ed Stamas Re Renewal of Vermont Yankee Facility
ML07067017331 January 2007Comment (4) of Bill Pearson Opposing the NRC Generic Environmental Impact Statement Regarding Vermont Yankee
ML07067017931 January 2007Comment (5) of Sherrill Hogen Opposing Environmental Impact Statement for Vermont Yankee Nuclear Power Station Because He Disagrees with the Measures NRC Uses to Evaluate Environmental Impacts
ML07067018631 January 2007Comment (6) of Amos Newton on Opposing Relicensing of Vermont Yankee (Feedback from 01/31/2007 NRC Public Meeting for Comments on Draft Environmental Impact Statement for Vermont Yankee)
ML0706701872 March 2007Comment (7) of Timothy L. Timmermann and Robert W. Varney on Vermont Yankee Dseis, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 30 Regarding Vermont Yankee Draft Report for Comment Ceq #20060521
ML0707301546 March 2007Comment (14) of Andrew L. Raddant on Behalf of the Department of Interior Regarding Renewal of License for Vermont Yankee Power PlantLicense Renewal
Power Uprate
ML0707301587 March 2007Comment (16) of Sunny Miller Opposed to License Renewal for Vermont Yankee Power Plant
ML0707301927 March 2007Comment (19) of Jessica Culliny, Opposing Relicensing of Vermont Yankee Plant, Waste Storage Facility Is at Capacity
ML0707301965 March 2007Comment (20) of Eleanor I. Gavin Re Environmental Impact of Vermont YankeeEnvironmental Justice
Fatality
ML0707302007 March 2007Comment (21) of Diane Curran on Draft Supplement 30 to Generic EIS for License Renewal of Nuclear Plants, Vermont Yankee
ML0707302047 March 2007Comment (22) of Sally Shaw, Re SEIS for ENVY Reactor, Petition to Halt License Renewal Process of Vermont Yankee While Petition for Rulemaking on Adequacy of Radiation Standards & Risk Factors in Geis Is Pending
ML07073020712 March 2007Comment (23) of Catherine Gjessing on Supplement 30 for VYNPSSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML0707901467 March 2007Comment (25) of Sarah Hofmann, on Draft Generic Environmental Impact Statement and Draft Environmental Impact Statement for License Renewal of Vermont Yankee Nuclear Power StationFitness for Duty
Fire Barrier
Coatings
Aging Management
Moisture barrier
License Renewal
Fuel cladding
Power Uprate
Affidavit
ML0707901606 March 2007Comment (24) of Daniel J. Marx Re Vermont Yankee: Draft GEIS
ML07079016513 March 2007Comment (26) of Eleanor I. Gavin, Opposing the NRC Generic Environmental Impact Statement Regarding Vermont YankeeEarthquake
Chernobyl