Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML16265A5056 October 2016Apr 1400, Acceptance of Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, KHNP Quality Assurance Program Description for the Apr 1400 Design Certification.
ML17058A44517 March 2017APR1400 Chapter 14, Phase 2 SER W/Ois Transmittal Letter to KHNP
ML17114A51824 April 2017Korea Hydro and Nuclear Power Co., Ltd - Submittal of Four Revised Technical Reports for APR1400Fukushima Dai-Ichi
ML17115A55425 April 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 403-8454 for the Question 06.01.01-1
ML17128A4198 May 2017Submittal of Korea Hydro & Nuclear Power Co., Ltd, Revised Response to RAI 403-8454 for the Question 06.01.01-3
ML17166A26922 February 2018APR1400 Chapter 2 Phase 4 - Section 2.5 - Letter to Korea Hydro and Nuclear Power Co., Ltd
ML17188A30421 May 2018APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Letter to KHNP
ML17188A31122 December 2017APR1400 Chapter 16 Phase 4 SER Letter to KHNP
ML17234A51522 August 2017Korea Hydro & Nuclear Power Co., Ltd - Submittal of Response to RAI 541-8724 Addressing Question 06.02.05-12
ML17235B29223 August 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 125-7975
ML17243A12425 January 2018Korea Hydro and Nuclear Power Co., Ltd, - Advanced Power Reactor 1400 Design Certification Application - Safety Evaluation with No Open Items for Section 19.4, Loss of Large Areas of the Plant Due to Explosions or Fire
ML17257A14618 September 2017Acknowledgement Letter for Korea Hydro and Nuclear Power Co. Ltd'S Response to Nuclear Regulatory Commission Inspection of Korea Hydro and Nuclear Power Co., Ltd., Report No. 05200046/2017-201 and Notice of Violation
ML17261A45815 September 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 301-8280 for Question 07.01-41
ML17261B28415 September 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8429 for the Question EIS ACC/SAMDA-4
ML17265A11823 March 2018Letter to KHNP for the Safety Evaluation Report for Topical Report APR1400-F-A-TR-1200A-P Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400.
ML17269A30419 March 2018Letter to KHNP for Transmittal of Phase 4 Chapter 15 Safety Evaluation Report Transient and Accident Analyses
ML17270A42528 September 2017NRC Response Letter to KHNP Response to RAI 19-87 and Status UpdateProbabilistic Risk Assessment
ML17271A34825 January 2018APR1400 P4 Chapter 19.3 Letter to KHNP
ML17276A03725 January 2018Transmittal Letter to KHNP for the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evaluation Report
ML17276B34022 December 2017APR1400 P4 Chapter 18 Letter to KHNP
ML17290B22517 October 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 38-7878 for the Question 07.05-1 (Rev.3)
ML17324B31422 December 2017APR1400 P4 Chapter 14.1-14.2 Letter to KHNP
ML17331A39627 November 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Response to RAI 555-9163
ML17331A39720 November 2017Korea Hydro & Nuclear Power Co, Ltd - Westinghouse Electric Company Application for Withholding Proprietary Information from Public Disclosure
ML17331B46827 November 2017Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 38-7878 for the Question 07.05-1 (Rev. 4)
ML17334A16122 December 2017APR1400 Chapter 4 Phase 4 Letter
ML17362A08128 December 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 481-8546 for Question 16-149 (Rev.3)
ML17362A10228 December 2017Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 418-8348 for Question 19-49 (Rev.2)
ML17362A15128 December 2017Korea Hydro & Nuclear Power Co., Ltd., Submittal of Revised Response to RAI 255-8285 for the Question 03.08.05-7 (Rev.4)
ML17362A54628 December 2017Korea Hydro & Nuclear Power Co., Ltd., Submittal of Revised Response to RAI 434-8352 for Question 19-92 (Rev.2)
ML17363A25629 December 2017Korea Hydro & Nuclear Power Co., Ltd., Submittal of Revised Response to RAI 541-8724 for the Question 06.02.05-12 (Rev.2)
ML17363A26829 December 2017Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 463-8570 for the Question 10.03-5
ML18002A5522 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Response to RAI Er 1-8428 for Question EIS ACC/SA-12
ML18002A5572 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Response to RAI Er 3-8655 for Question EA ACC/SAMDA-1
ML18002A5602 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Response to RAI Er 1-8429 for Questions EIS ACC/SAMDA-1, 2, 3, 6, and 8
ML18002A5672 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8428 for Question EIS ACC/SA-3
ML18002A5722 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8428 for Question EIS ACC/SA-15 (Rev.2)
ML18002A5752 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2)
ML18003B4133 January 2018Korea Hydro & Nuclear Power Co., Ltd. - Submittal of Response to RAI Er 1-8428 for Questions EIS ACC/SA-2 and SA-4
ML18011A77211 January 2018Submittal of Confirmation of the APR1400 DCA - Safety Evaluation with No Open Items for Chapter 14, Sections 14.1 - 14.2
ML18011A78711 January 2018Submittal of Confirmation of the APR1400 DCA - Safety Evaluation with No Open Items for Chapter 16
ML18011A80111 January 2018Korea Hydro & Nuclear Power Co, Ltd - Submittal of Confirmation of the APR1400 DCA - Safety Evaluation with No Open Items for Chapter 18
ML18011A82311 January 2018Korea Hydro & Nuclear Power Co., Ltd - Submittal of Confirmation of the APR1400 DCA - Safety Evaluation with No Open Items for Chapter 4
ML18011A83311 January 2018Submittal of Markup of the APR1400 DCA - Safety Evaluation with No Open Items for Topical Report APR1400-F-M-TR-13001, Revision 1
ML18012A62725 January 2018Chapter_9_Phase_4_Letter
ML18017A24319 March 2018Chapter_3_Phase_4_Letter
ML18018B37918 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Response to RAI Er 1-8428 for Questions EIS ACC/SA-6 and SA-9
ML18023A12722 January 2018Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 434-8352 for Question 19-92 (Rev.3)
ML18023B08223 January 2018Korea Hydro & Nuclear Power Co., Ltd. - Resolution Plan of PRA-Based SMA for APR1400 Design Certification
ML18025C05325 January 2018Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 417-8359 for Question 19-42 (Rev.3)