Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
ML08322046930 October 2008Renewed Facility Operating License, Technical Specification Bases, Revision 60
ML0833803373 December 2008November 2008 Exam 05000325, 324/2008302 - Final Ro/Sro Written Exam References
ML10124085920 April 2010Initial Exam 2010-301 Final SRO Written Exam
ML1015900743 May 2010Initial Exam 2010-301 Draft RO Written Exam
ML1015900783 May 2010Initial Exam 2010-301 Draft SRO Written Exam
ML12076A0626 March 2012Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report (Colr) and Revision to Technical Specification 2.1.1.2
ML12193A12310 July 2012G20120489/EDATS: OEDO-2012-0421 - David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant
ML12237A05314 August 2012Technical Specification Bases, Brunswick Steam Electric Plant, Unit 1 - Renewed Facility Operating License DPR-71, Revision 80
ML12312A0827 November 2012IR 05000325-12-004, 05000324-12-004; 07/01/12 - 09/30/12; Brunswick Steam Electric Plant, Units 1 & 2; Refueling and Other Outage Activities, Identification and Resolution of Problems
ML13032A18529 January 2013Initial Exam 2012-301 Draft RO Written Exam
ML13032A24529 January 2013Initial Exam 2012-301 Draft Administrative JPMs
ML13032A57129 January 2013Initial Exam 2012-301 Final Administrative JPMs
ML13037A5511 March 2013Issuance of Amendments Regarding Addition of Analytical Methodology TR to TS 5.6.5 and Revision to TS 2.1.1.2
ML13144A21523 October 2013G20120489 - David A. Lochbaum Ltr. 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant - Proposed Director'S Decision Under 10 CFR 2.206
ML13220A09022 November 2013Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies
ML13317A59220 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976
ML13339A58830 December 2013G20120489/OEDO-2012-0421 - Response LTR to Petitioner 2.206 - Redress Technical Specifications Deficiencies Regarding Irradiated Fuel at the Brunswick Steam Electric Plant
ML16257A4106 September 2016Request for License Amendment Regarding Core Flow Operating Range Expansion
ML17017A38527 January 2017Final SRO Written Exam - Delay Release 2 Years
ML17059D14610 March 2017Issuance of Amendments to Revise Technical Specification Section 2.1.1.2, Safety Limit Minimum Critical Power Ratio
ML17200A08718 July 2017NRR E-mail Capture - Acceptance Review of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules
ML17209A16828 July 2017NRR E-mail Capture - Corrected Title: Acceptance Review of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, (CAC Nos. MF9905 and 9906)
ML17263A60120 September 2017Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs
ML17263A6048 August 2017Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs
ML17317B0024 December 2017Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242)
ML18039A44413 April 2018Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2
ML18249A15413 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 15A, Operational Safety Analysis, Figures
ML18249A15913 August 2018Technical Requirements Manual, Revision 73
ML18250A00211 August 2016Technical Requirements Manual, Revision 70
ML18250A00311 August 2016Technical Requirements Manual, Revision 63
ML19209B6833 October 1979LER 79-070/03L-0:on 790921,potential Inaccuracy in Reactor Vessel Water Level Instrumentation Noted,Following Receipt of GE Svc Info Ltr 299.Plant Mods Written to Raise Initiation Setpoints & Operating Manual Revised
ML19210D32516 November 1979Forwards Outstanding sys-oriented Info in Response to Request for Addl Info Required for NRC Generic Rept on Bwrs. Plant-specific Nature of Info Requires Submittal by Util as Opposed to Owners Group
ML19259C2404 June 1979Monthly Operating Rept for May 1979
ML19269D39423 April 1979Responds to IE Bulletin 79-08 Re Events Relevant to BWRs Identified During Tmi.Investigative Team Has Been Established to Review Util'S Nuclear Plant Designs & Operating Procedures to Ensure Continued Safety
ML19274D37118 January 1979Requests Revision of Tech Specs Re Operability Requirements for Reactor Vessel Water Level Instrumentation Necessary for Maint & Mod Work During Refueling Outage in Progress.W/Encl Check for $4400 Class I Amend Fee
ML19274D65812 February 1979Requests Revision of Tech Specs Re Administrative Matters. Attachments W/Changes Encl
ML19275A92618 October 1979Forwards Commitment to Meet Requirements of NUREG-0578. Intends to Meet Requirements & Schedules Set Forth in NRC 790913 Ltr
ML19283B76815 March 1979Forwards Info Re Status of Fire Protection Mod Requested by NRC for Issuance of Reload License Amend for Startup. Provides Review of Mods That Will & Will Not Be Completed Prior to Startup & Modified Tech Spec Pages
ML19296D41731 December 1979Annual Operating Rept of Changes,Tests & Experiments 1979.
ML19322A06128 December 1978Mark I Containment Program Load Definition Rept. Provides Info to Define Hydrodynamic Loads Produced on Containment Sys of Domestic Mark I Plants During Locas,Safety/Relief Valve Discharges & Related Dynamic Events
ML19325D61819 October 1989Proposed Tech Specs Re Main Steam Line Radiation Monitor Setpoint Change Hydrogen Water Chemistry
ML19326D96331 July 1980Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Brunswick Steam Electric Plant,Unit 1.
ML19327B43523 October 1989Advises That Existing Alternate Rod Injection Sys Design Meets ATWS Rule Requirements,Per Util 890907 Commitment
ML19330A72331 July 1980Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Brunswick Steam Electric Plant,Unit 2.
ML19340C0465 November 1980Proposed Changes to Tech Specs Sections 3.0 & 4.0,providing one-time Extensions for Performing Insps,Surveillances & Tests to Electrical Power Sys,Reactivity Control Sys,Eccs & Instrumentation
ML19347E43422 April 1981Forwards Feasibility Studies on NUREG-0737,Item II.K.3.16, Reduction of Challenges & Failures of Relief Valves & Item II.K.3.18, Mod of Automatic Depressurization Sys Logic. Provides Util Position on Each Study
ML19352A1389 March 1981Forwards Suppl to 800916 Request for Revisions to Tech Specs Re post-accident Monitoring Instrumentation & Administrative Controls,Per Category a Lessons Learned Requirements.Info Provides Addl Clarifications W/O Changing Technical Content
ML20004F56311 June 1981Tech Specs Tables 2.2.1-1,3.3.1-1,3.3.1-2,4.3.1-1,3.3.2-1, 3.3.2-2,3.3.2-3,4.3.2-1,3.3.3-1,3.3.3-2,4.3.3-1,3.3.5.3-1, 4.3.5.3-1,3.3.6.1-1,3.3.6.1-2,4.3.6.1-1,for Unit 1 & 3.3.3-1,3.3.3-2 & 4.3.3-1 for Unit 2
ML20008G28530 June 1981Forwards Documentation & Commitments for Completion of Items in NUREG-0737, Clarification of TMI Action Plan Requirements. Includes Listing of Items to Be Completed by 810701 & Util Commitment & Position Re Items
ML20010E42331 July 1980Technical Evaluation Rept:Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals.