Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-2008-130, Supplement to 2007 Annual Radioactive Effluent Release Report30 May 2008Supplement to 2007 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
L-2014-044, Offsite Dose Calculation Manual for Gaseous and Liquid Effluents, Revision 2019 December 2013Offsite Dose Calculation Manual for Gaseous and Liquid Effluents, Revision 20Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
L-76-438, Letter Transmitting Supplemental Information Regarding ECCS Reevaluation After re-calculation Using Tech Spec Rated Power Level of 2200 Mwt30 December 1976Letter Transmitting Supplemental Information Regarding ECCS Reevaluation After re-calculation Using Tech Spec Rated Power Level of 2200 Mwt
ML06086007813 March 2006Attachment 3 Calculation PTN-BFJR-06-001 Phase 3 SDP for Turkey Point B AFW Pump FailureFitness for Duty
Mission time
Preliminary White Finding
ML18227B0153 January 1977Submit Revised ECCS Calculations Supplemental Information Performed Using Rated Power Level of 2200 Mwt to Improve Clarity
ML18227B7863 January 1978Letter Transmitting Procedure for Evaluation of Maximum Setpoint Overshoot Heat Input Transient & Supplement to July 1977 Report of Pressure Mitigating Systems, Transient Analysis Results
ML18227C9043 January 1977Letter Transmitting Copy of Revised ECCS Calculations Report Forwarded on 12/30/1976 with Several Revised Pages to Improve Clarity
ML18299A11712 October 2018Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary)Aging Management
Exemption Request
ML18299A11812 October 2018Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018Through-Wall Leak