Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
IR 05000322/198201112 July 1982Forwards IE Insp Rept 50-322/82-11
IR 05000322/19850248 July 1985Insp Rept 50-322/85-24 on 850516-0618.No Violation Noted. Major Areas Inspected:Isolation of RCS Pressure from Low Pressure Re ECCS Sys Outside Containment & Disablement of 4,160-volt Emergency Bus auto-transfer Capability
IR 05000322/198700515 May 1987Insp Rept 50-322/87-05 on 870216-0331.Violation Noted: Inadequate Mod Procedure for Work Performed on Bus 103 Discovered as Cause of 870318 Loss of Offsite Power Event. Weakness in Valve Locking Device Program Also Noted
ML19350E19915 June 1981Forwards Responses to NRC Generic Ltr 81-04 Re Loss of Ac Power.Includes Description of Transmission & Power Distribution Sys & Actions for Power Restoration
ML20005F2515 January 1990Shoreham Nuclear Power Station Defueled Sar.
ML20054K90715 June 1982IE Insp Rept 50-322/82-11 on 820511-14 & 17-20.Noncompliance Noted:Failure to Conduct Surveillance Tests of Battery Sys
ML20083R01920 April 1984Testimony of WE Gunther Re Steps Involved in Phases of Low Power Testing
ML20083R04220 April 1984Testimony of Wg Schiffmacher Re Util Capability to Provide Ac Power to Plant Under Variety of Operating Conditions. W/Two Oversize Drawings.Aperture Cards Are Available in PDR
ML20087H79220 March 1984Supplemental Motion for Low Power Ol.Unexecuted Affidavits of Ja Notaro,Wg Schiffmacher,Gg Sherwood,As Rao & EC Eckert Encl.Certificate of Svc Also Encl
ML20087M97522 March 1984Affidavit of Wg Schiffmacher in Support of 840320 Supplemental Motion for Low Power OL
ML20087M98330 March 1984Affidavit of Ja Notaro & WE Gunther in Support of 840320 Supplemental Motion for Low Power OL
ML20092H43722 June 1984Response to Util 840523 Request for Production of Documents. Certificate of Svc Encl.Related Correspondence
ML20093F34516 July 1984Supplemental Testimony of WE Gunther & Wg Schiffmacher Re Operating Procedures for Ac Power Sources
ML20096C46231 August 1984Proposed Finding of Fact Based on Evidence Presented on 840424-25 & 840730-0808 & ASLB 840724 Order Granting in Part & Denying in Part Util Motion for Summary Disposition on Phases I & II of Low Power Testing
ML20096C47131 August 1984Post-hearing Brief in Support of Application for Exemption Re Phases I-IV of Low Power Testing
ML20100J34025 February 1985Rev 12 to Procedure 23.307.01, Emergency Diesel Generators
ML20108B6914 March 1985Petition for Review of ALAB-800,reversing ASLB Disposition of Security Contention & Vacating Authorization for Phase III & IV Low Power Testing License.Affidavit of Jl Leonard & Certificate of Svc Encl
ML20117H92613 May 1985Affidavit of Ja Notaro & WE Gunther Re Steps Involved in Sys Testing During Phases I-IV
ML20127B55719 June 1985Response Opposing Suffolk County & State of Ny 850617 Motion for Stay of Low Power License.Motion Untimely & Fails to Satisfy Commission Stay Criteria.Unexecuted Affidavit of Jd Leonard & Certificates of Svc Encl
ML20128H18824 June 1985Affidavit of Jd Leonard Re Issuance of Low Power License. Certificate of Svc Encl
ML20148A48529 February 1988Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys
ML20149M58818 September 1987Errata to SALP Rept 50-322/86-99 for Mar 1986 - Jul 1987, Revising Page 38 & Table 5
ML20214U20231 January 1987Technical Rept 86.2SH Verification of IPE for Shoreham. W/ 870313 Release Memo
ML20244B44519 June 1985Forwards Response of Licensee to Motion for Stay of Low Power License,For Filing.W/Certificate of Svc
SNRC-1013, Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Encl Addresses Each NRC Position & Describes Actions Taken by Util in Response9 March 1984Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Encl Addresses Each NRC Position & Describes Actions Taken by Util in Response
SNRC-1026, Forwards Supplemental Motion for Low Power OL21 March 1984Forwards Supplemental Motion for Low Power OL
SNRC-1036, Provides Addl Response to NRC Questions Re Supplemental Motion for Low Power License.Actual Power Level & Time History of Startup Phase of Plant Difficult to Predict Due to Unplanned Shutdowns During Power Ascension Test Program11 April 1984Provides Addl Response to NRC Questions Re Supplemental Motion for Low Power License.Actual Power Level & Time History of Startup Phase of Plant Difficult to Predict Due to Unplanned Shutdowns During Power Ascension Test Program
SNRC-1047, Commits to Mobile Diesel Generator Changes Per Sser 5 Agreed Upon in Prior Telcon W/Nrc Re Fire Protection. Proposed Mods Meet NRC Conditions.Util Proceeding W/Changes Accordingly6 June 1984Commits to Mobile Diesel Generator Changes Per Sser 5 Agreed Upon in Prior Telcon W/Nrc Re Fire Protection. Proposed Mods Meet NRC Conditions.Util Proceeding W/Changes Accordingly
SNRC-1060, Advises That,Based on Results of Analyses,All Accident Success & Transient Criteria Satisfied W/Or W/O Qualified Onsite Power Source,In Response to 840516 Order28 June 1984Advises That,Based on Results of Analyses,All Accident Success & Transient Criteria Satisfied W/Or W/O Qualified Onsite Power Source,In Response to 840516 Order
SNRC-1078, Forwards Revs to FSAR Chapter 13, Conduct of Operations & Section 17.2, QA During Operations Phase, Reflecting Operational Readiness.Revs Will Be Included in Forthcoming Rev 33 to FSAR5 September 1984Forwards Revs to FSAR Chapter 13, Conduct of Operations & Section 17.2, QA During Operations Phase, Reflecting Operational Readiness.Revs Will Be Included in Forthcoming Rev 33 to FSAR
SNRC-1140, Discusses NRC Concerns Re Postulated Failure in Electrical Circuit Breaker 460 Between Reserve Station Svc Transformer & Bus 11 That Can Disable Both Alternate Ac Power Supplies. Util to Rack Down 4 Kv Breaker 46029 January 1985Discusses NRC Concerns Re Postulated Failure in Electrical Circuit Breaker 460 Between Reserve Station Svc Transformer & Bus 11 That Can Disable Both Alternate Ac Power Supplies. Util to Rack Down 4 Kv Breaker 460