Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNL-15-059, Response to NRC Request for Additional Information Regarding the Review Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink, Including Enclosures 1 and 2, Pp. 1 Through 20619 June 2015Response to NRC Request for Additional Information Regarding the Review Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink, Including Enclosures 1 and 2, Pp. 1 Through 206Ultimate heat sink
ML0210100849 April 2002Tvan Calculation Coversheet/Ccris Update
ML02134028430 April 2002Attachment 3-SNL Report Hydrogen Control Calculations for the Sequoyah PlantHydrostatic
ML03170002524 September 2002Attachment 3, SNL Final Report, Hydrogen Control Calculations for the Sequoyah Plant.Hydrostatic
ML03276066120 September 2003TVA Calculation 0-RE-90-102/103, Demonstrated Accuracy Calculation
ML0327606737 June 2000TVA Calculation 0-RE-90-125/126, Demonstrated Accuracy CalculationPost Accident Monitoring
ML0335102817 May 1998CRC Depletion CalculationsFuel cladding
ML04076021027 February 2004to Calculation SCG2S90088, Control Room Suspended Ceiling, Light Fixture, and Air Distribution Duct I(L) Supports.Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
ML0411007399 April 2004Swn Fire Hazards Analysis Calculation,Pages 15 and 16Hot Short
Safe Shutdown
ML04142021629 April 2004Email from SQN Responding to RAI Re 50.68 Exemption (MC1871/72)
ML06125027921 August 2005Enclosure 3, Offsite Dose Calculation Manual Revision 48, Sequoyah Nuclear PlantGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML07137032224 November 2006Enclosure 3, Offsite Dose Calculation Manual, Revision 51Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML08129007228 April 2008ISFSI, Offsite Dose Calculation Manual, Revision 52Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML09231065911 August 2009Calculation No. B00000000-01717-0210-00006, Rev. 00, CRC Reactivity Calculations for Sequoyah Unit 2, Attachment I, Page 1 Through 333Fuel cladding
ML09231067211 August 2009Calculation No. B00000000-01717-0210-00006, Rev. 00, CRC Reactivity Calculations for Sequoyah Unit 2, Attachment I, Page 334 of 656 Through Attachment VI
ML10124091217 February 2009Offsite Dose Calculation Manual, Revision 55Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML11126A19410 September 2010Offsite Dose Calculation Manual, Revision 56Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
ML13126A17324 May 2012Offsite Dose Calculation Manual, Revisions 57 and 58Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change