Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
ML0307605507 June 2002DBD-01, Auxiliary Feedwater System Design Basis Document, Revision 2, Section 3.4.1 - Attachment B, Page B-2Westinghouse Electric CorpOffice of Nuclear Reactor Regulation
ML03077053819 September 2002DBD-101, Rev. 3, Auxiliary Feedwater System Design Basis Document, Section 3.7 - Attachment BWe EnergiesOffice of Nuclear Reactor Regulation
ML16251A1611 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power ConversionPoint BeachOffice of Nuclear Reactor Regulation
ML20148K60523 March 1988Responds to Generic Ltr 88-03.Requirement for Once Per Shift Check of Auxiliary Feedwater (AFW) Piping Temps Committed to in IE Bulletin 85-001 Confirmed.Removal of Lagging from AFW Piping Per IE Info Notice 84-06 NotedFay C
WEC Energy Group
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
ML20151M13812 April 1988Responds to Util Reaffirming Commitment to Check Auxiliary Feedwater Piping Temp Once Per Shift,Per Generic Ltr 88-03.Commitments Acceptable.Generic Issue 93 Considered ResolvedOffice of Nuclear Reactor Regulation
Wagner D
Fay C
WEC Energy Group
ML21102A3582 April 2021Update to Final Safety Analysis Report, Chapter 10, Steam and Power ConversionPoint BeachOffice of Nuclear Reactor Regulation
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power ConversionPoint BeachOffice of Nuclear Reactor Regulation
NRC Generic Letter 1988-0317 February 1988NRC Generic Letter 1988-003: Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1990-0425 April 1990NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective ActionsPartlow J
Office of Nuclear Reactor Regulation