Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
IR 05000255/200600913 February 2007IR 05000255-06-009, on 11/13/2006 - 12/15/2006, Palisades, Component Design Basis InspectionAnn Marie Stone
NRC/RGN-III/DRS/EB2
Harden P
Nuclear Management Co
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor VesselCrutchfield D
Office of Nuclear Reactor Regulation
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve5 February 1996Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate ValveCrutchfield D
Office of Nuclear Reactor Regulation
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping20 August 1996Thermally Induced Pressurization of Nuclear Power Facility PipingMartin T
Office of Nuclear Reactor Regulation
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout InspectionsMartin T
Office of Nuclear Reactor Regulation
ML02197013231 July 2002NUREG/CP-0152, Vol. 4, (4:4) Page 3C-29 - End, Proceedings of Seventh Nrc/Asme Symposium on Valve & Pump Testing Held at Renaissance Washington, DC Hotel Washington, DC, July 15-18, 2002.Thomas Scarbrough
Consumers Energy
Office of Nuclear Reactor Regulation
Robinson M
Division of Engineering
Sagmoe R
K & M Consulting
ML18065A17313 October 1995Provides 60-day Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves.Consumers Energy
Smedley R
Office of Information Resources Management
ML18065A22225 October 1995Revises Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves.Consumers Energy
Smedley R
Office of Information Resources Management
ML18065A49613 February 1996Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves.Consumers Energy
Smedley R
Office of Information Resources Management
ML18065A5251 March 1996Forwards Corrected Notarized Statement Attesting to Correctness & Completeness of Contents of Response to GL 95-07Consumers Energy
Smedley R
Office of Information Resources Management
ML18065A6193 April 1996Comments of GL 95-07,in Response to NRC Request for Info on Estimated Time for Collecting Info on Issue of Power Operated Gate Valves & Susceptibility to Pressure Locking/ Thermal BindingConsumers Energy
Smedley R
Office of Information Resources Management
ML18065A82622 July 1996Forwards Response to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves.Consumers Energy
Smedley R
Office of Information Resources Management
ML18065B16923 February 1998Forwards Supplemental Info Requested by NRC to Support Plant SER for GL 95-07, Pressure Locking & Thermal Binding of Power-Operated Gate Valves.Consumers Energy
Bordine T
Office of Information Resources Management
ML18067A6201 July 1997Forwards Description of Change in Commitments Made in 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves.Bordine T
CMS ENERGY CORP.
Office of Information Resources Management
ML21125A32714 April 20215 to Updated Final Safety Analysis Report, Chapter 4, Primary Coolant System, SectionsEntergyOffice of Nuclear Reactor Regulation
NRC Generic Letter 1995-0717 August 1995NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate ValvesCrutchfield D
Office of Nuclear Reactor Regulation