Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Entered dateEvent description
ENS 416819 May 2005 20:03:00

Emergency Category: Primary Coolant System Integrity Appears leak has been isolated. The plant was performing a SI (Safety Injection) accumulator bottle sampling test. At the conclusion of the test, a valve failed to close which caused excessive pressure in a line. When the pressure source was isolated, thermal expansion occurred which pushed some fluid through the Primary Coolant System check valves into the primary coolant system. When the system was depressurized to relieve the pressure, the primary coolant check valve failed to reseat. As a result, approximately 90 gals of primary coolant back flowed through the primary check valve over a two minute period. The leakage was stopped when the line was isolated remotely from the control room. The plant is still in the unusual event. The exit criteria is a tech spec leak rate calculation to verify that primary coolant leakage is less than the tech spec allowed value which will take approximately three hours to complete. The licensee will be notifying the NRC Resident Inspector.

  • * * UPDATE P. RHODES TO J. KNOKE ON 05/10/05 AT 00:15 EDT * * *

At 00:11 EDT on 05/10/05 the licensee terminated their Unusual Event for Primary Coolant System integrity. The present leak rate is 0.018 gal/min, which is within the allowable Technical Specification limit of <1 gal/min for unidentified primary coolant leakage. There is an LCO (72 hrs) for the primary coolant system check valve that improperly reseated (CK-ES-3131). The licensee notified the NRC Resident Inspector. Notified R3DO (Riemer), NRR EO (Gillespie), IRD Manager (McGinty), DHS (A. Akers) and FEMA (K. Biscoe).