Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
DCL-02-098, Special Report 02-02 - Results of Steam Generator Inspections for Eleventh Refueling Outage22 August 2002Special Report 02-02 - Results of Steam Generator Inspections for Eleventh Refueling Outage
DCL-03-008, Response to NRC Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.31 January 2003Response to NRC Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.
DCL-03-026, Emergency Request for Approval to Use an Alternative Method of Determining Probability of Detection for Steam Generator 4 Tube R44C45 Indication3 March 2003Emergency Request for Approval to Use an Alternative Method of Determining Probability of Detection for Steam Generator 4 Tube R44C45 Indication
DCL-03-139, PG&E Response to NRC Questions on 2R11 Steam Generator Tube Inspections31 October 2003PG&E Response to NRC Questions on 2R11 Steam Generator Tube Inspections
DCL-03-151, 90-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity18 November 200390-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity
DCL-03-183, License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, Steam Generator (SG Tube Surveillance Program, and 5.6.10, SG Tube Inspection Report, for 4-Volt Alternate Repair Criteria for SG Tube Repair7 January 2004License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, Steam Generator (SG Tube Surveillance Program, and 5.6.10, SG Tube Inspection Report, for 4-Volt Alternate Repair Criteria for SG Tube Repair
DCL-04-028, License Amendment Request 04-01, Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method18 March 2004License Amendment Request 04-01, Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method
DCL-06-029, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage24 February 2006Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage
DCL-06-061, License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449)30 May 2006License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449)
DCL-06-129, Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage17 November 2006Special Report 06-03 - 180 Day Report for Steam Generator Technical Specification Task Force 449, Thirteenth Refueling Outage
DCL-06-130, Response to NRC Request for Additional Information Regarding License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449)22 November 2006Response to NRC Request for Additional Information Regarding License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449)
DCL-07-003, Response to NRC Request for Additional Information Regarding License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449).11 January 2007Response to NRC Request for Additional Information Regarding License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449).
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)15 October 2007License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)
DCL-07-106, 180-Day Steam Generator Report, Fourteenth Refueling Outage26 November 2007180-Day Steam Generator Report, Fourteenth Refueling Outage
DCL-08-106, Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank16 December 2008Response to NRC RAI Regarding License Amendment Request 08-02, Revision to Technical Specifications 3.7.5, 'Auxiliary Feedwater System,' and 3.7.6, 'Condensate Storage Tank and Fire Water Storage Tank
DCL-10-073, Response to NRC Request for Additional Information on License Renewal Application7 July 2010Response to NRC Request for Additional Information on License Renewal Application
DCL-13-046, Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test...29 April 2013Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test...
DCL-13-092, Technical Specification Bases, Revision 816 September 2013Technical Specification Bases, Revision 8
DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)28 July 2014License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)
DCL-15-059, Technical Specification Bases, Revision 95 May 2015Technical Specification Bases, Revision 9
DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 817 June 2015Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8
DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 817 June 2015License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8
DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.1 February 2016Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.
DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.15 September 2016Supplement to License Amendment Request 15-03, Application of Alternative Source Term.
DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 59 November 2016Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5
DCL-16-126, Revision 10 to Technical Specification Bases30 December 2016Revision 10 to Technical Specification Bases
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 15, Accident Analyses31 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 15, Accident Analyses
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System31 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System
DCL-18-070, Technical Specification Bases, Revision 1111 September 2018Technical Specification Bases, Revision 11
DCL-20-076, Technical Specification Bases10 September 2020Technical Specification Bases
DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition3 December 2020License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition
DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections10 March 2022License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections
IR 05000275/20020031 August 2002IR 05000275-02-003, IR 05000323-02-003, on 04/07/2002 to 07/06/2002, Pacific Gas and Electric. Co., Diablo Canyon Units 1 & 2, Postmaintenance Test, Access to Rad Sig Areas
IR 05000275/200500631 March 2005IR 05000275-05-006; IR 05000323-05-006; January 3 Through February 15, 2005; Diablo Canyon Nuclear Power Plant, Units 1 and 2: Temporary Instruction 2515/158, Functional Review of Low Margin/Risk Significant Components and Operator Actions
IR 05000275/201900110 May 2019NRC Integrated Inspection Report 05000275/2019001 and 05000323/2019001
IR 05000275/20210033 November 2021Integrated Inspection Report 05000275/2021003 and 05000323/2021003
IR 05000323/20030098 May 2003IR 05000323-03-009; Pacific Gas and Electric Company; 02/17-28/2003; Diablo Canyon Nuclear Power Plant, Unit 2; Special Inspection of Steam Generator Tubes
ML0212302711 May 2002Amendment Nos 152 & 152 Alternate Repair Criteria for Axial Primary Water Stress Corrosion Cracking at Dented Inspections in Steam Generators Tubing
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
ML0419000247 July 2004Summary of Conference Call Regarding the Spring 2004 Steam Generator Tube Inservice Inspection
ML05089044731 March 2005Initial Exam-02/2005 Final Written Reference Exam
ML0609406977 February 200502-2005-Draft Operating Exam
ML0609406987 February 200502-2005-Final Operating Exam
ML07019009411 January 2007License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement
ML08241026230 October 2008Issuance of Amendment Nos. 200 and 201, Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b)
ML10201008424 January 2011Issuance of Amendment Nos. 209 and 211, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Operability Requirements and Actions
ML13192A35412 September 2013Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409)
ML14209B07528 July 2014License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294). Part 1
ML14251A0448 August 201408 Final Written Exam
ML14279A07920 June 201408 Draft Operating Test