Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000004/2013012 | 26 April 2012 | IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures |
IR 05000413/1986032 | 9 September 1986 | Insp Repts 50-413/86-32 & 50-414/86-35 on 860811-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry |
IR 05000413/1988008 | 8 March 1988 | Insp Repts 50-413/88-08 & 50-414/88-08 on 880126-0225. Violations Noted.Major Areas Inspected:Surveillance Observation,Maint,Review of Licensee Nonroutine Event Repts & Followup of Previously Identified Items |
IR 05000413/1988009 | 26 May 1988 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/88-09 & 50-414/88-09.Disagrees W/Util Assessment That Measures Were Adequate to Control Eddy Current Testing of Tubes |
IR 05000413/1988012 | 4 April 1988 | Insp Repts 50-413/88-12 & 50-414/88-12 on 880222-26. Violation Noted.Major Areas Inspected:Radiation Protection Area of Unit 2 Outage,Including Audits,Surveillances, Planning,Preparation,Training,Qualification & IE Notices |
IR 05000413/1988032 | 12 September 1988 | Insp Repts 50-413/88-32 & 50-414/88-32 on 880815-19.No Violations Noted.Major Areas Inspected:Steam Generator Tube Leak,Integral Simulation Test of Pumps & Valves,Temporary Instruction & Action on Previous Insp Findings |
IR 05000413/1989018 | 11 August 1989 | Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items |
IR 05000413/1992027 | 23 November 1992 | Insp Repts 50-413/92-27 & 50-414/92-27 on 921011-1107.No Violations Noted.Major Areas Inspected:Plant Operations & Standy Makeup Pump Operability Verification & Review |
IR 05000413/1993020 | 17 November 1993 | Discusses SALP Insp Repts 50-413/93-20 & 50-414/93-20 on 920503-931002.Informs That Overall Performance at Plant Improved Since Previous Assessment |
IR 05000413/2001006 | 15 January 2002 | IR 05000413/2001-006 & IR 05000414/2001-006, Catawba Nuclear Station, Quarterly Integrated Resident Inspection on 09/23-12/22/2001. No Violations Noted |
IR 05000413/2003002 | 28 April 2003 | IR 05000413-03-002, IR 05000414-03-002, on 12/29/2002-3/29/2003; Duke Energy Corporation; Catawba Nuclear Station, Units 1 and 2; Other Activities and Investigations Report 2-2002-021 |
IR 05000413/2003005 | 16 January 2004 | IR 05000413-03-005 & 05000414-03-005, on 09/28/03 Through 12/20/03, for Catawba Nuclear Station; Maintenance Effectiveness, Post-Maintenance & Surveillance Testing & Other Activities |
IR 05000413/2004006 | 27 January 2005 | IR 05000413-04-006 and IR 05000414-04-006 on 09/19 - 12/31/04 for Catawba Nuclear Station, Units 1 & 2; Event Followup and Other Activities |
IR 05000413/2005003 | 28 July 2005 | IR 05000413-05-003, IR 05000414-05-003, IR 0720045-05-001; 4/1/2005 - 6/30/2005; Catawba Nuclear Station, Units 1 and 2; Operability Evaluations |
IR 05000413/2006003 | 28 July 2006 | IR 05000413-06-003, 05000414-06-003; 4/1/2006 - 6/30/2006; Catawba Nuclear Station, Units 1 and 2; Event Followup |
IR 05000413/2007005 | 31 January 2008 | IR 05000413-07-005, 05000414-07-005 on 10/01/2007 - 12/31/2007 for Catawba, Units 1 and 2; Inservice Inspection Activities, Maintenance Risk Assessments, Permanent Plant Modifications, and Post-Maintenance Testing |
IR 05000413/2008003 | 30 July 2008 | IR 05000413-08-003, 05000414-08-003, on 4/1/2008 - 6/30/2008, Catawba Nuclear Station, Units 1 and 2, Integrated Inspection Report |
IR 05000413/2009002 | 28 April 2009 | IR 05000413-09-002, 05000414-09-002, on 01/01/2009 - 03/31/2008, Catawba Nuclear Station, Units 1 and 2; Design Control Integrated Inspection |
IR 05000413/2009005 | 28 January 2010 | IR 05000413-09-005, 05000414-09-005; 10/1/2009 - 12/31/2009; Catawba Nuclear Station, Units 1 and 2; Mitigating Systems |
IR 05000413/2010002 | 28 April 2010 | IR 05000413-10-002, 05000414-10-002, on 1/1/2010 - 3/31/2010, Catawba Nuclear Station, Units 1 and 2, Routine Integrated Report |
IR 05000413/2010005 | 28 January 2011 | IR 05000413-10-005, 05000414-10-005; 10/1/2010 - 12/31/2010; Catawba Nuclear Station, Units 1 and 2; Licensed Operator Requalification, Radiological Hazard Assessment and Exposure Controls, and Radiation Monitoring Instrumentation |
IR 05000413/2011003 | 27 July 2011 | IR 05000413-11-003, 05000414-11-003; 4/1/2011 - 6/30/2011; Catawba Nuclear Station, Units 1 and 2; Fire Protection, Maintenance Effectiveness |
IR 05000413/2012002 | 26 April 2012 | IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures |
IR 05000413/2013002 | 25 April 2013 | IR 05000413-13-002 & 05000414-13-002, 01/01/2013 - 03/31/2013, Catawba Nuclear Station Units 1 and 2, NRC Integrated Inspection Report |
IR 05000413/2014003 | 1 August 2014 | IR 05000413-14-003, 05000414-14-003; on 4/1/2014 - 6/30/2014; Catawba Nuclear Station, Units 1 and 2, Integrated Inspection Report |
IR 05000413/2016003 | 16 February 2017 | Errata for Catawba Nuclear Station - NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion |
IR 05000413/2021002 | 5 August 2021 | Integrated Inspection Report 05000413/2021002 and 05000414/2021002 |
IR 05000413/2023002 | 25 July 2023 | Integrated Inspection Report 05000413/2023002 and 05000414/2023002 |
IR 05000414/2009003 | 28 July 2009 | IR 05000413-9-003 & 05000414-09-003 on 04/01/09 - 06/30/08 for Catawba, Units 1 & 2 |
ML022270652 | 14 August 2002 | Chapter 3 Draft SER with Open Items, Aging Management Review Results |
ML030730632 | 3 March 2003 | Duke Power Co 20-Day Response to NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors |
ML032880456 | 9 October 2003 | Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.6.6 Containment Spray System (CSS) |
ML032890405 | 1 October 2003 | Response to Request for Additional Information Regarding the Use of Mixed Oxide Fuel Lead Assemblies |
ML032901137 | 15 October 2003 | Duke Energy Corp, Catawba, Unit 1, Proposed Technical Specification Amendment (Ts), TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.6.6, Containment Spray System |
ML032940517 | 15 October 2003 | Proposed Technical Specifications (TS) Amendment TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation TS 3.6.6, Containment Spray System |
ML040230335 | 15 January 2004 | December 2003 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations |
ML041410304 | 13 May 2004 | April 2004 Monthly Operating Report for Oconee, McGuire and Catawba Nuclear Power Plants |
ML041420128 | 4 May 2004 | Steam Generator Outage Summary Report for End of Cycle 14 Refueling Outage |
ML043280410 | 15 November 2004 | October 2004 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, & Catawba Nuclear Station |
ML080520175 | 20 March 2008 | Request to Relax Nondestructive Examination of Reactor Pressure Vessel Head Penetration Nozzles in First Revised Order EA-03-009 |
ML091380251 | 24 March 2009 | EOC 16 Stream Generator Inspection Results NRC Update - March 24, 2009 |
ML12054A692 | 12 March 2012 | Issuance of Amendment Nos. 267 and 263, Revise Technical Specifications for Permanent Alternate Repair Criteria for Steam Generator Tubes |
ML12334A364 | 29 November 2012 | Notification of Inspection and Request for Inspection |
ML13071A632 | 21 February 2010 | Monthly Operating Reports Data |
ML13176A400 | 8 July 2013 | Proposed Relief Request 13-CN-001, Use of Alternate Depth Sizing Criteria |
ML15286A326 | 26 October 2015 | Proposed Relief Request 14-CN-003, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Code Case N-695 |
ML16120A087 | 27 April 2016 | Notification of Inspection and Request for Information |
ML16307A004 | 2 November 2016 | NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion |
ML19128A326 | 20 June 2019 | Alternative to Depth Sizing Qualification Examination of Welds |
ML19148A636 | 28 May 2019 | Notification of Inspection and Request for Information |