Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
IR 05000483/199001328 August 1990Insp Rept 50-483/90-13 on 900701-0815.Violations Noted. Major Areas Inspected:Lers,Followup on Previous Insp Findings,Followup on Generic Ltrs,Plant Operations,Maint/ Surveillance & Regional RequestsNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Hague R
ML20076H39911 October 1994Discusses Resolution of GSI 93, Steam Binding of Auxiliary Feedwater Pumps. Commitment Exceeded Recommendations of Bulletin 85-001 & GL 88-03Ameren
Schnell D
Office of Information Resources Management
ML20082M61631 August 1991Auxiliary Feedwater System RISK-BASED Inspection Guide for the Callaway Nuclear Power PlantBattelle Memorial Institute
Vo T
Gore B
Moffitt N
PACIFIC NORTHWEST NATION
Office of Nuclear Reactor Regulation
ML20151B9168 July 1988Advises That 880512 Response to Generic Ltr 88-03, Steam Binding of Auxiliary Feedwater Pumps, SatisfactoryAlexion T
Office of Nuclear Reactor Regulation
Ameren
Schnell D
ML20154G13112 May 1988Responds to Generic Ltr 88-03 Re Resolution of Generic Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Probability for Steam Binding of Auxiliary Feedwater Pumps & Subsequent Disabling of Sys Very LowAmeren
Schnell D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
ML20247L57624 May 1989Forwards Response to 890407 Backfitting Questionnaire.Most Significant Weaknesses in Backfit Process Include Identification Process & cost-benefit Analysis.List of plant-specific Implementation Costs Also EnclAmeren
Schnell D
Office of Information Resources Management
NRC Generic Letter 1988-0317 February 1988NRC Generic Letter 1988-003: Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1990-0425 April 1990NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective ActionsPartlow J
Office of Nuclear Reactor Regulation