Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
BSEP-95-0485, Forwards Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept & ...Usi A-46 Seismic Evaluation Rept15 September 1995Carolina Power & Light Co.
Campbell W
Forwards Brunswick Nuclear Plant Units 1 & 2 USI A-46 Relay Evaluation Rept & ...Usi A-46 Seismic Evaluation ReptOther
BSEP-96-0292, Forwards Written Response to 960516 RAI Re GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-4615 August 1996Carolina Power & Light Co.
Levis W
Forwards Written Response to 960516 RAI Re GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46Other
BSEP-97-0140, Informs That Util Will Provide Written Responses to RAI Re Seismic Qualification of Mechanical & Electrical Equipment by 9706179 April 1997Carolina Power & Light Co.
Jury K
Informs That Util Will Provide Written Responses to RAI Re Seismic Qualification of Mechanical & Electrical Equipment by 970617Response to RAI
BSEP-97-0261, Forwards Response to 970312 RAI to Support Staff Review of plant-specific Summary Rept on Resolution of USI A-46 Program for BSEP Units 1 & 217 June 1997Carolina Power & Light Co.
Hinnant C
Forwards Response to 970312 RAI to Support Staff Review of plant-specific Summary Rept on Resolution of USI A-46 Program for BSEP Units 1 & 2Other
BSEP-98-0145, Informs That Util Completed Final Outlier Resolutions for Bsep,Units 1 & 2,in Response to GL 87-02 Re USI A-46.Outlier Resolutions Are Documented in Encl Partial Calculations 1SEIS-0028 & 2SEIS-002811 September 1998Carolina Power & Light Co.
Keenan J
Informs That Util Completed Final Outlier Resolutions for Bsep,Units 1 & 2,in Response to GL 87-02 Re USI A-46.Outlier Resolutions Are Documented in Encl Partial Calculations 1SEIS-0028 & 2SEIS-0028Other
ML20135F80812 March 1997NRC (Affiliation Not Assigned)
Trimble D
Forwards RAI Re Seismic Qualification of Mechanical & Electrical Equipment at Plant,Units 1 & 2RAI
ML20198E49923 November 1992Office of Nuclear Reactor Regulation
Lo R
Forwards SE Accepting Licensee 120-day Response to Suppl 1 to GL 87-02Approval
ML20210N2045 August 1999NRC (Affiliation Not Assigned)
Hansen A
Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1Approval