Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20080G85414 September 1983Duquesne Light Company
Carey J
Advises That Actions Required by 830708 Generic Ltr 83-28, Items 2.2.2,4.2.3,4.2.4 & 4.3 Re Reactor Trip Breakers Currently Being Reviewed.Response Will Be Provided Upon CompletionOther
ML20086A8404 November 1983Duquesne Light Company
Carey J
Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events.' Proprietary List Rules Will Be Forwarded SeparatelyOther
ML20138H21830 September 1985INC.
EG&G IDAHO
Haroldsen R
Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2Other
ML20138S05331 October 1985Varga S
Office of Nuclear Reactor Regulation
Forwards SER Re Util 831104 Response to Generic Ltr 83-28 Concerning Items 3.1.3 & 3.2.3, Post-Maint Testing. Response AcceptableApproval