Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateSiteTitleDescription
IR 05000261/200600530 January 2007RobinsonIR 05000261-06-005, on 10/01/2006 - 12/31/2006, Carolina Power and Light Company; H. B. Robinson Steam Electric Plant, Unit 2; Maintenance Effectiveness and Other
IR 05000261/200700220 April 2007RobinsonIR 05000261-07-002, on 01/01/2007-03/31/2007; Carolina Power and Light Company; H.B. Robinson Steam Electric Plant, Unit 2; Emergency Preparedness
IR 05000261/200700327 July 2007RobinsonIR 05000261-07-003, Carolina Power and Light Company; on 04/01/2007-06/30/2007; H.B. Robinson Steam Electric Plant, Unit 2
IR 05000261/200700429 October 2007RobinsonIR 05000261-07-004; on 07/01/2007 - 09/30/2007; H.B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection Report
IR 05000261/200700525 January 2008RobinsonIR 05000261-07-005, on 10/01/2007 to 12/31/2007, H. B. Robinson Steam Electric Plant, Unit 2, Maintenance Effectiveness
IR 05000261/200800225 April 2008RobinsonIR 05000261-08-002 on 01/01 - 03/31/08 for H.B. Robinson, Unit 2, Maintenance Rick Assessment, Problem Identification & Resolution
IR 05000261/200800321 July 2008RobinsonIR 05000261-08-003, Carolina Power and Light Company, on 4/1/2008-6/30/2008; H.B. Robinson Steam Electric Plant, Unit 2, Maintenance Risk Assessments and Emergent Work Control, Problem Identification and Resolution
IR 05000261/200800424 October 2008RobinsonIR 05000261-08-004 on 07/01/2008 - 09/30/2008 for H.B. Robinson, Unit 2
IR 05000261/200800527 January 2009RobinsonIR 05000261-08-005, on 10/01/2008 - 12/31/2008, H.B. Robinson Steam Electric Plant, Unit 2, Routine Integrated Report
IR 05000261/200900329 July 2009RobinsonIR 05000261-09-003, on 4/1/2009-6/30/2009; H.B. Robinson Steam Electric Plant, Unit 2; Operability Evaluations, Identification and Resolution of Problems
IR 05000261/200900429 October 2009RobinsonIR 05000261-09-004, on July 1, 2009 - September 30, 2009, H.B. Robinson Steam Electric Plant - NRC Integrated Inspection Report
IR 05000261/200900528 January 2010RobinsonIR 05000261-09-005 on 10/01/09 - 12/31/09 for H.B. Robinson, Operability Evaluations
IR 05000261/201000230 April 2010RobinsonIR 05000261-10-002; 01/01/2010 - 03/31/2010; Carolina Power and Light Company; H.B. Robinson Steam Electric Plant, Unit 1; Flood Protection, Operability Evaluations
IR 05000261/201000328 July 2010RobinsonIR 05000261-10-003, on 04/01/2010 - 06/30/2010, Carolina Power and Light Company, H. B. Robinson Steam Electric Plant, Unit 2, Identification and Resolution of Problems
IR 05000261/201000412 November 2010RobinsonIR 05000261-10-004 & 05000261-10-501, on 07/01/10 - 09/30/10; Carolina Power & Light Co.; H.B. Robinson, Unit 2; Post Maintenance Testing, Licensed Operator Requalification, & Event Follow-up, Inspection Report with Assessment Letter
IR 05000261/201000528 January 2011RobinsonIR 05000261-10-005; Carolina Power and Light Comapny; 10/01/2010 - 12/31/2010; H. B. Robinson Steam Electric Plant, NRC Integrated Inspection Report and Exercise of Enforcement Discretion
IR 05000261/20100068 October 2010RobinsonNRC Problem Identification and Resolution Inspection Report 05000261-10-006; Preliminary White Fining and Potential Escalated Enforcement Violations
IR 05000261/201100227 April 2011RobinsonIR 05000261-11-002, Carolina Power and Light Company; on 01/01/2011 - 03/31/2011; H.B. Robinson Steam Electric Plant, Unit 2; Licensed Operator Requalification; Operability Evaluations
IR 05000261/201100327 July 2011RobinsonIR 05000261-11-003, on 04/01/2011 - 06/30/2011, H.B. Robinson Steam Electric Plant, Unit 2, Operability Determinations
IR 05000261/201100414 November 2011RobinsonIR 05000261-11-004, 05000261-11-502, on 07/01/2011 - 09/30/2011, H.B. Robinson Steam Electric Plant, Unit 2, Adverse Weather Protection and Operability Evaluations
IR 05000261/201100526 January 2012RobinsonIR 05000261-11-005; Carolina Power and Light Company; 10/01/2011 - 12/31/2011; H. B. Robinson Steam Electric Plant; NRC Integrated Inspection Report
IR 05000261/201100919 April 2011RobinsonIR 05000261-11-009; 3/21/2011 - 3/25/2011; H.B. Robinson Steam Electric Plant, Unit 2; Supplemental Inspection for a White Performance Indicator (PI)
IR 05000261/201101113 May 2011RobinsonNRC Temporary Instruction 2515/183 Inspection Report 05000261/2011011
IR 05000261/201200230 April 2012RobinsonIR 05000261-12-002, Carolina Power and Light Company, on 01/01/2012-03/31/2012, H.B. Robinson Steam Electric Plant, Unit 2, Operability Evaluations, Refueling and Outage Activities
IR 05000261/201200330 July 2012RobinsonIR 05000261-12-003 and 05000261-12-502, Carolina Power and Light Company; on 4/01/2012-6/30/2012; H.B. Robinson Steam Electric Plant, Unit 2; Maintenance Effectiveness, Performance Indicator Verification
IR 05000261/201200430 October 2012RobinsonIR 05000261-12-004, on 07/01/2012 - 09/30/2012, H.B. Robinson Steam Electric Plant, Unit 2, Maintenance Effectiveness
IR 05000261/20120056 February 2013RobinsonIR 05000261-12-005, Carolina Power and Light Company; on 10/01/2012 - 12/31/2012; H.B. Robinson Steam Electric Plant, Unit 2; Other Activities
IR 05000261/201300222 April 2013RobinsonIR 05000261-13-002, on 01/01/2013 - 03/31/2013, H.B. Robinson Steam Electric Plant, Unit 2, Integrated Report
IR 05000261/20180018 May 2018RobinsonNuclear Regulatory Commission Integrated Inspection Report 05000261/2018001
IR 05000324/200700519 March 2008BrunswickIR 05000325-07-005, 05000324-07-005; on 10/01/07 - 12/31/07; Brunswick Steam Electric Plant, Units 1 and 2
IR 05000324/200701116 November 2007BrunswickIR 05000325-07-011, 05000324-07-011, on 08/02/2007 - 11/09/2007, Brunswick Steam Electric Plant, Units 1 and 2; Special Inspection
IR 05000324/200800225 April 2008BrunswickIR 05000325-08-002, 05000324-08-002 on 01/01/2008 - 03/31/2008 for Brunswick, Units 1 & 2
IR 05000324/200801012 December 2008BrunswickIR 05000325-08-010, 05000324-08-010, on 09/08/2008 - 11/13/2008 for Brunswick, Units 1 and 2
IR 05000324/201100830 June 2011BrunswickIR 050000325-11-008 & 050000324-11-008, on 05/09-13/11 - 05/23-26/11, Brunswick Steam Electric Plant
IR 05000324/20120058 February 2013BrunswickIR 05000325-12-005 & 05000324-12-005, 10/01/12 - 12/31/12, Brunswick Steam Electric Plant, Units 1 & 2, Post Maintenance Testing, Follow-up of Events, and Other Activities
IR 05000324/201200824 July 2012BrunswickIR 05000325-12-008 & 05000324-12-008, June 18, 2012 - June 21, 2012, Brunswick Steam Electric Plant, Unit 1 and Unit 2
IR 05000324/201300230 April 2013BrunswickIR 05000325-13-002, 05000324-13-002; 01/01/13 - 03/31/13; Brunswick Steam Electric Plant, Units 1 & 2; Plant Modifications
IR 05000325/201001327 December 2010Brunswick
Robinson
IR 05000325-10-013; on 09/27/2010 - 12/27/2010; Carolina Power and Light Company; H.B. Robinson Steam Electric Plant, Unit 2; Other Activities
IR 05000335/20180011 May 2018Saint LucieNuclear Regulatory Commission Integrated Inspection Report 05000335/2018001 and 05000389/2018001
IR 05000400/200300522 August 2003HarrisIR 05000400-03-005, on 07/07/2003 - 07/11/2003 & 07/20/2003 - 07/25/2003, Shearon Harris, Unit 1. Biennial Baseline Inspection of the Identification and Resolution of Problems
IR 05000400/200300729 April 2005HarrisDraft Letter to Carolina Power and Light from Ogle, Shearon Harris Nuclear Power Plant - NRC Fire Protection Inspection Report No. 05000400-2003-007
IR 05000400/200300917 October 2003HarrisIR 05000400-03-009, on 09/15/03 Through 09/19/03, for Shearon Harris Nuclear Power Plant, New Hill, Nc; Supplemental Inspection IP 95001 for a White Performance Indicator in Initiating Events Cornerstone
IR 05000400/200400628 January 2005HarrisIR 05000400-04-006, on 09/26/2004 - 12/31/2004, Carolina Power and Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Refueling and Outage Activities, Other Activities
IR 05000400/200400725 May 2004HarrisIR 05000400-04-007, on 03/22/2004 - 03/26/2004 & 04/12/2004 - 04/16/2004, Shearon Harris Nuclear Power Plant Unit 1, New Hill, Nc; Plant Design - Pilot Enclosures 1, 2, & 3
IR 05000400/200500629 July 2005HarrisIR 05000400-05-006 on 06/13-07/01/2005 for Shearon Harris Nuclear Power Plant, Unit 1; Identification and Resolution of Problems
IR 05000400/200500714 October 2005HarrisIR 05000400-05-007, on 08/15 - 19/2005 and 08/29 - 09/02/2005; Shearon Harris Nuclear Power Plant, Unit 1; Triennial Fire Protection Inspection
IR 05000400/200600526 January 2007HarrisIR 05000400-06-005, on 10/01/2006 Through 12/31/2006, for Shearon Harris Nuclear Power Plant
IR 05000400/200700230 April 2007HarrisIR 05000400-07-002, on 01/01/2007 - 03/31/2007; Shearon Harris Nuclear Power Plant, Unit 1; Routine Integrated Report
IR 05000400/200700327 July 2007HarrisIR 05000400-07-003, on 04/01/2007 - 06/30/2007, Shearon Harris, Unit 1, Maintenance Effectiveness
IR 05000400/200700429 October 2007HarrisIR 05000400-07-004, on 07/1/2007 - 09/30/2007; Shearon Harris Nuclear Power Plant, Unit 1; Radiation Monitoring Instrumentation and Protective Equipment, Event Follow-up