Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNL-14-008, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report31 January 2014the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status ReportCommercial Grade Dedication
CNL-14-028, Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool Instrumentation28 February 2014Second Six Month Status Report in Response to Order No. EA-12-051, Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
CNL-14-032, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2014Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Reactor Vessel Water Level
Safe Shutdown Earthquake
FLEX
CNL-14-063, the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report30 April 2014the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status ReportCommercial Grade Dedication
CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro28 August 2014Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for BrownSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Operating Basis Earthquake
Arc flash
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
Hardened vent
CNL-14-195, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report31 October 2014the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status ReportCommercial Grade Dedication
CNL-14-222, First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.19 December 2014First Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.FLEX
CNL-15-018, Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report30 January 2015Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status ReportCommercial Grade Dedication
CNL-15-035, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)27 February 2015Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Time to boil
Internal Flooding
FLEX
Seismically rugged
CNL-15-036, Fourth Six-Month Status Report in Response to the March 1, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015Fourth Six-Month Status Report in Response to the March 1, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
CNL-15-082, Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report30 April 2015Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status ReportCommercial Grade Dedication
CNL-15-159, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Internal Flooding
FLEX
Seismically rugged
CNL-15-160, Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2015Fifth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
CNL-15-254, Third Six-Month Status Report and Phase 1 and Phase 2 Overall Integrated Plan in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation.29 December 2015Third Six-Month Status Report and Phase 1 and Phase 2 Overall Integrated Plan in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation.Mission time
Tornado Missile
FLEX
Tornado Generated Missile
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
CNL-16-036, Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)26 February 2016Sixth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Internal Flooding
FLEX
Seismically rugged
CNL-16-098, Fourth Six-Month Status Report in Response to the June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions30 June 2016Fourth Six-Month Status Report in Response to the June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsFLEX
Tornado Generated Missile
Containment Hardened Vent
CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events26 August 2016Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsInternal Flooding
FLEX
Seismically rugged
CNL-16-182, Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions22 December 2016Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsTornado Missile
FLEX
Hardened vent
CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 February 2017Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Internal Flooding
FLEX
Seismically rugged
CNL-17-021, Decommissioning Funding Status Report30 March 2017Decommissioning Funding Status Report
CNL-17-031, Annual Insurance Status Report30 March 2017Annual Insurance Status Report
CNL-17-072, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update27 June 2017Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
CNL-17-077, Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)30 June 2017Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)Tornado Missile
FLEX
Hardened vent
CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049)31 August 2017Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049)FLEX
Seismically rugged
CNL-17-138, Plant'S Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions20 December 2017Plant'S Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsFLEX
Tornado Generated Missile
Containment Hardened Vent
CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events23 February 2018Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsFLEX
Seismically rugged
CNL-18-025, Annual Insurance Status Report28 March 2018Annual Insurance Status Report
CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions27 June 2018Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsFLEX
Hardened vent
CNL-18-093, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update22 June 2018Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
CNL-18-136, Plants: Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update27 December 2018Plants: Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
CNL-19-015, Final Update on Progress of Facility Modifications for MSIV Leak Rate28 May 2019Final Update on Progress of Facility Modifications for MSIV Leak Rate
CNL-19-046, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update and Commitment Changes29 April 2019Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update and Commitment Changes
CNL-19-135, Tennessee Valley Authority Browns Ferry Nuclear Plant - Ninth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe27 December 2018Tennessee Valley Authority Browns Ferry Nuclear Plant - Ninth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe .FLEX
Hardened vent
CNL-20-020, Annual Insurance Status Report20 March 2020Annual Insurance Status Report
CNL-20-088, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update29 October 2020Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestone Status Update
CNL-21-030, Decommissioning Funding Status Report25 March 2021Decommissioning Funding Status Report
CNL-21-032, Watt Bar Nuclear Plant, Units 1 and 2 - Annual Insurance Status Report25 March 2021Watt Bar Nuclear Plant, Units 1 and 2 - Annual Insurance Status Report
CNL-21-048, Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Miilstone Status Update29 April 2021Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Miilstone Status Update
CNL-22-052, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status27 April 2022Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status
CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update31 October 2022Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
CNL-23-022, Decommissioning Funding Status Report29 March 2023Decommissioning Funding Status Report
ML02260029217 September 2002Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR
ML03092022331 March 2003Decommissioning Funding Status Report for Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants
ML03307013830 October 2003TVA - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Supplemental Information
ML0425403419 September 2004Meeting Handout on Browns Ferry Unit 1 Status
ML04324037419 November 2004Status of Unit 1 Restart IssuesSafe Shutdown
High winds
Reactor Vessel Water Level
Coatings
Hardened vent
Fire Protection Program
Power Uprate
ML05049019018 February 2005Status of Unit 1 Restart Issues, Revision 1Safe Shutdown
High winds
Reactor Vessel Water Level
Coatings
Emergency Lighting
Hardened vent
Fire Protection Program
Power Uprate
ML05054062418 February 2005(BFN) - Status of Unit 1 Restart Issues, Revision 1Safe Shutdown
High winds
Reactor Vessel Water Level
Coatings
Emergency Lighting
Hardened vent
Fire Protection Program
Power Uprate
ML05094022230 March 2005TVA- Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (SQN) and Watts Bar (WBN) Nuclear Plants
ML05139037519 May 2005(BFN) - Status of Unit 1 Restart Issues, Revision 2Safe Shutdown
High winds
Reactor Vessel Water Level
Coatings
Emergency Lighting
Hardened vent
Fire Protection Program
Power Uprate