Issue date | Title | Topic | |
---|---|---|---|
ML20128C172 | 29 January 1993 | Safety Evaluation Accepting First 10-yr Interval Inservice Testing Program for Pumps & Valves | |
ML20128L879 | 1 July 1985 | SER Re Conformance of post-accident Monitoring Design,Per Reg Guide 1.97,Rev 2 Re Emergency Response Capabilities. Neutron Flux Instrumentation Must Be Provided Before Fuel Loading | |
ML20133H902 | 6 August 1985 | Sser of Qualifications & Training of Operators & Adequacy of Extant Training Programs to Maintain Operator Readiness. Training Programs Acceptable,Barring Major Problems | License Renewal |
ML20133Q023 | 6 August 1985 | Mechanical Engineering Branch Sser Re Inservice Testing of Pumps & Valves.Program for Pumps & Valves Acceptable | Stroke time |
ML20133Q028 | 12 July 1985 | SER Supporting Pump & Valve Inservice Testing Program | Boric Acid Stroke time Power-Operated Valves |
ML20135B791 | 29 November 1996 | Safety Evaluation Approving Corporate Restructuring of TU to Facilitate Acquisition of Enserch Corp | |
ML20141P218 | 13 March 1986 | Evaluation Approving Use of ASME Code Cases N-397 & N-411. Applicant Must Investigate Root Cause by Considering Physical Mods Made to Piping Sys & Indicate Extent to Which Issues Resolved as Result of Revised Analyses Using Cases | |
ML20153C817 | 25 August 1988 | Safety Evaluation Supporting Corrections to Amends 9 & 8 to CPPR-126 & CPPR-127,respectively | |
ML20154B574 | 30 September 1998 | Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program | Stroke time Power Uprate |
ML20196J062 | 29 June 1999 | Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively | Severe Accident Management Guideline |
ML20196L019 | 8 July 1999 | Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl | Incorporated by reference Liquid penetrant |
ML20198D333 | 6 May 1992 | Safety Evaluation Supporting Licensee Response to Generic Ltr 82-33 Concerning Implementation of Reg Guide 1.97,rev 2 | Commercial Grade |
ML20199G453 | 19 March 1985 | Partially Withheld marked-up Rev 5 to Sser Re Allegation AQ-91 Concerning Inadequate Training of Personnel.Related Info Encl | |
ML20199G614 | 5 October 1984 | Partially Withheld marked-up Rev 2 to Sser Re Allegation AQ-88 Concerning safety-related Work Performed by Illegal Aliens | |
ML20199G620 | 13 March 1985 | Partially Withheld marked-up Rev 4 to Sser Re Allegation AQ-98 Concerning Extensive Delays in Repair of safety-related Matl | Hydrostatic |
ML20199G624 | 2 October 1984 | Partially Withheld marked-up Draft 4 to Sser Re Allegation A-130 Concerning Valve Disc Numbers on Repair Travelers That Differ from Code Data Rept | |
ML20199G630 | 1 November 1984 | Partially Withheld marked-up Rev 3 to Sser Re Allegation AQ-131 Concerning Electrical Boxes That Were Shipped to Facility in Damaged Condition or Were Damaged & Repaired by Unauthorized Personnel.Related Info Encl | Coatings Nondestructive Examination |
ML20199G775 | 22 January 1985 | Partially Withheld marked-up Rev 1 to Sser Re Allegation AQ-41 Concerning Sandblasted Pipe Sections Which Removed Heat Markings Used for Traceability.Related Info Encl | Coatings |
ML20202B930 | 10 August 1983 | SER Supporting Generic Westinghouse Mod for Reactor Trip Sys Automatic Actuation Using Shunt Coil Trip Attachments W/ Listed exceptions.Plant-specific Design Info Required for Westinghouse Plants Incorporating Shunt Trip Mod Encl | |
ML20202D010 | 27 January 1999 | Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 | VT-2 Liquid penetrant |
ML20203A488 | 3 February 1999 | Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 | VT-2 Incorporated by reference |
ML20206H206 | 6 May 1999 | SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 | Probabilistic Risk Assessment Exemption Request Power change Power Uprate |
ML20206Q009 | 14 May 1999 | Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 | Fire Barrier |
ML20206U635 | 19 December 1984 | Partially Withheld Rev 1 to Sser Re Allegations AQC-13, AQC-14,AQC-15,AC-18 & AC-40,alleging Unauthorized & Undocumented Holes Drilled Through Reinforcing Steel | |
ML20206U925 | 19 December 1984 | Partially Withheld Rev 1 to Sser Re Allegation AE-17, Alleging Field Run Conduit,Drywall & Lighting Installed Above Ceiling Panels in Control Room Classified as Nonseismic | Safe Shutdown Earthquake Earthquake |
ML20206U935 | 19 December 1984 | Partially Withheld Draft 7 to Sser Re Allegation AC-41 Concerning Poor Workmanship in Use of Elastic Joint Filler Matl Between Seismic Category I Structures.Related Documentation Encl | Earthquake |
ML20209G750 | 8 July 1999 | SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | Safe Shutdown Power-Operated Valves |
ML20210D832 | 23 July 1999 | Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp | Coatings Moisture barrier |
ML20210S804 | 18 February 1986 | Marked-up SER Re Rev 3 to Comanche Peak Response Team Program Plan | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Coatings Integrated leak rate test Earthquake |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20214J722 | 15 August 1986 | SER on Tdi Diesel Generator Owners Group Findings & Recommendations Re Operability/Reliability of Tdi Emergency Diesel Generators | Eddy Current Testing Liquid penetrant Overspeed trip |
ML20214T766 | 28 May 1987 | Handwritten Sser on Allegation Re Qa/Qc Repair,Rework & Maint | |
ML20214X180 | 8 June 1987 | Safety Evaluation Supporting Modified Design Basis Documented in Amend 61 | |
ML20215K646 | 15 March 1985 | Partially Deleted Draft Sser Providing Results of Staff Evaluation & Resolution of Approx 400 Technical Concerns & Allegations in Mechanical & Piping Area Re Constr Practices at Plant | |
ML20235U563 | 24 February 1989 | Safety Evaluation Concluding That Stated 10CFR70 License Conditions Should Be Incorporated Into 10CFR50 License | |
ML20236A574 | 13 October 1987 | Safety Evaluation Re Util 850502 Request to Eliminate Arbitrary Intermediate Pipe Breaks.Request Acceptable Provided Applicant Maintains Environ Qualification of safety-related Mechanical & Electrical Equipment | |
ML20237C406 | 14 August 1998 | Safety Evaluation Supporting Request to Implement Risk Informed IST Program | Safe Shutdown Boric Acid High winds Stroke time Internal Flooding Probabilistic Risk Assessment Incorporated by reference Large early release frequency Earthquake Thermography |