Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML0204403374 January 2002Cycle 18 Core Operating Limits ReportMELLLA
ML02361023631 December 2002of GE-NE-0000-0005-7308-01, Dresden Unit 2 & 3 - Elimination of MSIV Closure & Low Condenser Vacuum Scram Function During Startup Mode.Power change
ML03090066619 March 2003Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC
ML03177034617 June 2003Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC
ML03267135922 August 2002Calculation DRE01-0040, Site Boundary and Control Room Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 1Deep Dose Equivalent
ML03267136022 August 2002Calculation QDC-0000-N-1117, Site Boundary and Control Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 0Deep Dose Equivalent
ML0331001693 April 2002Allegation Briefing Sheet (Allegation Number NMSS-2002-A-0002)
ML0331001704 April 2002Allegation Review Board Summary (Allegation Number NMSS-2002-A-0002)
ML0331001752 May 2003Allegation Review Board Summary (Allegation Number NMSS-2002-A-0003)
ML0331002843 April 2002Allegation Briefing Sheet
ML0402702715 March 2002Holtec Highlights, HH17.05
ML04028060930 September 2003Erin Report C467030603-5572, Dresden Risk Assessment to Support ILRT (Type a) Interval Extension Request.Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Earthquake
ML04051007312 February 2002CTF Weld Documentation RequirementsHydrostatic
Nondestructive Examination
ML0405101012 May 2002CTF Weld Documentation Requirements, RevisitedControl of Heavy Loads
ML04336017331 May 2004Attachment 5, GE-NE-0000-0002-9629-01R1a, Pressure-Temperature Curves for Exelon Dresden Unit 2, Revision 1Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
ML04336018031 May 2004GE-NE-0000-0002-9600-01R2a, Pressure-Temperature Curves for Exelon Dresden Unit 3, Revision 2Unanalyzed Condition
Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Finite Element Analysis
ML0502704922 March 2005Information Abstracted from NRC Inspection Reports for the Dresden Generation Station, Units 2 and 3, Involving the Unanticipated Release of Tritium And/Or Radioactive Contaminants from the Dresden, Braidwood, and LaSalle Stations Since 199Grab sample
Annual Radiological Environmental Operating Report
ML05073032631 March 2005Non-Proprietary Dresden and Quad Cities Neutron Flux EvaluationCoast down
ML05109027031 January 2005Attachment 2, CDI Report No. 05-01, Rev 0, Revised Hydrodynamic Loads on Quad Cities Unit 2 Steam Dryer to 200 Hz, with Comparison to Dresden Units 2 & 3 Loads.
ML05133005325 April 2005Enclosure 3, Dresden Strain Gage Uncertainty Evaluation, SIA File No.: EXLN-17Q-301, Revision 0, Dated April 25,2005
ML05136010030 April 2005Enclosure 2, Attachment 2, Replacement Steam Dryer Reactor Vessel Bracket Stress Report for Quad Cities 1, 2, and Dresden 2,3, GE-NE-0000-0034-4803-02, Non-Proprietary, Dated April 2005Safe Shutdown Earthquake
Operating Basis Earthquake
Flow Induced Vibration
ML05144008124 April 2005Enclosure 1, Attachment 1, 26A6266, Rev 3, Steam Dryer, GE Nuclear Energy, Design Specification, April 24, 2005Safe Shutdown Earthquake
Operating Basis Earthquake
Flow Induced Vibration
ML0514400845 May 2005Enclosure 1, Attachment 2, 26A6266AB, Revision 4, Steam Dryer, GE Nuclear Energy, Design Specification Data Sheet, Dated May 5, 2005Control of Heavy Loads
Flow Induced Vibration
ML0528704807 December 2005Report of Project Manager Site Visit- Dresden Steam Dryer Licensing IssuesFlow Induced Vibration
ML06062036826 January 2006Attachment 3 (Technical Specifications) and 4 (Affidavit and Non-Proprietary Version of Attachment 2 to Exelon Letter Dated January 26, 2006)Anticipated operational occurrence
Safe Shutdown Earthquake
MELLLA
Coast down
ML0606701156 March 200603/06/2006 Ltr from Dresden (Exelon Nuclear) to NRC Response to Preliminary White Finding Regarding Inoperability of High Pressure Coolant Injection SystemReactor Vessel Water Level
Significance Determination Process
Preliminary White Finding
ML06115045731 January 2005C.D.I. Report No. 04-09P, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Revision 5, Dated January 2005, Non-Proprietary
ML06115046330 April 2005C.D.I. Technical Note No. 05-04, Quad Cities 2 New Dryer Smt Loads, Revision 5, Dated April 2005, Non-Proprietary
ML06213003231 May 2006GE-NE-0000-0053-8435-R1-NP, Rev 1, Dresden 2 & 3 and Quad Cities 1 & 2, Safety Valve Setpoint Tolerance Relaxation, May 2006Safe Shutdown
Stroke time
Feedwater Controller Failure
Power change
Power Uprate
ML06214012221 July 2006NF-BEX-06-167-NP, Rev, 2, Dresden Unit 3 Cycle 20 Slmcpr.Minimum Critical Power Ratio
ML0634601317 December 2006Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS BarrierDeep Dose Equivalent
Fuel cladding
ML07152039930 May 2007Fy 2007 Final Fee Rule Workpapers
ML0715705015 April 2007CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-1, Rev 003 Diesel Generator 3 Loading Under Design Bases Accident ConditionSafe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML0715705054 April 2007CC-AA-309-1001, Rev 1, Attachment 1, Design Analysis Major Revision Cover Sheet, 989-46-19-2, Rev 003, Calculation for Diesel Generator 2 Loading Under Design Bases Accident ConditionSafe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML0715705105 April 2007CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-3, Rev 004, Diesel Generator 2/3 Loading Under Design Bases Accident Condition.Safe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML07270084931 January 2005Caldon Experience in Nuclear Feedwater Flow MeasurementPower change
ML07311013731 October 2007Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report
ML08029023112 February 2004Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4Power change
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change