Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000352/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000373/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000454/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000456/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000461/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML020440337 | 4 January 2002 | Cycle 18 Core Operating Limits Report | MELLLA |
ML023610236 | 31 December 2002 | of GE-NE-0000-0005-7308-01, Dresden Unit 2 & 3 - Elimination of MSIV Closure & Low Condenser Vacuum Scram Function During Startup Mode. | Power change |
ML030900666 | 19 March 2003 | Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC | |
ML031770346 | 17 June 2003 | Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC | |
ML032671359 | 22 August 2002 | Calculation DRE01-0040, Site Boundary and Control Room Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 1 | Deep Dose Equivalent |
ML032671360 | 22 August 2002 | Calculation QDC-0000-N-1117, Site Boundary and Control Doses Following a Loss of Coolant Accident Using Alternative Source Terms, Revision 0 | Deep Dose Equivalent |
ML033100169 | 3 April 2002 | Allegation Briefing Sheet (Allegation Number NMSS-2002-A-0002) | |
ML033100170 | 4 April 2002 | Allegation Review Board Summary (Allegation Number NMSS-2002-A-0002) | |
ML033100175 | 2 May 2003 | Allegation Review Board Summary (Allegation Number NMSS-2002-A-0003) | |
ML033100284 | 3 April 2002 | Allegation Briefing Sheet | |
ML040270271 | 5 March 2002 | Holtec Highlights, HH17.05 | |
ML040280609 | 30 September 2003 | Erin Report C467030603-5572, Dresden Risk Assessment to Support ILRT (Type a) Interval Extension Request. | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency Earthquake |
ML040510073 | 12 February 2002 | CTF Weld Documentation Requirements | Hydrostatic Nondestructive Examination |
ML040510101 | 2 May 2002 | CTF Weld Documentation Requirements, Revisited | Control of Heavy Loads |
ML043360173 | 31 May 2004 | Attachment 5, GE-NE-0000-0002-9629-01R1a, Pressure-Temperature Curves for Exelon Dresden Unit 2, Revision 1 | Shutdown Margin Anticipated operational occurrence Hydrostatic Finite Element Analysis |
ML043360180 | 31 May 2004 | GE-NE-0000-0002-9600-01R2a, Pressure-Temperature Curves for Exelon Dresden Unit 3, Revision 2 | Unanalyzed Condition Shutdown Margin Anticipated operational occurrence Hydrostatic Finite Element Analysis |
ML050270492 | 2 March 2005 | Information Abstracted from NRC Inspection Reports for the Dresden Generation Station, Units 2 and 3, Involving the Unanticipated Release of Tritium And/Or Radioactive Contaminants from the Dresden, Braidwood, and LaSalle Stations Since 199 | Grab sample Annual Radiological Environmental Operating Report |
ML050730326 | 31 March 2005 | Non-Proprietary Dresden and Quad Cities Neutron Flux Evaluation | Coast down |
ML051090270 | 31 January 2005 | Attachment 2, CDI Report No. 05-01, Rev 0, Revised Hydrodynamic Loads on Quad Cities Unit 2 Steam Dryer to 200 Hz, with Comparison to Dresden Units 2 & 3 Loads. | |
ML051330053 | 25 April 2005 | Enclosure 3, Dresden Strain Gage Uncertainty Evaluation, SIA File No.: EXLN-17Q-301, Revision 0, Dated April 25,2005 | |
ML051360100 | 30 April 2005 | Enclosure 2, Attachment 2, Replacement Steam Dryer Reactor Vessel Bracket Stress Report for Quad Cities 1, 2, and Dresden 2,3, GE-NE-0000-0034-4803-02, Non-Proprietary, Dated April 2005 | Safe Shutdown Earthquake Operating Basis Earthquake Flow Induced Vibration |
ML051440081 | 24 April 2005 | Enclosure 1, Attachment 1, 26A6266, Rev 3, Steam Dryer, GE Nuclear Energy, Design Specification, April 24, 2005 | Safe Shutdown Earthquake Operating Basis Earthquake Flow Induced Vibration |
ML051440084 | 5 May 2005 | Enclosure 1, Attachment 2, 26A6266AB, Revision 4, Steam Dryer, GE Nuclear Energy, Design Specification Data Sheet, Dated May 5, 2005 | Control of Heavy Loads Flow Induced Vibration |
ML052870480 | 7 December 2005 | Report of Project Manager Site Visit- Dresden Steam Dryer Licensing Issues | Flow Induced Vibration |
ML060620368 | 26 January 2006 | Attachment 3 (Technical Specifications) and 4 (Affidavit and Non-Proprietary Version of Attachment 2 to Exelon Letter Dated January 26, 2006) | Anticipated operational occurrence Safe Shutdown Earthquake MELLLA Coast down |
ML060670115 | 6 March 2006 | 03/06/2006 Ltr from Dresden (Exelon Nuclear) to NRC Response to Preliminary White Finding Regarding Inoperability of High Pressure Coolant Injection System | Reactor Vessel Water Level Significance Determination Process Preliminary White Finding |
ML061150457 | 31 January 2005 | C.D.I. Report No. 04-09P, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Revision 5, Dated January 2005, Non-Proprietary | |
ML061150463 | 30 April 2005 | C.D.I. Technical Note No. 05-04, Quad Cities 2 New Dryer Smt Loads, Revision 5, Dated April 2005, Non-Proprietary | |
ML062130032 | 31 May 2006 | GE-NE-0000-0053-8435-R1-NP, Rev 1, Dresden 2 & 3 and Quad Cities 1 & 2, Safety Valve Setpoint Tolerance Relaxation, May 2006 | Safe Shutdown Stroke time Feedwater Controller Failure Power change Power Uprate |
ML062140122 | 21 July 2006 | NF-BEX-06-167-NP, Rev, 2, Dresden Unit 3 Cycle 20 Slmcpr. | Minimum Critical Power Ratio |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |
ML071520399 | 30 May 2007 | Fy 2007 Final Fee Rule Workpapers | |
ML071570501 | 5 April 2007 | CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-1, Rev 003 Diesel Generator 3 Loading Under Design Bases Accident Condition | Safe Shutdown Stroke time Emergency Lighting Fuel cladding |
ML071570505 | 4 April 2007 | CC-AA-309-1001, Rev 1, Attachment 1, Design Analysis Major Revision Cover Sheet, 989-46-19-2, Rev 003, Calculation for Diesel Generator 2 Loading Under Design Bases Accident Condition | Safe Shutdown Stroke time Emergency Lighting Fuel cladding |
ML071570510 | 5 April 2007 | CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-3, Rev 004, Diesel Generator 2/3 Loading Under Design Bases Accident Condition. | Safe Shutdown Stroke time Emergency Lighting Fuel cladding |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
ML073110137 | 31 October 2007 | Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report | |
ML080290231 | 12 February 2004 | Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 | Power change |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |