Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML17284A67530 June 1998Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms
ML17285A29316 February 1989Special Rept:On 890203,plant Personnel Unable to Obtain Sample from PASS Due to Lack of Compression in Vacuum Pump. Caused by Broken Pump Shaft.Replacement Parts Currently on Order & Pump Will Be Repaired as Soon as Possible
ML17285A35122 March 1989Special Rept:On 890306,post-accident Sampling Primary Coolant Radiation Monitor Inoperable.Caused by Excess Moisture.Pass Vacuum Pump PSR-P-702 Replaced W/New Pump & Bulkhead Fitting Repaired
ML17285A73314 September 1989Special Rept:On 890821,leakage Discovered in post-accident Sampling Sys Containment Valves When in Closed Position. Maint Work Requests Prepared to Repair post-accident Sampling Sys Containment Isolation Valves
ML17285A80019 October 1989Special Rept:On 891009,valve PSR-V-104 Isolated to Repair Leaking PASS Sample Valve PSR-V-616,resulting in PASS Being Inoperable.Plan Made to Replace Valve PSR-V-616 to Restore Sys by Jan 1990
ML17286A94015 July 1991Special Rept:On 910604,time History Triaxial Acceleration Sensor Found Malfunctioning During Performance of Seismic Sys Maint Activities.Failed Unit Returned Under Warranty to Supplier for Repair.Sys Now Fully OperationalEarthquake
ML17289A60022 May 1992Special Rept:On 920420,seismic Triaxial Peak Accelerograph & Space Frame Removed to Allow Refueling of Reactor Core. Accelerometer Will Be Returned to Svc When Space Frame Reattached to Reactor Vessel Prior to StartupEarthquake
ML17289A9167 October 1992Special Rept:On 920905,channel 1 on Main Steam Line D Nozzle in Drywell Did Not Pass Surveillance & Inoperable for More than 30 Days.Caused by Faulty Equipment in Drywell. Maint Work Request Initiated to Repair Failed Channel
ML17289B12811 January 1993Update to 921007 Special Rept Re Inoperability of Loose Parts Detection Instrumentation Following Failure of Channel 1 on 921113.On 921128,constant Alarm Received on Channel 8. Maint Work Request Initiated to Repair Failed Channels
ML17290A53011 June 1993Special Rept:On 930503,space Frame & Attached Seismic Triaxial Peak Accelorograph (SEIS-TPA-1) Removed to Allow for Refueling of Reactor Core.Instrument Returned to Svc on 930607Earthquake
ML17290A83810 December 1993Special Rept:On 931126,main Control Room Received Stack Monitor Sys Trouble Annunciator & Status Display Indicated High Range Channel Failed self-test.Caused by Component Failure of Stack Monitor Detector.Replacement in Progress
ML17290A88717 December 1993Special Rept:On 931116,loose Parts Detection Sys Channel 5 Did Not Pass Daily Channel Surveillance.Exact Cause Not Determined.Need to Provide Addl Notifications Should Other Channels Become Inoperable Not Necessary
ML17291A41326 September 1994Special Rept:On 940825,loose Part Detection Sys Channel Number Eight Actuated Associated MCR Alarm & on 940908 Subj Channel Began Alarming Due to Electronic Noise Originating in Drywell.Electronic Module of Channel Removed
ML17291A69616 March 1995Special Rept:On 950305,reactor Bldg Effluent Monitoring Sys Was Inoperable for 72 Hrs.Caused by Failure of Stack Monitor Detector.Stack Monitor Returned to Svc on 950314
ML17291A97818 August 1995Special Rept:On 950712,loose Part Detection Sys Channel 4 Failed Due to Electrical Noise During Daily Check.Channel 4 Will Remain Inoperable Until Next Forced or Scheduled Outage When Primary Containment de-inerted for Other Work
ML17291B0988 November 1995Special Rept:On 951026,RB Effluent Monitoring Sys Inoperable for 72 H Due to Failure of Mid Range Stack Monitor.Cryostat Cooling Assemblies for Mid & High Range Stack Monitors Returned to Vendor for Refurbishment
ML17292A5908 November 1996Special Rept:On 961023,intermediate & High Range Stack Monitors PRM-RE-1B & PRM-RE-1C Declared Inoperable.Caused by Monitor Output Had Upward Trend Due to Electronic Noise Interference.Work Request GeneratedOffsite Dose Calculation Manual
ML17292A7929 April 1997Ro:On 970327,reactor Scrammed.Evaluation Results,Conclusions & Corrective Actions Will Be Shared W/Nrc Prior to Plant Startup from Maint & Refueling Outage
ML17292B22814 January 1998Informs of Unexpected Change in Feedwater Temperature & Flow Indication Used to Calculate Plant Heat Balance During Routine Trending of Plant Computer Feedwater Temperatures on 980112.Corrective Actions Reduced Reactor Power to 99%