Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IA-86-666, Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions17 August 1982Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions
ML20055D05621 June 1990Responds to Re R Pollard Concerns W/Steam Generator Cracks at Facility.Licensee Removed & Repaired All Identified Cracks Per ASME Code Requirements.Nrc Concluded That Plant Can Be Operated for Remainder of Fuel CycleThermal fatigue
ML20206L86423 November 1988Responds to Re Operation of Plants Following Steam Generator Leak at Indian Point 3.NRC Evaluated Event & Concluded That No Immediate Safety Concerns Warrant Shutdown of FacilitiesSafe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Probabilistic Risk Assessment
Finite Element Analysis
Feedwater Heater
Systematic Assessment of Licensee Performance
Eddy Current Testing
Fire Protection Program
Power change
Flow Induced Vibration
Power Uprate
Overexposure
Overspeed trip
ML20215K51419 March 1982Ack Receipt of 820212 Request That Limited Appearance Sessions Be Held in New York City.Aslb Proposes to Hold at Least One Set of Hearings.Recommendation for Date,Time & Place Requested
ML20215K53317 August 1982Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions