Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-86-666, Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions | 17 August 1982 | Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions | |
ML20055D056 | 21 June 1990 | Responds to Re R Pollard Concerns W/Steam Generator Cracks at Facility.Licensee Removed & Repaired All Identified Cracks Per ASME Code Requirements.Nrc Concluded That Plant Can Be Operated for Remainder of Fuel Cycle | Thermal fatigue |
ML20206L864 | 23 November 1988 | Responds to Re Operation of Plants Following Steam Generator Leak at Indian Point 3.NRC Evaluated Event & Concluded That No Immediate Safety Concerns Warrant Shutdown of Facilities | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Probabilistic Risk Assessment Finite Element Analysis Feedwater Heater Systematic Assessment of Licensee Performance Eddy Current Testing Fire Protection Program Power change Flow Induced Vibration Power Uprate Overexposure Overspeed trip |
ML20215K514 | 19 March 1982 | Ack Receipt of 820212 Request That Limited Appearance Sessions Be Held in New York City.Aslb Proposes to Hold at Least One Set of Hearings.Recommendation for Date,Time & Place Requested | |
ML20215K533 | 17 August 1982 | Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions |