Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20126J37510 April 1981Responds to 810205 Request for Aerial Photos of Plant. Negative Forwarded to G Allen,Citrus County Dept of Disaster Preparedness,On 810217
ML20138E45718 October 1985Responds to 850911 Request Re Constituent GL Rausch Ltr on Safety of Plant During Hurricane.Design of Plant Protects Against Winds Up to 140 Mph & Associated Tides & Waves
ML20211Q31322 July 1986Responds to D True Re Safety of Plant.B&W Reactors Under Reassessment,Due to Davis-Besse & Rancho Seco Transients During 1985.Util Participating in Reexam to Be Completed by End of Yr
ML20235J11728 September 1987Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review
ML20235J53528 September 1987Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed
ML20236L1814 August 1987Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing
ML20245H65926 April 1989Responds to Re L Ball Ltr Expressing Concerns About Extent & Cost of Shutdowns & Repairs at Unit 3. Licensee Examined Pump a & Motor & Identified Damage That Could Have Caused or Resulted from Shaft Failure
ML20245K1807 August 1989Responds to Re Constituent,Jm Deisch,Inquiry About Condition of DOE Nuclear Plant North of Tampa,Fl.Nrc Does Not Have Info on DOE Facilities,However NRC Facility in Fl in Acceptable Conformance W/Regulations & StdsSystematic Assessment of Licensee Performance
ML20248A68526 April 1989Responds to Re L Ball Concerns W/Extent & Cost of Shutdowns & Repairs,Particularly Repetitive Repairs,At Plant.All Repairs Scheduled to Be Completed by Apr 1989 & Plant Restarted
NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress23 April 1986Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress
NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco23 April 1986Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco