Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
HL-1925, NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured15 November 1991NPDES Noncompliance Notification:On 911107,sample from Cooling Tower Basin Recorded Value Greater than 2 Ppm Free Available Chlorine/Total Residual Chlorine.Caused by Malfunction of Valve Torque Switch.Valve Manually Secured
HL-2002, NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced3 January 1992NPDES Noncompliance Notification:On 911230,chlorinated Water Discharged Into Altamaha River Due to Internal Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Failed Valve Replaced
HL-2260, NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned11 June 1992NPDES Noncompliance Notification:On 920529,all 3 Unit 1 Cooling Towers Were Overflowing.Caused by Restriction in Cooling Tower Return Flow.Cooling Tower Screens Cleaned
ML19320A70127 June 1980NPDES Noncompliance Notification:On 800619,at Full Power Operation,Circulating Water Chlorination Sequence Was Automatically Activated,Resulting in Release of Free Available Chlorine in Cooling Water Blowdown
ML19323E41816 May 1980NPDES Noncompliance Notification:On 800512,facility Circulating Overflow Exceeded NPDES Limit of 0.2 Ppm Average Residual Chlorine & 0.5 Ppm Max Residual Chlorine. Chlorine Analyzer Repaired & Returned to Svc
ML20087A5033 January 1992NPDES Noncompliance Notification:On 911230 Sample Indicated That Chlorinated Water Was Being Discharged to Altamaha River.Caused by Failure of Valve Which Isolates Chlorine Addition Sys from Svc Water Sys Intake.Valve Replaced
ML20133F24030 July 1985NPDES Noncompliance Notification:On 850620,6,000 Gallons of Glycol Solution Discharged Into Altamaha River.State of Ga,Environ Protection Div Granted Util Permission for Disposal on 850619