Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML23285A12512 October 2023Official Exhibit - KRS-001-MA-CM01 - Applicant'S Pre-Filed Testimony of Peter Hastings; Mandatory Hearing; Kairos PowerSafe Shutdown
Exemption Request
Environmental Justice
Tristructural Isotropic
ML23285A12612 October 2023Official Exhibit - KRS-002-MA-CM01 - Kairos Power; Hermes Mandatory Hearing - Overview Panel (Slides)
ML23285A12712 October 2023Official Exhibit - KRS-003-MA-CM01 - Kairos Power; Hermes Mandatory Hearing - Safety Panel (Slides)
ML23285A12812 October 2023Official Exhibit - KRS-004-MA-CM01 - Kairos Power; Hermes Mandatory Hearing - Environmental Panel (Slides)Environmental Justice
ML23285A12912 October 2023Official Exhibit - KRS-005-MA-CM01 - Kairos Power; Statements of Qualification for All WitnessesSafe Shutdown
Probabilistic Risk Assessment
Exemption Request
Earthquake
ML23285A13012 October 2023Official Exhibit - KRS-006-MA-CM01 - Kairos Power Llc'S Responses to Commission'S Prehearing QuestionsSafe Shutdown
Design basis earthquake
Exemption Request
Earthquake
ML23285A14812 October 2023Official Exhibit - NRC-002-MA-CM01 - Draft Construction Permit for Kairos Power LLC (October 6, 2023)
ML23285A14912 October 2023Official Exhibit - NRC-003-MA-CM01 - Draft Summary Record of Decision for Kairos Hermes Test Reactor Construction Permit (October 10, 2023)Environmental Justice
ML23285A15012 October 2023Official Exhibit - NRC-004-MA-CM01 - NRC Staff Responses to Commission Pre-Hearing Questions (September 28, 2023)Safe Shutdown
Design basis earthquake
ML23285A15312 October 2023Official Exhibit - NRC-005A-MA-CM01 - Kairos Power LLC, Construction Permit Application - Cover Letter and General Information (September 29, 2021)Exemption Request
ML23285A15412 October 2023Official Exhibit - NRC-005B-MA-CM01 - Kairos Power LLC, Construction Permit Application - Preliminary Safety Analysis Report (Psar), Revision 3 (May 31, 2023)Safe Shutdown
High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Emergency Lighting
Condition Adverse to Quality
Tornado Generated Missile
Design basis earthquake
Earthquake
Minimum staff
Fire Protection Program
Tritium
Power change
Flow Induced Vibration
Tristructural Isotropic
ML23285A15512 October 2023Official Exhibit - NRC-005C-MA-CM01 - Kairos Power LLC, Construction Permit Application, Enclosure 4 - KP-TR-017-NP, KP-FRN Core Design and Analysis Methodology, Revision 1 (September 29, 2022)Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Coatings
License Renewal
Power change
Tristructural Isotropic
ML23285A15612 October 2023Official Exhibit - NRC-005D-MA-CM01 - Kairos Power LLC, Construction Permit Application, Enclosure 3 - KP-TR-018, Postulated Event Analysis Methodology, Revision 2 (February 24, 2023)Safe Shutdown
Shutdown Margin
Mission time
Anticipated operational occurrence
Coatings
Earthquake
Coast down
Tristructural Isotropic
ML23285A15712 October 2023Official Exhibit - NRC-005E-MA-CM01 - Kairos Power LLC, Construction Permit Application - Environmental Report, Revision 1 (March 30, 2023)Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Zebra Mussel
Earthquake
Pandemic
Chernobyl
COVID19
Biofouling
Environmental Justice
Uranium Hexafluoride
Tristructural Isotropic
Fatality
Exit Sign
Exclusive Use
Overspeed trip
ML23285A16112 October 2023Official Exhibit - NRC-007-MA-CM01 - Safety Evaluation Related to the Kairos Power LLC Construction Permit Application for the Hermes Test Reactor (June 13, 2023)Safe Shutdown
High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Design basis earthquake
Earthquake
Fire Protection Program
Power change
Coast down
Tristructural Isotropic
ML23285A16312 October 2023Official Exhibit - NRC-009-MA-CM01 - Staff Presentation Slides - Overview Panel (October 12, 2023)Tristructural Isotropic
ML23285A16412 October 2023Official Exhibit - NRC-010-MA-CM01 - Staff Presentation Slides - Safety Panel (October 12, 2023)Tristructural Isotropic
ML23285A16512 October 2023Official Exhibit - NRC-011-MA-CM01 - Staff Presentation Slides - Environmental Panel (October 12, 2023)Environmental Justice
NUREG-2263, Official Exhibit - NRC-008-MA-CM01 - NUREG-2263, Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor (August 17, 2023)12 October 2023Official Exhibit - NRC-008-MA-CM01 - NUREG-2263, Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor (August 17, 2023)Ultimate heat sink
Offsite Dose Calculation Manual
Coatings
Incorporated by reference
License Renewal
Nuclear Energy Innovation and Modernization Act
COVID-19
Environmental Justice
Uranium Hexafluoride
Fatality
Depleted uranium
SECY-23-0074, Official Exhibit - NRC-001-MA-CM01 - SECY-23-0074, Staff Statement in Support of the Uncontested Hearing for Issuance of a Construction Permit for the Kairos Hermes Test Reactor (August 23, 2023)12 October 2023Official Exhibit - NRC-001-MA-CM01 - SECY-23-0074, Staff Statement in Support of the Uncontested Hearing for Issuance of a Construction Permit for the Kairos Hermes Test Reactor (August 23, 2023)Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Coatings
Tristructural Isotropic