UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of KAIROS POWER LLC (Hermes Test Reactor)
Docket No.
50-7513-CP Hearing Exhibit Exhibit Number:
Exhibit
Title:
KRS-004 Kairos Power; Hermes Mandatory Hearing - Environmental Panel (Slides)
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
PETER HASTINGS - VICE PRESIDENT, REGULATORY AFFAIRS AND QUALITY OCTOBER 19, 2023 Hermes Mandatory Hearing - Environmental Panel 1
([KLELW.56
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Kairos Powers mission is to enable the worlds transition to clean energy, with the ultimate goal of dramatically improving peoples quality of life while protecting the environment.
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Regulatory Bases for the Environmental Report
- National Environmental Policy Act
- Interim Staff Guidance Augmenting NUREG-1537, Part 1, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content
- Interim Staff Guidance Augmenting NUREG-1537, Part 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria 3
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Site Selection Process
- Site Selection Business Objectives Facilitating rapid deployment of a non-power reactor in support of Kairos Powers iterative development approach Selecting a site that is, or can be, supported by sufficient high-quality existing site data for licensing and design Supporting both near-term and future testing capabilities
Proximity to DOE National Labs Supporting opportunities for future development 4
- Sub-regional Screening Criteria Availability of the site for access, characterization, and use within the Hermes schedule Ability to acquire timely site-specific data Availability of high quality and sufficient site data for licensing and design
- Sub-regions Considered Eastern Tennessee Pacific Northwest Eastern Idaho Piketon, Ohio Southeast United States Oak Ridge, TN was selected as the Candidate site Eagle Rock, ID was selected as the Alternative site
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Hermes Site 5
- Site of the former K-33 and K-31 gaseous diffusion plants Previously disturbed Well characterized Property size is ~185 acres Temporarily disturbed area of 138 acres
- Significant Existing infrastructure Roads and utility connections
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
K-31 and K-33 Gaseous Diffusion Plants Previously Occupied the Kairos Property 6
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Hermes Environmental Report 7
Chapter Contents 1 Introduction Introduction of the environmental report, Site history, Purpose and need for the proposed action, Regulatory provisions, permits, and required consultations 2 Proposed Action Proposed action, Site location and layout, Non-power reactor description, Water consumption and treatment, Cooling and heat removal systems, Waste systems, Storage, treatment, and transportation of radioactive and nonradioactive materials 3 Description of the Affected Environment Land use and visual resources, Meteorology, climatology, air quality, and noise, Geologic environment, Water resources, Ecological resources, Historic and cultural resources, Socioeconomics, Human health, Environmental justice 4 Impacts of Proposed Construction, Operations, and Decommissioning Land use and visual resources, Air quality and noise, Geologic environment, Water resources, Ecological resources, Historic and cultural resources, Socioeconomics, Human health, Waste management, Transportation, Postulated events, Environmental justice, Cumulative effects 5 Alternatives No-action alternative, Alternatives eliminated from further discussion, Reasonable alternatives, Evaluation of reasonable alternative sites discussion, Cost-benefit of the alternatives, Comparison of the potential environmental impacts 6 Conclusions Unavoidable adverse environmental impacts, Relationship between short-term uses and long-term productivity of the environment, Irreversible and irretrievable commitments of resources Impacts of proposed construction, operations, and decommissioning were determined to be SMALL