Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000327/LER-1982-0701 July 1982LER 82-070/01T-0:on 820618,discovered Possible Inoperability of Containment Sump Level Instrument Loops in Event of Loca.Possibly Caused by Increased Temps Rupturing Sensor Bellows.Procedures Revised
05000327/LER-1982-126, Revised LER 82-126/01T-1:on 821105,check Valve Downstream of MSIV Failed.Caused by Valve Disc Separating from Stem & Lodging Downstream in Steam Dump Header.Disc Retrieved & Replaced30 March 1983Revised LER 82-126/01T-1:on 821105,check Valve Downstream of MSIV Failed.Caused by Valve Disc Separating from Stem & Lodging Downstream in Steam Dump Header.Disc Retrieved & Replaced
05000327/LER-1983-122, Updated LER 83-122/03X-1:on 830927 & 28,diesel Generator 2A-A Declared Inoperable Due to Failure to Maintain Load of 4,400 Kw During Surveillance Testing.Caused by Faulty Exciter1 November 1983Updated LER 83-122/03X-1:on 830927 & 28,diesel Generator 2A-A Declared Inoperable Due to Failure to Maintain Load of 4,400 Kw During Surveillance Testing.Caused by Faulty Exciter
05000327/LER-1993-01911 August 1993LER 93-019-00:on 930713,containment Isolation Occurred Due to Inaccurate Drawing Used to Develop Clearance Boundary. Returned Valves to Normal Positions & Restored Sys Air pressure.W/930811 LtrSafe Shutdown
05000327/LER-1993-02017 August 1993LER 93-020-00:on 930719,Train B of Auxiliary Bldg Gas Treatment Sys Manually Initiated as Result of Fire in General Supply Fan Room.Sg Wet Layup Recirculation Pump Bearing & Motor replaced.W/930817 LtrFire Watch
05000327/LER-1993-02118 August 1993LER 93-021-00:on 930720,discovered That Boron Analysis of Refueling Canal Not Performed,As Required by TS 3.9.1 Due to Miscommunication.Lco 3.9.1 Entered.Chemistry Surveillance Instruction Will Be revised.W/930818 Ltr
ML20199C29513 November 1997LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns
ML20236P64410 July 1998LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134