05000000/LER-1975-004, Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept | 13 January 1975 | Forwards LER 75-004-00.Conclusions of Investigation Will Be Submitted in 10-day Rept | |
05000000/LER-1985-035, Forwards LER 85-035-00 Re Physical Security Event | 5 June 1985 | Forwards LER 85-035-00 Re Physical Security Event | |
05000000/LER-1985-078, Forwards Revised LER 85-078-01 Re Physical Security Event | 22 November 1985 | Forwards Revised LER 85-078-01 Re Physical Security Event | |
05000000/LER-1985-083, Forwards LER 85-083-01.Rept Contains Safeguards Info | 3 October 1986 | Forwards LER 85-083-01.Rept Contains Safeguards Info | |
05000000/LER-1986-008, Forwards LER 86-008-00 | 16 October 1986 | Forwards LER 86-008-00 | |
05000000/LER-1986-018, Forwards LER 86-018-00 | 14 March 1986 | Forwards LER 86-018-00 | |
05000000/LER-1986-031, Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21) | 13 June 1986 | Forwards LER 86-031-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21) | |
05000000/LER-1986-045, Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21) | 8 September 1986 | Forwards LER 86-045-00 Re Physical Security Event.Rept Withheld (Ref 10CFR73.21) | |
05000000/LER-1986-049, Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21) | 29 September 1986 | Forwards LER 86-049-00 Re Physical Security Event.Encl Withheld (Ref 10CFR73.21) | |
05000000/LER-1986-054, Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21) | 7 October 1986 | Forwards LER 86-054-00 Re Physical Security Event.Ler Withheld (Ref 10CFR73.21) | |
05000000/LER-1986-055, Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21) | 10 October 1986 | Forwards LER 86-055-00 Re Physical Security Event.Withheld (Ref 10CFR73.21) | |
05000220/LER-1981-019, Forwards LER 81-019/03L-0 | 7 July 1981 | Forwards LER 81-019/03L-0 | |
05000220/LER-1982-009, Forwards Updated LER 82-009/01X-1 | 12 August 1982 | Forwards Updated LER 82-009/01X-1 | |
05000220/LER-1982-010, Forwards LER 82-010/03L-0 | 22 April 1982 | Forwards LER 82-010/03L-0 | |
05000220/LER-1982-011, Forwards LER 82-011/03L-0 | 9 August 1982 | Forwards LER 82-011/03L-0 | |
05000220/LER-1982-012, Forwards LER 82-012/04L-0 | 24 September 1982 | Forwards LER 82-012/04L-0 | |
05000220/LER-1982-015, Forwards LER 82-015/03L-0 | 16 December 1982 | Forwards LER 82-015/03L-0 | |
05000220/LER-1982-016, Forwards LER 82-016/03L-0 | 22 December 1982 | Forwards LER 82-016/03L-0 | |
05000220/LER-1983-001, Forwards LER 83-001/04L-0 | 18 February 1983 | Forwards LER 83-001/04L-0 | |
05000220/LER-1983-002, Forwards LER 83-002/04L-0 | 11 March 1983 | Forwards LER 83-002/04L-0 | |
05000220/LER-1983-003, Forwards LER 83-003/04L-0 | 23 March 1983 | Forwards LER 83-003/04L-0 | |
05000220/LER-1983-004, Forwards LER 83-004/03L-0 | 28 March 1983 | Forwards LER 83-004/03L-0 | |
05000220/LER-1983-005, Forwards LER 83-005/01T-0 | 25 March 1983 | Forwards LER 83-005/01T-0 | |
05000220/LER-1983-020, Forwards Updated LER 83-020/03X-1 | 27 April 1983 | Forwards Updated LER 83-020/03X-1 | |
05000220/LER-1988-009, FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util | 15 May 1989 | FOIA Request for LER 88-09,NRC Enforcement Conference W/Util on 880711,Insp Rept 50-220/88-15 & NRC Notice of Violation Ltr to Util | |
05000220/LER-1997-012, Clarifies CA 3 of LER 97-12, Addl 10CFR50 App R Section Iii.J Lighting Deficiencies | 31 March 1998 | Clarifies CA 3 of LER 97-12, Addl 10CFR50 App R Section Iii.J Lighting Deficiencies | |
05000220/LER-1997-015, Informs NRC That Util Is Retracting LER 97-015, Potential Bypass Leakage Path Between Drywell & Torus During Vent & Purge, Which Had Been Reported IAW 10CFR50.73(a)(2)(v)(D). Leakage Path Would Not Have Prevented Plant Function | 1 May 1998 | Informs NRC That Util Is Retracting LER 97-015, Potential Bypass Leakage Path Between Drywell & Torus During Vent & Purge, Which Had Been Reported IAW 10CFR50.73(a)(2)(v)(D). Leakage Path Would Not Have Prevented Plant Functions | |
05000220/LER-1998-003, Forwards LER 98-003-00 Re Power/Flow Relationship TS Violation.Rept Fulfills Requirement of TS 3.1.7.g for 30-day Written Rept If Power/Flow Relationship of COLR Is Exceeded | 3 April 1998 | Forwards LER 98-003-00 Re Power/Flow Relationship TS Violation.Rept Fulfills Requirement of TS 3.1.7.g for 30-day Written Rept If Power/Flow Relationship of COLR Is Exceeded | |
05000220/LER-1998-013, Forwards LER 98-013-00 Re Valve Repositioning Caused by non-conformance W/App R Safe Shutdown Analysis | 6 July 1998 | Forwards LER 98-013-00 Re Valve Repositioning Caused by non-conformance W/App R Safe Shutdown Analysis | Safe Shutdown |
05000220/LER-1998-014, Forwards LER 98-014-00 Re CR Staffing in Violation of TS Due to Unqualified SRO Assuming SRO Shift Duties | 17 July 1998 | Forwards LER 98-014-00 Re CR Staffing in Violation of TS Due to Unqualified SRO Assuming SRO Shift Duties | |
05000322/LER-1986-011, Forwards LER 86-011-02,Station Procedure 84.122.01 & Intake Canal Soundings. W/One Oversize Drawing | 5 December 1986 | Forwards LER 86-011-02,Station Procedure 84.122.01 & Intake Canal Soundings. W/One Oversize Drawing | Ultimate heat sink |
05000322/LER-1986-046, Advises That Preventive Maint Scheduled Activity Work Sheet Will Be Initiated to Inspect Flap Check Valves & Reducing Rubber Sleeve in Approx 24 Months.Commitment Resolves Questions & Concerns Re LER 86-046 | 13 March 1987 | Advises That Preventive Maint Scheduled Activity Work Sheet Will Be Initiated to Inspect Flap Check Valves & Reducing Rubber Sleeve in Approx 24 Months.Commitment Resolves Questions & Concerns Re LER 86-046 | |
05000322/LER-1987-014, Forwards LER 87-014 & Rev 1 to LER 86-029 | 5 June 1987 | Forwards LER 87-014 & Rev 1 to LER 86-029 | |
05000322/LER-1990-009, Forwards LER 90-009-00 & LER 90-010-00 Re Unplanned Actuation of ESF Sys | 9 January 1991 | Forwards LER 90-009-00 & LER 90-010-00 Re Unplanned Actuation of ESF Sys | |
05000352/LER-1984-006, Forwards LER 84-006-00 Re Automatic Isolation of Main Control Room Ventilation Sys on 841113.Event Occurred Prior to Initial Criticality | 13 December 1984 | Forwards LER 84-006-00 Re Automatic Isolation of Main Control Room Ventilation Sys on 841113.Event Occurred Prior to Initial Criticality | |
05000352/LER-1985-102, Submits Info Re Effects of Valve Closure Failure & Leak Rate Info Reported in LER 85-102-00,in Response to Re Martin Request for Info Re Util 851218 Request for Temporary one-time Exemption from App J Schedular Requirements | 3 March 1986 | Submits Info Re Effects of Valve Closure Failure & Leak Rate Info Reported in LER 85-102-00,in Response to Re Martin Request for Info Re Util 851218 Request for Temporary one-time Exemption from App J Schedular Requirements | |
05000352/LER-1986-033, Forwards Rev 1 to LER 86-033 Re Isolation of RWCU Sys on High Differential Flow to Clarify Cause of Event & to Revise Corrective Actions | 27 August 1993 | Forwards Rev 1 to LER 86-033 Re Isolation of RWCU Sys on High Differential Flow to Clarify Cause of Event & to Revise Corrective Actions | |
05000352/LER-1987-066, Forwards LER 87-066-00,correcting Date of Rept from 870107 to 880107 | 7 January 1988 | Forwards LER 87-066-00,correcting Date of Rept from 870107 to 880107 | |
05000352/LER-1988-031, Forwards LER 88-031-02.Safe Shutdown Analysis self- Assessment Program Presented in 890123 Meeting.Assessment Resulted in Determination of Overall Root Cause of Various Reportable Deviations & Schedule for Corrective Actions | 5 April 1989 | Forwards LER 88-031-02.Safe Shutdown Analysis self- Assessment Program Presented in 890123 Meeting.Assessment Resulted in Determination of Overall Root Cause of Various Reportable Deviations & Schedule for Corrective Actions | Safe Shutdown |
05000352/LER-1989-039, Forwards LER 89-039-00 Re 890601 Failure to Meet License Condition 2.C.(3).a Concerning Fire Protection | 3 July 1989 | Forwards LER 89-039-00 Re 890601 Failure to Meet License Condition 2.C.(3).a Concerning Fire Protection | |
05000352/LER-1991-024, Forwards LER 91-024-01 Re Failure to Take Required TS Action When Loop a of ESW Sys Inoperable.Rev Revises Corrective Action Commitments | 8 February 1993 | Forwards LER 91-024-01 Re Failure to Take Required TS Action When Loop a of ESW Sys Inoperable.Rev Revises Corrective Action Commitments | |
05000352/LER-1994-013, Forwards LER 94-013-00 Reporting Condition Prohibited by TSs Re RPS Level Switch Being Valved Out of Svc & Inoperable W/O Associated TS Action Being Met | 6 January 1995 | Forwards LER 94-013-00 Reporting Condition Prohibited by TSs Re RPS Level Switch Being Valved Out of Svc & Inoperable W/O Associated TS Action Being Met | |
05000352/LER-1995-002, Forwards LER 95-002 Re Automatic RPS Actuations on Both Units Resulted from Offsite Electrical Transmission Sys Disturbance | 15 June 1995 | Forwards LER 95-002 Re Automatic RPS Actuations on Both Units Resulted from Offsite Electrical Transmission Sys Disturbance | |
05000352/LER-1995-003, Forwards LER 95-003 Re Unit 1 Maximum Power Level of 100% Was Exceeded by Approx 3.4% | 18 August 1995 | Forwards LER 95-003 Re Unit 1 Maximum Power Level of 100% Was Exceeded by Approx 3.4% | |
05000352/LER-1995-007, Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error | 2 October 1995 | Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error | |
05000352/LER-1996-006, Forwards LER 96-006-01 Re Multiple Instances of Loss of Safety Function of Control Room Emergency Fresh Air Sys, Resulting in Operating Conditions Prohibited by Tech Specs | 19 March 1996 | Forwards LER 96-006-01 Re Multiple Instances of Loss of Safety Function of Control Room Emergency Fresh Air Sys, Resulting in Operating Conditions Prohibited by Tech Specs | |
05000352/LER-1996-018, Forwards LER 96-018-01 Which Discusses Event That Occurred on 960925 Re Inoperability of HPCI Sys Due to Loss of HPCI Turbine Speed Signal Caused by Loose Speed Sensor Connector | 3 February 1997 | Forwards LER 96-018-01 Which Discusses Event That Occurred on 960925 Re Inoperability of HPCI Sys Due to Loss of HPCI Turbine Speed Signal Caused by Loose Speed Sensor Connector | |
05000352/LER-1996-019, Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor | 11 November 1996 | Forwards LER 96-019 Which Repts Operation Prohibited by TS in That Certain Previously Established Surveillance Testing for EDG Did Not Fully Verify Capability to Reject Specified Electrical Load of RHR Pump Motor | |
05000352/LER-1996-021, Forwards LER 96-021-01 Re Ability to Achieve Safe Shutdown in Event of Fire as Provided by Fire Protection Program | 11 April 1997 | Forwards LER 96-021-01 Re Ability to Achieve Safe Shutdown in Event of Fire as Provided by Fire Protection Program | Safe Shutdown Fire Protection Program |
05000352/LER-1996-022, Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Readi | 30 January 1997 | Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Reading | |