Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19323F28219 May 1980Revision to Davis-Besse Nuclear Power Station Unit 1, Cycle 2 - Reload Rept.Boric Acid
Shutdown Margin
ML19344D91422 August 1980to BAW-1598, Davis-Besse Nuclear Power Station, Unit 1,Cycle 2 Reload Rept. Includes Discussion of Revisions for Max Stuck Rod Worth & Rod Insertion LimitsShutdown Margin
ML20006E36530 November 1989Cycle 7 - Reload Rept.Shutdown Margin
ML20024C09231 May 1983Cycle 4 - Reload Rept.Shutdown Margin
Fuel cladding
Power change
ML20041G38328 February 1982Cycle 3 - Reload Rept.Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML20080S48531 October 1983Rev 1 to Davis-Besse Nuclear Power Station Unit 1,Cycle 4 - Reload ReptShutdown Margin
Fuel cladding
Power change
ML20090J25630 April 1984Cycle 5 - Reload ReptShutdown Margin
Power change
ML20091E33512 November 1991Rev 0 to Davis-Besse Unit 1,Cycle 8 Core Operating Limits Rept
ML20091E33831 October 1991Rev 1 to Davis-Besse Nuclear Power Station,Unit 1,Cycle 8 -- Reload Rept
ML20094R32527 November 1995Rev 1 to Davis-Besse Unit 1 Cycle 10 Colr
ML20117H54922 May 1996Rev 0 to Toed Davis-Besse Unit 1 Cycle 11 Colr
ML20117H57131 May 1996Addendum 1 to Rev 1 to Davis-Besse Nuclear Power Station Unit 1,Cycle 11 -- Reload Rept & AddendumShutdown Margin
ML20149H14011 November 1994Rev 0 to Toledo Edison Co Davis-Besse Unit 1 Cycle 10 Colr
ML20154H36830 April 1988Cycle 6-Reload ReptBoric Acid
Shutdown Margin
Fuel cladding
ML20199G63226 January 1998Rev 1 to Davis-Besse Unit 1,Cycle 11,COLR
ML20236E75819 May 1998Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr