Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000413/200300420 October 2003IR 05000413-03-004, IR 05000414-03-004, on 06/29/2003 - 09/27/2003, Catawba Nuclear Station, Units 1 & 2, Other ActivitiesSafe Shutdown
Fire Barrier
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Large early release frequency
Operability Determination
Fire Protection Program
Operability Assessment
IR 05000413/201201011 October 2012EA-12-153, IR 05000413-12-010 and 05000414-12-010, on09/11/2012, Catawba Nuclear Station- Final Significance Determination of One White Finding and One Green Finding and Notice of ViolationSignificance Determination Process
Large early release frequency
Offsite Circuit
IR 05000413/201201120 November 2012IR 05000413-12-011, 05000414-12-011; July 26 - November 14, 2012; Catawba Nuclear Station, Units 1 and 2; NRC Inspection ReportMission time
Enforcement Discretion
Functionality Assessment