Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000354/1985048 | 6 February 1986 | Exam Rept 50-354/85-48 on 851014-23.Exam Results:All 13 Senior Reactor Operator Candidates Passed Oral Exam. One Candidate Failed Written & Simulator Exam.Two of 8 Reactor Operator Candidates Failed Written Exam | Power change |
IR 05000354/1986016 | 30 April 1986 | Exam Rept 50-354/86-16 on 860224-28.Exam results:2 of 7 Reactor Operators & 2 of 11 Senior Reactor Operators Failed Written & Oral Exams & One Instructor Certification Candidate Passed | Shutdown Margin Reactor Vessel Water Level Half scram Fire Barrier Squib Scram Discharge Volume Excess Flow Check Valve Power change |
IR 05000354/1986034 | 8 September 1986 | Exam Rept 50-354/86-34(OL) on 860707-11.Exam Results:All Candidates Passed Operating Exams.One Candidate Failed Written Exam | Shutdown Margin Reactor Vessel Water Level Half scram Scram Discharge Volume Excess Flow Check Valve |
IR 05000354/1988012 | 21 July 1988 | Exam Rept 50-354/88-12OL on 880411-15.Exam Results:Two Senior Operator Candidates & Three Reactor Operator Candidates Passed Exams & One Reactor Operator Candidate Failed Written Exam & Operating Test | Shutdown Margin High Radiation Area |
IR 05000354/1989004 | 5 April 1989 | Exam Rept 50-354/89-04OL on 890214-16.Exam Results:All Three Senior Reactor Operator Candidates Passed Written & Operating Exams.Housekeeping Problems Noted in Diesel Generator Rooms | |
IR 05000354/1989008 | 22 September 1989 | Exam Rept 50-354/89-08OL on 890717-20.Exam Results:All Four Reactor Operator Applicants Passed | |
IR 05000354/1990006 | 16 May 1990 | Exam Rept 50-354/90-06OL on 900320-22.Exam Results:Two Out of Five Senior Reactor Operator Applicants Failed Exams & Licensee Submitted out-of-date Procedure | |
IR 05000354/1990017 | 2 November 1990 | Exam Rept 50-354/90-17OL on 900829,0924-28 & 1001-03.Exam Results:Eight RO & Nine SRO Candidates Passed | |
IR 05000354/1998003 | 16 June 1998 | Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 | |
IR 05000354/1998301 | 4 September 1998 | Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses | High Radiation Area Half scram Temporary Modification B.5.b Scram Discharge Volume Earthquake Failure to Scram |
IR 05000354/1998302 | 13 October 1999 | Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 | Job Performance Measure |
ML20133K283 | 12 October 1985 | Exam Rept 50-354/OL-85-29 on 850708-17.Exam results:8 Reactor operators,11 Senior Reactor Operators & 1 Instructor Certification Candidate Passed Oral & Written Exams.Three Candidates Failed Simulator Exam | Shutdown Margin Loop seal Half scram Overtravel Fuel cladding Offsite Circuit Grace period |
ML20154Q738 | 16 October 1998 | Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams | |
ML20198L953 | 15 October 1997 | NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam | Reactor Vessel Water Level Job Performance Measure |
ML20217M049 | 28 April 1998 | NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 |