Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17334B072 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Cook Units 1 & 2 & Haddam Neck. | |
ML20058D779 | 4 March 1982 | Draft Safety Evaluation, SEP Topic VI-10.A,Testing of RCS & Esf | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20141M833 | 24 February 1986 | Masonry Wall Design,Haddam Neck Plant, Technical Evaluation Rept | Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20155F814 | 28 February 1986 | Second Interval Inservice Insp Program,Haddam Neck Plant Technical Evaluation Rept | |
ML20199L730 | 3 July 1986 | Draft Review of Operating Experience History Through 1984 of Haddam Neck for NRC Isap | Safe Shutdown Boric Acid Packing leak Ultimate heat sink Squib Emergency Lighting Rod Drop Event Earthquake Pressure Boundary Leakage |
ML20205E399 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Ginna,Haddam Neck,Millstone 3 & Harris 1 | |
ML20205N936 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Haddam Neck | Safe Shutdown |
ML20205N943 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1 | |
ML20205N948 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2 | Safe Shutdown |
ML20205N953 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3 | Safe Shutdown |
ML20211P873 | 15 July 1985 | Review of Connecticut Yankee (Haddam Neck) Nuclear Power Plant Probabilistic Safety Study, Interim Rept | |
ML20214M803 | 22 April 1987 | Draft Addendum to Review of Risk-Based Evaluation of Isap Issues for Connecticut Yankee (Haddam Neck) Plant (Addl Issues) | Safe Shutdown Probabilistic Risk Assessment Earthquake Failure to Scram |
ML20214R216 | 31 March 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, Haddam Neck & Millstone 1,2 &3, Informal Rept | |
ML20214R865 | 31 March 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Cook-1 & -2,Haddam Neck, Final Informal Rept | |
ML20246F835 | 30 November 1988 | Technical Evaluation Rept for Haddam Neck Plant Response to Us Nrc,Nrr Generic Ltr 83-37 | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual |
ML20247M636 | 30 November 1988 | Combustion Gas Control Cogap Analysis, Ltr Rept |