Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000016/LER-1998-001, Submits Voluntary LER 98-001 Containing Info of Interest to NRC Which Did Not Specifically Meet Reporting Criteria of Section I.8 of Fermi 1 Ts.Notification Was Made on 980409. Commitment Is Made to Submit Rev to Fermi 1 SAR8 May 1998Submits Voluntary LER 98-001 Containing Info of Interest to NRC Which Did Not Specifically Meet Reporting Criteria of Section I.8 of Fermi 1 Ts.Notification Was Made on 980409. Commitment Is Made to Submit Rev to Fermi 1 SAR
05000341/LER-1986-022, Notifies of Change in Expected Submission Date of Suppl 1 to LER 86-022-00.Extension of Submission Date from 860930 to 861105 Needed So That Activities Re Review of Tech Spec Surveillance Program Can Be Completed24 September 1986Notifies of Change in Expected Submission Date of Suppl 1 to LER 86-022-00.Extension of Submission Date from 860930 to 861105 Needed So That Activities Re Review of Tech Spec Surveillance Program Can Be Completed
05000341/LER-1986-047, Forwards Requested Addl Info Re 861226 Failure of Div 2 Thermal Hydrogen Recombiner,Reported in LER 86-047-003 April 1987Forwards Requested Addl Info Re 861226 Failure of Div 2 Thermal Hydrogen Recombiner,Reported in LER 86-047-00Safe Shutdown
Fuel cladding
05000341/LER-1994-003, Submits List of Commitments Re LER 94-003.Affected Procedures Will Be Modified to Clearly Indicate TS Compliance Steps13 September 1996Submits List of Commitments Re LER 94-003.Affected Procedures Will Be Modified to Clearly Indicate TS Compliance Steps
05000341/LER-1995-001, Forwards LER 95-001 Re Reportable Event That Occurred on 950211.Listed Commitments Made in Ler,Including Clarification of Procedure Requirements to Distinguish Between Use of Test Equipment & Actual Acquisition13 March 1995Forwards LER 95-001 Re Reportable Event That Occurred on 950211.Listed Commitments Made in Ler,Including Clarification of Procedure Requirements to Distinguish Between Use of Test Equipment & Actual AcquisitionTemporary Modification
05000341/LER-1995-004, Forwards LER 95-004.Review of post-scram Feedwater Logic Mod Will Be Conducted.Operator Training for Scram Where Level 2 Reached Will Be Reemphasized During Operator Requalification Training9 May 1995Forwards LER 95-004.Review of post-scram Feedwater Logic Mod Will Be Conducted.Operator Training for Scram Where Level 2 Reached Will Be Reemphasized During Operator Requalification Training
05000341/LER-1995-005, Forwards LER 95-005 Re Reactor Trip Due to High Neutron Flux Caused by Reactor Pressure Transient25 May 1995Forwards LER 95-005 Re Reactor Trip Due to High Neutron Flux Caused by Reactor Pressure Transient
05000341/LER-1995-006, Forwards LER 95-006 Re Main Turbine Trip Due to False Overspeed During Mechanical Overspeed Test30 June 1995Forwards LER 95-006 Re Main Turbine Trip Due to False Overspeed During Mechanical Overspeed Test
05000341/LER-1995-007, Forwards LER 95-007-00 Re Failure to Meet TS Surveillance Requirements Related to EDG Output Breaker re-closure Circuitry,Initiated Following Load Shed27 October 1995Forwards LER 95-007-00 Re Failure to Meet TS Surveillance Requirements Related to EDG Output Breaker re-closure Circuitry,Initiated Following Load Shed
05000341/LER-1995-008, Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power15 November 1996Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power
05000341/LER-1996-001, Forwards LER 96-001-00 Re Identification of Potential for Common Cause Failure of Diesel Generator Cooling Water Function Due to Ice Formation in Pump Column6 March 1996Forwards LER 96-001-00 Re Identification of Potential for Common Cause Failure of Diesel Generator Cooling Water Function Due to Ice Formation in Pump Column
05000341/LER-1996-003, Forwards LER 96-003-00 Re ECCS Being Outside Design Basis of Plant During Safeguards Bus 64C Undervoltage Protection Scheme Functional Testing18 March 1996Forwards LER 96-003-00 Re ECCS Being Outside Design Basis of Plant During Safeguards Bus 64C Undervoltage Protection Scheme Functional Testing
05000341/LER-1996-005, Forwards LER 96-005-01 Re EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Commitments Made by Util, Listed20 August 1998Forwards LER 96-005-01 Re EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Commitments Made by Util, ListedUnanalyzed Condition
05000341/LER-1996-010, Forward LER 96-010-00 Which Documents ESF Actuation Involving Transfer Af HPCI Suction Flow Path from CST to Suppression Pool.Caused by Radio Frequency Interference Driving Output of CST Level19 August 1996Forward LER 96-010-00 Which Documents ESF Actuation Involving Transfer Af HPCI Suction Flow Path from CST to Suppression Pool.Caused by Radio Frequency Interference Driving Output of CST Level
05000341/LER-1996-013, Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised4 November 1996Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised
05000341/LER-1996-015, Forwards LER 96-015 That Documents ESF Actuation of Division 2 Emergency Equipment Cooling Water Sys Which Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell.Commitments Made within Ler,Listed14 November 1996Forwards LER 96-015 That Documents ESF Actuation of Division 2 Emergency Equipment Cooling Water Sys Which Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell.Commitments Made within Ler,Listed
05000341/LER-1996-016, Forwards LER 96-016-01 Which Deals W/Esf Actuation29 April 1997Forwards LER 96-016-01 Which Deals W/Esf Actuation
05000341/LER-1996-017, Forwards LER 96-017-03 Re Failure of SRVs to Open within Specified TS Required Tolerance.Revised Commitments Made by Util,Listed10 November 1997Forwards LER 96-017-03 Re Failure of SRVs to Open within Specified TS Required Tolerance.Revised Commitments Made by Util,Listed
05000341/LER-1996-018, Forwards LER 96-018-00.Commitments Listed Including Rev to Reactor Head Detensioning & Tensioning Procedure5 December 1996Forwards LER 96-018-00.Commitments Listed Including Rev to Reactor Head Detensioning & Tensioning Procedure
05000341/LER-1996-022, Submits LER 96-022 Re Loss of Positive Position Indication in CR for One Main Steam Line SRV6 January 1997Submits LER 96-022 Re Loss of Positive Position Indication in CR for One Main Steam Line SRV
05000341/LER-1996-023, Forwards LER 96-023-00 Documenting Event That Occurred at Fermi 2 on 961224.Commitments Made within Ltr,Listed23 January 1997Forwards LER 96-023-00 Documenting Event That Occurred at Fermi 2 on 961224.Commitments Made within Ltr,Listed
05000341/LER-1997-001, Forwards LER 97-001-00 Re an Error in Mass Flow Conversion Algorithm in Heat Balance Methodology for Calculating Core Thermal Power.Util Commitments Made within Ltr10 March 1997Forwards LER 97-001-00 Re an Error in Mass Flow Conversion Algorithm in Heat Balance Methodology for Calculating Core Thermal Power.Util Commitments Made within Ltr
05000341/LER-1997-002, Forwards LER 97-002 Documenting Failure of HPCI Pump Discharge Valve to Open Upon Manual Demand Signal,During SD Conditions.Util Commitment Is to Evaluate SR & Balance of Plant Valves from Overall Plant Risk Perspective18 March 1997Forwards LER 97-002 Documenting Failure of HPCI Pump Discharge Valve to Open Upon Manual Demand Signal,During SD Conditions.Util Commitment Is to Evaluate SR & Balance of Plant Valves from Overall Plant Risk Perspective
05000341/LER-1997-003, Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed8 May 1997Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed
05000341/LER-1997-004, Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment1 August 1997Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment
05000341/LER-1997-005, Forwards Rev 1 to LER 97-005 Re Inadequate Design or Consideration of Circuits Involved in Achieving Dedicated Shutdown12 May 1997Forwards Rev 1 to LER 97-005 Re Inadequate Design or Consideration of Circuits Involved in Achieving Dedicated Shutdown
05000341/LER-1997-006, Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 627 July 1998Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6
05000341/LER-1997-007, Forwards LER 97-007-00,re Failure of Reactor Building Ventilation Sys Resulting in Loss of Secondary Containment Integrity During Shutdown Conditions.W/Listed Commitments24 April 1997Forwards LER 97-007-00,re Failure of Reactor Building Ventilation Sys Resulting in Loss of Secondary Containment Integrity During Shutdown Conditions.W/Listed Commitments
05000341/LER-1997-008, Forwards LER 97-008-00 Re Potential Common Mode Failure Mechanism That Existed w/480 Volt MCC Fused Disconnect Switches12 May 1997Forwards LER 97-008-00 Re Potential Common Mode Failure Mechanism That Existed w/480 Volt MCC Fused Disconnect Switches
05000341/LER-1997-009, Forwards LER 97-009-00 Re Failure to Inspect Control Rod Drive Housing Support Structure Following Maint in Housing Support Area,Per 10CFR50.73.Commitments Made within Ltr, Listed19 May 1997Forwards LER 97-009-00 Re Failure to Inspect Control Rod Drive Housing Support Structure Following Maint in Housing Support Area,Per 10CFR50.73.Commitments Made within Ltr, Listed
05000341/LER-1997-011, Forwards LER 97-011,documenting Late Performance of Turbine Stop Valve Closure & Turbine Control Fast Closure Channel Functional Tests.Commitments Made Listed6 June 1997Forwards LER 97-011,documenting Late Performance of Turbine Stop Valve Closure & Turbine Control Fast Closure Channel Functional Tests.Commitments Made Listed
05000341/LER-1997-012, Forwards LER 97-012-00,documenting Issues Identified in Performance of Surveillance Testing for Reactor Recirculation Sys Motor Generator Set Mechanical & Electrical Stops.Testing Considered Adequate3 July 1997Forwards LER 97-012-00,documenting Issues Identified in Performance of Surveillance Testing for Reactor Recirculation Sys Motor Generator Set Mechanical & Electrical Stops.Testing Considered Adequate
05000341/LER-1997-014, Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed6 April 1998Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER ListedHourly Fire Watch
05000341/LER-1998-002, Forwards LER 98-002-00,per 10CFR50.73(a)(2)(iv) & 10CFR50.73(a)(2)(i)(B),which Documents Inadvertent Load Shed of ESF Bus 72E During Performance of Surveillance Testing. Commitments Being Made within Ltr,Listed19 March 1998Forwards LER 98-002-00,per 10CFR50.73(a)(2)(iv) & 10CFR50.73(a)(2)(i)(B),which Documents Inadvertent Load Shed of ESF Bus 72E During Performance of Surveillance Testing. Commitments Being Made within Ltr,Listed
05000341/LER-1998-003, Forwards LER 98-003-01,which Addresses Issues Identified as Result of Investigation of Fire Induced Spurious Operation of Valves That Could Cause Inadvertent Opening of Drain Path from CST to Hotwell.Commitments Listed31 July 1998Forwards LER 98-003-01,which Addresses Issues Identified as Result of Investigation of Fire Induced Spurious Operation of Valves That Could Cause Inadvertent Opening of Drain Path from CST to Hotwell.Commitments ListedHot Short
05000341/LER-1998-004, Forwards LER 98-004-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed18 August 1998Forwards LER 98-004-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed
05000341/LER-1998-005, Forwards LER 98-005-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed1 October 1998Forwards LER 98-005-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed
05000341/LER-1998-006, Forwards LER 98-006-01,providing Cause & Results of Repair or Rework & Testing for MSIVs Which Failed to Meet Specified Leakage Limits of TS 3.6.1.2 During Sixth RO13 November 1998Forwards LER 98-006-01,providing Cause & Results of Repair or Rework & Testing for MSIVs Which Failed to Meet Specified Leakage Limits of TS 3.6.1.2 During Sixth RO
05000341/LER-1998-007, Forwards LER 98-007-00,which Documents Inadvertent Deenergization of Safety Buses 65E,72E,13EC & 72EC When EDG 13 Outbreaker Opened During Performance of Surveillance Testing.Resulting in Several ESF Actuations5 October 1998Forwards LER 98-007-00,which Documents Inadvertent Deenergization of Safety Buses 65E,72E,13EC & 72EC When EDG 13 Outbreaker Opened During Performance of Surveillance Testing.Resulting in Several ESF Actuations
05000341/LER-1998-008, Forwards LER 98-008-01,re Inboard Pressure Isolation Valve Which Did Not Meet Required Leakage Limits.Revised LER Documents One Previous Occasion Where Inboard Pressure Isolation Valve Did Not Meet Required Leakage Limits26 March 1999Forwards LER 98-008-01,re Inboard Pressure Isolation Valve Which Did Not Meet Required Leakage Limits.Revised LER Documents One Previous Occasion Where Inboard Pressure Isolation Valve Did Not Meet Required Leakage Limits
DD-86-10, Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 86082726 August 1986Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 860827
DD-88-11, Forwards Director'S Decision DD-88-11,denying 880204 Petition to Overturn NRC Decision to Allow Plant to Operate at 100% Power,Revoke License NPF-43 & Require Util to Prove That Operation of Plant Deemed Safe28 July 1988Forwards Director'S Decision DD-88-11,denying 880204 Petition to Overturn NRC Decision to Allow Plant to Operate at 100% Power,Revoke License NPF-43 & Require Util to Prove That Operation of Plant Deemed Safe
IA-84-552, Third Partial Response to FOIA Request for Documents Re 840626-27 Full Scale Joint Emergency Exercise & as to Whether Facility Meets Stds of 10CFR50..47.Forwards App a Documents.App B Documents Available in PDR27 December 1984Third Partial Response to FOIA Request for Documents Re 840626-27 Full Scale Joint Emergency Exercise & as to Whether Facility Meets Stds of 10CFR50..47.Forwards App a Documents.App B Documents Available in PDR
IA-85-271, Responds to FOIA Request for Records Since Jan 1985, Evidencing Request by Individual or Group of Work Stoppage, Licensing Investigation or Other Related Investigation of Plant.Je Putenney 850128 Ltr Encl28 May 1985Responds to FOIA Request for Records Since Jan 1985, Evidencing Request by Individual or Group of Work Stoppage, Licensing Investigation or Other Related Investigation of Plant.Je Putenney 850128 Ltr EnclSafe Shutdown
IA-85-359, Responds to FOIA Request for Documents Re NRC Application of Decommissioning Rule to Power & Nonpower Reactors Permanently Shut Down & Effect Proposed Rule Will Have on Decommissioning Humboldt Bay24 July 1985Responds to FOIA Request for Documents Re NRC Application of Decommissioning Rule to Power & Nonpower Reactors Permanently Shut Down & Effect Proposed Rule Will Have on Decommissioning Humboldt Bay
IA-85-776, Responds to FOIA Request for Documents Re Land Surveys & Water Tables at Plant.Documents Listed on App a Available Through Gpo.Forwards App B Documents.App B Documents Also Available in PDR19 December 1985Responds to FOIA Request for Documents Re Land Surveys & Water Tables at Plant.Documents Listed on App a Available Through Gpo.Forwards App B Documents.App B Documents Also Available in PDR
IA-85-834, Responds to FOIA Request for Ofc of Investigation Rept on Facility 850702 Inadvertent Criticality Incident.No Written Communications Available.Rept Currently Under Review & Will Not Be Released to Public (Ref FOIA Exemption 7)5 February 1986Responds to FOIA Request for Ofc of Investigation Rept on Facility 850702 Inadvertent Criticality Incident.No Written Communications Available.Rept Currently Under Review & Will Not Be Released to Public (Ref FOIA Exemption 7)
IA-86-137, Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR19 March 1986Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR
IA-86-362, Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4)19 June 1987Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4)
IA-86-374, Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR26 September 1986Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR