05000016/LER-1998-001, Submits Voluntary LER 98-001 Containing Info of Interest to NRC Which Did Not Specifically Meet Reporting Criteria of Section I.8 of Fermi 1 Ts.Notification Was Made on 980409. Commitment Is Made to Submit Rev to Fermi 1 SAR | 8 May 1998 | Submits Voluntary LER 98-001 Containing Info of Interest to NRC Which Did Not Specifically Meet Reporting Criteria of Section I.8 of Fermi 1 Ts.Notification Was Made on 980409. Commitment Is Made to Submit Rev to Fermi 1 SAR | |
05000341/LER-1986-022, Notifies of Change in Expected Submission Date of Suppl 1 to LER 86-022-00.Extension of Submission Date from 860930 to 861105 Needed So That Activities Re Review of Tech Spec Surveillance Program Can Be Completed | 24 September 1986 | Notifies of Change in Expected Submission Date of Suppl 1 to LER 86-022-00.Extension of Submission Date from 860930 to 861105 Needed So That Activities Re Review of Tech Spec Surveillance Program Can Be Completed | |
05000341/LER-1986-047, Forwards Requested Addl Info Re 861226 Failure of Div 2 Thermal Hydrogen Recombiner,Reported in LER 86-047-00 | 3 April 1987 | Forwards Requested Addl Info Re 861226 Failure of Div 2 Thermal Hydrogen Recombiner,Reported in LER 86-047-00 | Safe Shutdown Fuel cladding |
05000341/LER-1994-003, Submits List of Commitments Re LER 94-003.Affected Procedures Will Be Modified to Clearly Indicate TS Compliance Steps | 13 September 1996 | Submits List of Commitments Re LER 94-003.Affected Procedures Will Be Modified to Clearly Indicate TS Compliance Steps | |
05000341/LER-1995-001, Forwards LER 95-001 Re Reportable Event That Occurred on 950211.Listed Commitments Made in Ler,Including Clarification of Procedure Requirements to Distinguish Between Use of Test Equipment & Actual Acquisition | 13 March 1995 | Forwards LER 95-001 Re Reportable Event That Occurred on 950211.Listed Commitments Made in Ler,Including Clarification of Procedure Requirements to Distinguish Between Use of Test Equipment & Actual Acquisition | Temporary Modification |
05000341/LER-1995-004, Forwards LER 95-004.Review of post-scram Feedwater Logic Mod Will Be Conducted.Operator Training for Scram Where Level 2 Reached Will Be Reemphasized During Operator Requalification Training | 9 May 1995 | Forwards LER 95-004.Review of post-scram Feedwater Logic Mod Will Be Conducted.Operator Training for Scram Where Level 2 Reached Will Be Reemphasized During Operator Requalification Training | |
05000341/LER-1995-005, Forwards LER 95-005 Re Reactor Trip Due to High Neutron Flux Caused by Reactor Pressure Transient | 25 May 1995 | Forwards LER 95-005 Re Reactor Trip Due to High Neutron Flux Caused by Reactor Pressure Transient | |
05000341/LER-1995-006, Forwards LER 95-006 Re Main Turbine Trip Due to False Overspeed During Mechanical Overspeed Test | 30 June 1995 | Forwards LER 95-006 Re Main Turbine Trip Due to False Overspeed During Mechanical Overspeed Test | |
05000341/LER-1995-007, Forwards LER 95-007-00 Re Failure to Meet TS Surveillance Requirements Related to EDG Output Breaker re-closure Circuitry,Initiated Following Load Shed | 27 October 1995 | Forwards LER 95-007-00 Re Failure to Meet TS Surveillance Requirements Related to EDG Output Breaker re-closure Circuitry,Initiated Following Load Shed | |
05000341/LER-1995-008, Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power | 15 November 1996 | Provides Commitment Made Re Suppl to LER 95-008 Concerning Nonconservative Bias in Heat Balance Methodology for Calculating Core Thermal Power | |
05000341/LER-1996-001, Forwards LER 96-001-00 Re Identification of Potential for Common Cause Failure of Diesel Generator Cooling Water Function Due to Ice Formation in Pump Column | 6 March 1996 | Forwards LER 96-001-00 Re Identification of Potential for Common Cause Failure of Diesel Generator Cooling Water Function Due to Ice Formation in Pump Column | |
05000341/LER-1996-003, Forwards LER 96-003-00 Re ECCS Being Outside Design Basis of Plant During Safeguards Bus 64C Undervoltage Protection Scheme Functional Testing | 18 March 1996 | Forwards LER 96-003-00 Re ECCS Being Outside Design Basis of Plant During Safeguards Bus 64C Undervoltage Protection Scheme Functional Testing | |
05000341/LER-1996-005, Forwards LER 96-005-01 Re EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Commitments Made by Util, Listed | 20 August 1998 | Forwards LER 96-005-01 Re EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Commitments Made by Util, Listed | Unanalyzed Condition |
05000341/LER-1996-010, Forward LER 96-010-00 Which Documents ESF Actuation Involving Transfer Af HPCI Suction Flow Path from CST to Suppression Pool.Caused by Radio Frequency Interference Driving Output of CST Level | 19 August 1996 | Forward LER 96-010-00 Which Documents ESF Actuation Involving Transfer Af HPCI Suction Flow Path from CST to Suppression Pool.Caused by Radio Frequency Interference Driving Output of CST Level | |
05000341/LER-1996-013, Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised | 4 November 1996 | Forwards LER 96-013-00.Reactor Recirculation Pump Motor Power Instrument Loop Will Be Added to Configuration Mgt Sys & Associated Calibr Instruction Will Be Revised | |
05000341/LER-1996-015, Forwards LER 96-015 That Documents ESF Actuation of Division 2 Emergency Equipment Cooling Water Sys Which Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell.Commitments Made within Ler,Listed | 14 November 1996 | Forwards LER 96-015 That Documents ESF Actuation of Division 2 Emergency Equipment Cooling Water Sys Which Occurred During Fill & Vent Evolution of Portion of Sys Located in Drywell.Commitments Made within Ler,Listed | |
05000341/LER-1996-016, Forwards LER 96-016-01 Which Deals W/Esf Actuation | 29 April 1997 | Forwards LER 96-016-01 Which Deals W/Esf Actuation | |
05000341/LER-1996-017, Forwards LER 96-017-03 Re Failure of SRVs to Open within Specified TS Required Tolerance.Revised Commitments Made by Util,Listed | 10 November 1997 | Forwards LER 96-017-03 Re Failure of SRVs to Open within Specified TS Required Tolerance.Revised Commitments Made by Util,Listed | |
05000341/LER-1996-018, Forwards LER 96-018-00.Commitments Listed Including Rev to Reactor Head Detensioning & Tensioning Procedure | 5 December 1996 | Forwards LER 96-018-00.Commitments Listed Including Rev to Reactor Head Detensioning & Tensioning Procedure | |
05000341/LER-1996-022, Submits LER 96-022 Re Loss of Positive Position Indication in CR for One Main Steam Line SRV | 6 January 1997 | Submits LER 96-022 Re Loss of Positive Position Indication in CR for One Main Steam Line SRV | |
05000341/LER-1996-023, Forwards LER 96-023-00 Documenting Event That Occurred at Fermi 2 on 961224.Commitments Made within Ltr,Listed | 23 January 1997 | Forwards LER 96-023-00 Documenting Event That Occurred at Fermi 2 on 961224.Commitments Made within Ltr,Listed | |
05000341/LER-1997-001, Forwards LER 97-001-00 Re an Error in Mass Flow Conversion Algorithm in Heat Balance Methodology for Calculating Core Thermal Power.Util Commitments Made within Ltr | 10 March 1997 | Forwards LER 97-001-00 Re an Error in Mass Flow Conversion Algorithm in Heat Balance Methodology for Calculating Core Thermal Power.Util Commitments Made within Ltr | |
05000341/LER-1997-002, Forwards LER 97-002 Documenting Failure of HPCI Pump Discharge Valve to Open Upon Manual Demand Signal,During SD Conditions.Util Commitment Is to Evaluate SR & Balance of Plant Valves from Overall Plant Risk Perspective | 18 March 1997 | Forwards LER 97-002 Documenting Failure of HPCI Pump Discharge Valve to Open Upon Manual Demand Signal,During SD Conditions.Util Commitment Is to Evaluate SR & Balance of Plant Valves from Overall Plant Risk Perspective | |
05000341/LER-1997-003, Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed | 8 May 1997 | Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed | |
05000341/LER-1997-004, Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment | 1 August 1997 | Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment | |
05000341/LER-1997-005, Forwards Rev 1 to LER 97-005 Re Inadequate Design or Consideration of Circuits Involved in Achieving Dedicated Shutdown | 12 May 1997 | Forwards Rev 1 to LER 97-005 Re Inadequate Design or Consideration of Circuits Involved in Achieving Dedicated Shutdown | |
05000341/LER-1997-006, Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6 | 27 July 1998 | Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6 | |
05000341/LER-1997-007, Forwards LER 97-007-00,re Failure of Reactor Building Ventilation Sys Resulting in Loss of Secondary Containment Integrity During Shutdown Conditions.W/Listed Commitments | 24 April 1997 | Forwards LER 97-007-00,re Failure of Reactor Building Ventilation Sys Resulting in Loss of Secondary Containment Integrity During Shutdown Conditions.W/Listed Commitments | |
05000341/LER-1997-008, Forwards LER 97-008-00 Re Potential Common Mode Failure Mechanism That Existed w/480 Volt MCC Fused Disconnect Switches | 12 May 1997 | Forwards LER 97-008-00 Re Potential Common Mode Failure Mechanism That Existed w/480 Volt MCC Fused Disconnect Switches | |
05000341/LER-1997-009, Forwards LER 97-009-00 Re Failure to Inspect Control Rod Drive Housing Support Structure Following Maint in Housing Support Area,Per 10CFR50.73.Commitments Made within Ltr, Listed | 19 May 1997 | Forwards LER 97-009-00 Re Failure to Inspect Control Rod Drive Housing Support Structure Following Maint in Housing Support Area,Per 10CFR50.73.Commitments Made within Ltr, Listed | |
05000341/LER-1997-011, Forwards LER 97-011,documenting Late Performance of Turbine Stop Valve Closure & Turbine Control Fast Closure Channel Functional Tests.Commitments Made Listed | 6 June 1997 | Forwards LER 97-011,documenting Late Performance of Turbine Stop Valve Closure & Turbine Control Fast Closure Channel Functional Tests.Commitments Made Listed | |
05000341/LER-1997-012, Forwards LER 97-012-00,documenting Issues Identified in Performance of Surveillance Testing for Reactor Recirculation Sys Motor Generator Set Mechanical & Electrical Stops.Testing Considered Adequate | 3 July 1997 | Forwards LER 97-012-00,documenting Issues Identified in Performance of Surveillance Testing for Reactor Recirculation Sys Motor Generator Set Mechanical & Electrical Stops.Testing Considered Adequate | |
05000341/LER-1997-014, Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed | 6 April 1998 | Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed | Hourly Fire Watch |
05000341/LER-1998-002, Forwards LER 98-002-00,per 10CFR50.73(a)(2)(iv) & 10CFR50.73(a)(2)(i)(B),which Documents Inadvertent Load Shed of ESF Bus 72E During Performance of Surveillance Testing. Commitments Being Made within Ltr,Listed | 19 March 1998 | Forwards LER 98-002-00,per 10CFR50.73(a)(2)(iv) & 10CFR50.73(a)(2)(i)(B),which Documents Inadvertent Load Shed of ESF Bus 72E During Performance of Surveillance Testing. Commitments Being Made within Ltr,Listed | |
05000341/LER-1998-003, Forwards LER 98-003-01,which Addresses Issues Identified as Result of Investigation of Fire Induced Spurious Operation of Valves That Could Cause Inadvertent Opening of Drain Path from CST to Hotwell.Commitments Listed | 31 July 1998 | Forwards LER 98-003-01,which Addresses Issues Identified as Result of Investigation of Fire Induced Spurious Operation of Valves That Could Cause Inadvertent Opening of Drain Path from CST to Hotwell.Commitments Listed | Hot Short |
05000341/LER-1998-004, Forwards LER 98-004-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed | 18 August 1998 | Forwards LER 98-004-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed | |
05000341/LER-1998-005, Forwards LER 98-005-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed | 1 October 1998 | Forwards LER 98-005-00 Documenting Unplanned Manual Reactor Scram in Response to Reactor Power Fluctuations.Commitment Made by Util,Listed | |
05000341/LER-1998-006, Forwards LER 98-006-01,providing Cause & Results of Repair or Rework & Testing for MSIVs Which Failed to Meet Specified Leakage Limits of TS 3.6.1.2 During Sixth RO | 13 November 1998 | Forwards LER 98-006-01,providing Cause & Results of Repair or Rework & Testing for MSIVs Which Failed to Meet Specified Leakage Limits of TS 3.6.1.2 During Sixth RO | |
05000341/LER-1998-007, Forwards LER 98-007-00,which Documents Inadvertent Deenergization of Safety Buses 65E,72E,13EC & 72EC When EDG 13 Outbreaker Opened During Performance of Surveillance Testing.Resulting in Several ESF Actuations | 5 October 1998 | Forwards LER 98-007-00,which Documents Inadvertent Deenergization of Safety Buses 65E,72E,13EC & 72EC When EDG 13 Outbreaker Opened During Performance of Surveillance Testing.Resulting in Several ESF Actuations | |
05000341/LER-1998-008, Forwards LER 98-008-01,re Inboard Pressure Isolation Valve Which Did Not Meet Required Leakage Limits.Revised LER Documents One Previous Occasion Where Inboard Pressure Isolation Valve Did Not Meet Required Leakage Limits | 26 March 1999 | Forwards LER 98-008-01,re Inboard Pressure Isolation Valve Which Did Not Meet Required Leakage Limits.Revised LER Documents One Previous Occasion Where Inboard Pressure Isolation Valve Did Not Meet Required Leakage Limits | |
DD-86-10, Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 860827 | 26 August 1986 | Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 860827 | |
DD-88-11, Forwards Director'S Decision DD-88-11,denying 880204 Petition to Overturn NRC Decision to Allow Plant to Operate at 100% Power,Revoke License NPF-43 & Require Util to Prove That Operation of Plant Deemed Safe | 28 July 1988 | Forwards Director'S Decision DD-88-11,denying 880204 Petition to Overturn NRC Decision to Allow Plant to Operate at 100% Power,Revoke License NPF-43 & Require Util to Prove That Operation of Plant Deemed Safe | |
IA-84-552, Third Partial Response to FOIA Request for Documents Re 840626-27 Full Scale Joint Emergency Exercise & as to Whether Facility Meets Stds of 10CFR50..47.Forwards App a Documents.App B Documents Available in PDR | 27 December 1984 | Third Partial Response to FOIA Request for Documents Re 840626-27 Full Scale Joint Emergency Exercise & as to Whether Facility Meets Stds of 10CFR50..47.Forwards App a Documents.App B Documents Available in PDR | |
IA-85-271, Responds to FOIA Request for Records Since Jan 1985, Evidencing Request by Individual or Group of Work Stoppage, Licensing Investigation or Other Related Investigation of Plant.Je Putenney 850128 Ltr Encl | 28 May 1985 | Responds to FOIA Request for Records Since Jan 1985, Evidencing Request by Individual or Group of Work Stoppage, Licensing Investigation or Other Related Investigation of Plant.Je Putenney 850128 Ltr Encl | Safe Shutdown |
IA-85-359, Responds to FOIA Request for Documents Re NRC Application of Decommissioning Rule to Power & Nonpower Reactors Permanently Shut Down & Effect Proposed Rule Will Have on Decommissioning Humboldt Bay | 24 July 1985 | Responds to FOIA Request for Documents Re NRC Application of Decommissioning Rule to Power & Nonpower Reactors Permanently Shut Down & Effect Proposed Rule Will Have on Decommissioning Humboldt Bay | |
IA-85-776, Responds to FOIA Request for Documents Re Land Surveys & Water Tables at Plant.Documents Listed on App a Available Through Gpo.Forwards App B Documents.App B Documents Also Available in PDR | 19 December 1985 | Responds to FOIA Request for Documents Re Land Surveys & Water Tables at Plant.Documents Listed on App a Available Through Gpo.Forwards App B Documents.App B Documents Also Available in PDR | |
IA-85-834, Responds to FOIA Request for Ofc of Investigation Rept on Facility 850702 Inadvertent Criticality Incident.No Written Communications Available.Rept Currently Under Review & Will Not Be Released to Public (Ref FOIA Exemption 7) | 5 February 1986 | Responds to FOIA Request for Ofc of Investigation Rept on Facility 850702 Inadvertent Criticality Incident.No Written Communications Available.Rept Currently Under Review & Will Not Be Released to Public (Ref FOIA Exemption 7) | |
IA-86-137, Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR | 19 March 1986 | Final Response to FOIA Request for Weekly/Monthly Repts of Power Consumption by Toledo Edison & Cpc.Records Subj to Request Available in PDR | |
IA-86-362, Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4) | 19 June 1987 | Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4) | |
IA-86-374, Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR | 26 September 1986 | Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR | |