Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML12020A23611 January 2012Duke Energy
Repko R
Relief Request Serial # 12-MN-002, Limited Weld Examinations During Refueling Outage 2EOC20Request
ML12062A0151 March 2012Jacqueline Thompson
Plant Licensing Branch II
NRR E-mail Capture - Request for Additional Information for Relief Request 12-MN-002 Submitted January 11, 2012RAI
ML12124A27323 April 2012Duke Energy
Repko R
Relief Request Serial # 12-MN-002, Response to Request for Additional Information on Limited Weld Examinations During Refueling Outage 2EOC20Response to RAI
ML13010A55414 January 2013Robert Pascarelli
Plant Licensing Branch II
Proposed Relief Request 12-MN-002Other