Letter Sequence RAI |
---|
|
|
MONTHYEARML12020A2362012-01-11011 January 2012 Relief Request Serial # 12-MN-002, Limited Weld Examinations During Refueling Outage 2EOC20 Project stage: Request ML12062A0152012-03-0101 March 2012 NRR E-mail Capture - Request for Additional Information for Relief Request 12-MN-002 Submitted January 11, 2012 Project stage: RAI ML12124A2732012-04-23023 April 2012 Relief Request Serial # 12-MN-002, Response to Request for Additional Information on Limited Weld Examinations During Refueling Outage 2EOC20 Project stage: Response to RAI ML13010A5542013-01-14014 January 2013 Proposed Relief Request 12-MN-002 Project stage: Other 2012-03-01
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24207A0862024-07-24024 July 2024 Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps ML24197A1702024-07-15015 July 2024 Request for Additional Information Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations ML24179A1292024-06-24024 June 2024 Acceptance Review for LAR to Revise TS to Adopt TSTF-234-A, Revision 1 ML24033A2372024-02-0202 February 2024 Acceptance of Requested Licensing Action Two Proposed Alternatives (RA-23-0242) for the Inspection of Reactor Vessel Closure Head Penetrations (Epids L-2024-LLR-0002 and L-2024-LLR-0003) ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds ML22242A1602022-08-30030 August 2022 Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22049B0152022-02-17017 February 2022 NRC RP Inspection Document Request Letter ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22024A3952022-01-24024 January 2022 Acceptance of Requested Licensing Action Amendment McGuire RCS PT Limits Change TS 3.4.3 and EFPY Changes ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21195A2022021-07-14014 July 2021 NRR E-mail Capture - McGuire Relief Request Acceptance Review Results; McGuire Unit 1 RR, Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask ML21096A2512021-04-0505 April 2021 NRR E-mail Capture - McGuire Emergency Plan Submittal, Letter Dated March 31 2021 ML21067A6742021-03-0505 March 2021 NRR E-mail Capture - Final Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20216A3512020-08-0303 August 2020 Mcquire U-1 ISI RFI ML20177A3792020-06-23023 June 2020 Email from L. Cox, North Carolina Department of Health and Human Services to NRC Regarding Exemption Request for Duke Energy'S McGuire Nuclear Station ML20140A0852020-05-19019 May 2020 ADAMS 2D ML20101L3132020-04-10010 April 2020 Notification of Inspection and Request for Information 2024-07-24
[Table view] |
Text
NRR-PMDAPEm Resource From: Thompson, Jon Sent: Thursday, March 01, 2012 2:51 PM To: Ashe, Ken; Vu, Phong T Cc: Salgado, Nancy; Lupold, Timothy; Rezai, Ali; Sydnor, Christopher
Subject:
Request for Additional Information for Relief Request 12-MN-002 submitted January 11, 2012
SUBJECT:
MCGUIRE NUCLEAR STATION, UNIT 2 (MCGUIRE 2), REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING RELIEF REQUEST (RR) 12-MN-002, LIMITED WELD EXAMINATIONS DURING REFUELING OUTAGE 2EOC20 (TAC NO. ME7877)
By letter dated January 11, 2012, Duke Energy Carolinas, LLC (the licensee), submitted the subject RR for McGuire 2. The U.S. Nuclear Regulatory Commission staff has reviewed the licensees submittal and determined that an RAI is needed in order to complete our review. The enclosed document describes this RAI. A written response should be provided to the NRC staff for these RAI questions within 30 days of this request. Please inform me as soon as possible if you are unable to support this response timeframe.
If you have any questions, please call me at 301-415-1119.
Sincerely, Jon Thompson, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-370
Enclosure:
As stated OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 12-MN-002 LIMITED WELD EXAMINATIONS DURING REFUELING OUTAGE 2EOC20 DUKE ENERGY CAROLINAS, LLC MCGUIRE NUCLEAR STATION, UNIT 2 DOCKET NO. 50-370 By letter dated January 11, 2012, Duke Energy Carolina, LLC (the licensee) submitted Relief Request (RR) 12-MN-002 for McGuire Nuclear Station, Unit 2 (McGuire 2), Limited Weld Examinations During Refueling Outage 2EOC20 (Agencywide Documents Access and Management System Accession No. ML12020A236) for the U.S. Nuclear Regulatory Commission (NRC) review and approval. The licensee requested relief from the volumetric coverage requirement for weld examinations specified in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI. RR 12-MN-002 is requested for the third 10-year in service inspection (ISI) interval of McGuire 2, which commenced on March 1, 2004, and will end on July 15, 2014.
To complete its review, the NRC staff requires the following additional information:
- 1. Discuss the piping system for which relief is requested. Specify the ASME Code class type (e.g., Class 1, 2, or 3 piping). Provide material specifications for the weld and associated piping.
1
- 2. Discuss the ISI examinations history (e.g, inspection years, disposition, and results) of the subject weld. Also, discuss whether any fabrication defects were detected in the pre-service inspection (PSI),
and the disposition of identified defects.
- 3. Section 2.7 on page 3 of RR 12-MN-002 states, Ultrasonic examination of the weld for the Item Number M2.R1.11.0276 was conducted using personnel, equipment, and procedures qualified in accordance with ASME Section XI, 1998 Edition with the 2000 Addenda. Clarify which subarticles and/or appendices of the ASME Code,Section XI, were used for ultrasonic testing (UT) qualifications.
If Appendix VIII was used, provide the supplement(s) number that is applicable to RR 12-MN-002.
- 4. The UT examinations reports on Page 1 and 2 in Attachment A of RR 12-MN-002 show that the result for UT examinations marked as Reject, even though the reports indicated that no indications were found. Discuss why the results of UT examinations were called Reject.
- 5. Table 4.1 1, Examination Category R A, Item No. R1.11, in the Topical Report (TP) by Westinghouse Owners Group WCAP-14572 Rev. 1 NP-A, Supplement 2, Westinghouse Owners Group Application of Risk Informed Methods to Piping Inservice Inspection Topical Report Clarifications, was referenced in RR 12-MN-002. The NRC staff notes that Item No. R1.11 of Table 4.1.1 considers the weld for which relief is requested to be prone to potential degradation by thermal fatigue. Discuss whether any supplemental inspection was performed on the volume not examined by UT to ensure structural integrity of the system.
- 6. Discuss any industry or plant-specific operating experience regarding potential degradation (e.g, stress corrosion cracking (SCC) and corrosion) and potential severe loading (e.g., vibration, water hammer, and overloading) for the subject weld and associated components.
Enclosure 2
Hearing Identifier: NRR_PMDA Email Number: 284 Mail Envelope Properties (Jon.Thompson@nrc.gov20120301145100)
Subject:
Request for Additional Information for Relief Request 12-MN-002 submitted January 11, 2012 Sent Date: 3/1/2012 2:51:06 PM Received Date: 3/1/2012 2:51:00 PM From: Thompson, Jon Created By: Jon.Thompson@nrc.gov Recipients:
"Salgado, Nancy" <Nancy.Salgado@nrc.gov>
Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>
Tracking Status: None "Rezai, Ali" <Ali.Rezai@nrc.gov>
Tracking Status: None "Sydnor, Christopher" <Christopher.Sydnor@nrc.gov>
Tracking Status: None "Ashe, Ken" <Ken.Ashe@duke-energy.com>
Tracking Status: None "Vu, Phong T" <Phong.Vu@duke-energy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4358 3/1/2012 2:51:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: